E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br /> Scott P.Sullivan,Senior Coastal Engineer Project Manager a. TOTAL b. WITH FIRM
<br /> Senior Coastal Engineer 51 51
<br /> 15. FIRM NAME and LOCATION(City and State)
<br /> Sea Engineering,Inc.
<br /> 16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION(State and Discipline)
<br /> M.S.Ocean Engineering
<br /> B.S.Mechanical Engineering
<br /> 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications, Organizations, Training,Awards,etc.)
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
<br /> Waikiki Beach Restoration Professional Services Construction
<br /> Honolulu,Hawaii 2016 to present
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE El Check if project performed with current firm
<br /> a. Sea Engineering,Inc.,under contract to the State of Hawaii,Department of Land and Natural Resources in support of developing
<br /> a more stable,resilient, and sustainable beach configuration in Waikiki. The general scope of work includes a feasibility study,
<br /> environmental impact statement and conceptual design and permitting for beach improvements.
<br /> Cost: $799,300 Role:Project Manager/Coastal Engineer
<br /> (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
<br /> Windward Highway Shore Protection Professional Services Construction
<br /> Windward Oahu 2021 to present
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE El Check if project performed with current firm
<br /> b. Sea Engineering,Inc.,has been contracted by AECOM for HDOT Highways Division to prepare a Draft and Final Basis(BOD)
<br /> report in support of the Windward Oahu Highway erosion mitigation project. Additional work tasks include consultations with
<br /> Federal, State,City &County agencies,neighborhood boards,and citizen groups;prepare technical sections for a DEA;prepare
<br /> construction plans and the necessary permit applications for construction.
<br /> Cost: $264,261 Role: Senior Coastal Engineer
<br /> (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
<br /> Waikoloa Beach Management Plan Professional Services Construction
<br /> Waikoloa,Hawaii 2021
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE El Check if project performed with current firm
<br /> During a tsunami in March 2011 the beach at Anahoomalu Bay was severely eroded,a 200-foot-wide breach was created through
<br /> the beach into the fishpond depositing sand in the pond, and much of the fishpond rock wall which acted as a backstop for the
<br /> c. beach was destroyed. Following completion of repairs,the beach has been relatively stable.To ensure the continued stability of
<br /> their beach, and address concerns about sea level rise, the Waikoloa Land Company and Waikoloa Beach Association have
<br /> contracted Sea Engineering to develop a long-term plan for management and maintenance of their valuable beach resource.Work
<br /> includes beach change monitoring, coastal assessment and preliminary concept plan, offshore sand survey, development of a
<br /> detailed beach maintenance/management plan, environmental assessment and permit application, and detailed design and
<br /> construction documents.
<br /> Cost: $12,560 Role:Project Manager
<br /> (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
<br /> Pohoiki Boat Ramp Repair Relocation Study Professional Services Construction
<br /> Puna District,Hawaii 2020
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE El Check if project performed with current firm
<br /> d. Sea Engineering was contracted by the Department of Land &Natural Resources —DBOR to provide coastal engineering and
<br /> environmental permitting services to determine the scope of work, environmental permitting requirements and cost estimates to
<br /> repair or replace the Pohoiki Boat Ramp facility located along the southeast coast of Hawaii Island.
<br /> Cost: $42,960 Role:Project Manager/Senior Coastal Engineer
<br /> (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
<br /> Anaehoomalu Bay Tsunami Damage Repair Professional Services Construction
<br /> Anaehoomalu,Waikoloa,South Kohala,Hawaii 2016
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE El Check if project performed with current firm
<br /> Sea Engineering was contracted to obtain permits and do emergency repair work to Waikoloa Beach and the historical fishpond
<br /> e. that was severely damaged by the 2011 tsunami. A sand-filled geotextile tube barrier was installed to close the gap in the beach.
<br /> The emergency repair work was accomplished as an intermediate step to protect the fishpond while a long-term, permanent
<br /> repair/restoration plan for the pond and beach can be developed. Permanent repairs include rebuilding the fishpond wall and
<br /> restoration of the beach to its pre-tsunami condition.
<br /> Cost:235,000 Role:Project Manager