Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE <br /> Harlee Meyers Planner a.TOTAL b.WITH CURRENT FIRM <br /> 2 2 <br /> 15. FIRM NAME AND LOCATION(City and State) <br /> Wilson Okamoto Corporation, Honolulu, Hawaii <br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> MURP, Urban and Regional Planning, University of Hawaii at <br /> Manoa, 2021 <br /> B.S., Global Environmental Science, University of Hawaii at Manoa, <br /> 2018 <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Makalawena Integrated Resource Management Plan Environmental PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Assessment&Entitlements, Kona, Hawaii, HI Active -- <br /> a. <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Kamehameha Schools (KS)desires to formulate and implement an Integrated Resources Management Plan for property it owns at <br /> Makalawena makai of Queen Ka'ahumanu Highway. The 353 acre parcel contains unique and sensitive natural, cultural and <br /> historical resources. Harlee is assisting with the preparation of an Environmental Assessment. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Kahekili Highway Slope Repair PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Kahakuloa, Maui, HI <br /> b. Active -- <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> The County of Maui is proposing roadway repairs along 1,300 feet of Kahekili Highway Milepost 15. Improvements include repairs <br /> to slope and pavement edge failure. Harlee is assisting with the preparation of environmental assessment and permits. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Waipahu Refuse Facility &Convenience Center PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Waipahu, Oahu, HI Active -- <br /> C (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Harlee is preparing an Environmental Assessment to meet Chapter 343, HRS requirements. The City is proposing to convert the <br /> existing Waipahu Incinerator facility into a multi-use refuse division facility to accommodate larger public demand of the Leeward <br /> Oahu; office and maintenance shop; and training/education center. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Wahiawa Center for Workforce Excellence(CWE) PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Wahiawa, Oahu, HI Active -- <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> d• State DOE is proposing the CWE adjacent to the new Wahiawa Civic Center. The facility will be used by three (3)major agencies <br /> Hawaii State Public Library System, the DOE, and the University of Hawaii Community Colleges. Each agency will be located <br /> separately and on separate floors with their own access control. It is recommended that the Library will be located on the ground <br /> floor, the DOE facilities on the second floor, and the UH facilities on the third floor. The project will also include an adjoining multi- <br /> level parking structure for both public and staff parking with access control. Harlee is assisting with the preparation of an <br /> Environmental Assessment and Zoning Waiver. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Waimea Canyon Drive/Kokee Road Improvements, Phase 2 (MP 4.6 and <br /> 4.10) PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Waimea, HI Active 2A-Awarded <br /> e. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> HDOT proposes to upgrade/improve existing shoulders and guardrail systems along Waimea Canyon Road. State and federal <br /> funds will be used for the project, thereby triggering compliance with state environmental review laws and federal cross-cutting <br /> authorities. Harlee is assisting with preparing and processing permits including, but not limited to HRS Chapter 343 Environmental <br /> Assessment(Exemption), NHPA Section 106 consultation, and ESA, Section 7. <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV. 7/2021)PART I PAGE 11 <br />