|
E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br /> a. TOTAL b. WITH THIS FIRM
<br /> David A.Smith,Ph.D.,P.E. Senior Coastal Engineer 30 16
<br /> 15. FIRM NAME and LOCATION(City and State)
<br /> Sea Engineering,Inc.
<br /> 16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION(State and Discipline)
<br /> Ph.D.,University of Hawaii-Manoa,Ocean Engineering Hawaii Professional Engineer
<br /> M.S.,University of Hawaii-Manoa,Ocean Engineering Guam Professional Engineer
<br /> B.S.,University of Hawaii-Manoa,Mathematics California Professional Engineer
<br /> 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications, Organizations, Training,Awards,etc.)
<br /> Member—ASCE PADI Open Water Diver Certification,Nitrox Certification
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
<br /> Kamehameha Highway Shoreline Erosion Mitigation Professional Services Construction
<br /> Kaaawa,Oahu 2020 to present
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE IE Check if project performed with current firm
<br /> a. Sea Engineering, Inc. has been contracted by AECOM for HDOT Highways Division to assist with implementation of
<br /> temporary erosion protection for Kamehameha Highway at Kaaawa, Oahu. Work tasks include preparation of a basis of
<br /> design report, an environmental assessment, construction drawings for selected plan, the Department of the Army permit
<br /> application,as well as community outreach.
<br /> Cost: $30,695 Role:Coastal Engineer
<br /> (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
<br /> Windward Highway Shore Protection
<br /> Windward Oahu 2021 to present n/a
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
<br /> b. Sea Engineering, Inc., has been contracted by AECOM for HDOT Highways Division to prepare a Draft and Final Basis
<br /> (BOD) report in support of the Windward Oahu Highway erosion mitigation project. Additional work tasks include
<br /> consultations with Federal, State, City & County agencies, neighborhood boards, and citizen groups; prepare technical
<br /> sections for a DEA;prepare construction plans and the necessary permit applications for construction.
<br /> Cost: $264,261 Role:Coastal Engineer
<br /> (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
<br /> Hilo Harbor Breakwater Improvements—Basis of Design Professional Services Construction
<br /> Hilo,Hawaii 2023 n/a
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
<br /> Recent inspections of the Hilo breakwater have found areas of possible damage. As a result of the inspections,repairs have
<br /> C. been recommended.In support of the need for repairs,Sea Engineering,Inc.(SE)had been contracted by Cardno GS and the
<br /> U.S. Corps of Engineers(USCOE)to conduct high resolution numerical modeling of wave conditions on the breakwater at
<br /> selected future sea levels to determine stability and vulnerability of the breakwater.SE then developed several repair designs
<br /> to address the existing and future vulnerabilities.
<br /> Cost: $381,189 Role:Project Manager/Senior Coastal Engineer
<br /> (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
<br /> Laupahoehoe Harbor Repair Design Professional Services Construction
<br /> Laupahoehoe,Hawaii 2023 n/a
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
<br /> In 2019,USACE retained the services of Nagamine Okawa Engineers, Inc. and Sea Engineering, Inc. (SE)to evaluate the
<br /> d. condition of the existing breakwater,develop and compare alternative repair plans,and develop conceptual repair plans and
<br /> rough order of magnitude construction costs under the U.S.Army Corps of Engineers(USACE)Operations&Maintenance
<br /> (O&M)program.In 2020,USACE retained the services of Cardno GS,Inc.,and SE to develop the repair plan through final
<br /> design.
<br /> Cost:$141,640 Role:Project Manager/Coastal Engineer
<br /> (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
<br /> Waikoloa Beach Management Plan Professional Services Construction
<br /> Waikoloa,Hawaii 2021 n/a
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
<br /> During a tsunami in March 2011 the beach at Anahoomalu Bay was severely eroded. To ensure the continued stability of
<br /> e.. their beach, and address concerns about sea level rise,the Waikoloa Land Company and Waikoloa Beach Association had
<br /> contracted Sea Engineering to develop a long-term plan for management and maintenance. Work included beach change
<br /> monitoring, coastal assessment and preliminary concept plan, offshore sand survey, development of a detailed beach
<br /> maintenance/management plan, environmental assessment and permit application, and detailed design and construction
<br /> documents.
<br /> Cost: $36,760 Role:Coastal Engineer
<br />
|