Laserfiche WebLink
WAIAHOLE VALLEY <br /> WATER SYSTEM Project Summary: <br /> Hawaii Housing Finance & Development Corporation <br /> IMPROVEMENTS (HHFDC) sought options to improve and replace <br /> infrastructure associated with the Waiahole Valley Water <br /> Planning Solutions, Inc. System as recommended by Senate Concurrent <br /> Resolution No. 195. The proposal involved the <br /> Client: Bills Engineering/ installation of two new potable water wells. PSI managed <br /> HHFDC the planning and permitting component of the project, <br /> including public outreach. <br /> PSI Role: Subconsultant a <br /> Documents Prepared: zF' :r <br /> • Scoping ��• Draft EA (HEPA) .� ,s�' : <br /> ..... tol-4,,, - - <br /> • Final EA (HEPA) .. ,..i,-•4 <br /> Approvals Needed: 7 , � � ". � � <br /> • FONSI T -� —, <br /> Yom. <br /> Commence: 2022 1......6.0....eir, <br /> ""N ` ,~ <br /> ' as lir a"a'k � �r k <br /> Complete: 2023 ` <br /> Waiarm Stream. <br /> Team Members: Detail: <br /> • Bills Engineering (engineer, pSI worked closely with HHFDC and Bills Engineering <br /> prime) to plan and permit the WVWS improvements. The <br /> • Tom Nance Water Resource process involved many steps and consultation with <br /> Engineers community associations, the neighborhood board, <br /> • Cultural Surveys Hawaii agencies, and the public. Of note, PSI: <br /> • AECOS • Completed the HRS Chapter 343 HEPA EA process <br /> in less than a year. <br /> Budget: S93,000 Developed a detailed geologic and hydrogeologic <br /> assessment of the proposed well's impact on stream <br /> flows. <br /> • Addressed substantial conservation concerns <br /> associated with public-desired alternatives. <br /> • Prepared for and presented at the Kahalu`u <br /> Neighborhood Board and the public meeting for the <br /> DEA. <br /> n <br /> r n <br /> 711 Kapi'olani Boulevard,Suite 950 <br /> Honolulu, Hawaii 96813-5213 <br /> Phone:808-550-4483•www.psi-hi.com <br />