Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE <br /> Glenn Kuwaye, P.E., LEED AP Vice President & Director of Civil a.TOTAL b.WITH CURRENT FIRM <br /> Engineering 24 19 <br /> 15. FIRM NAME AND LOCATION(City and State) <br /> Wilson Okamoto Corporation, Honolulu, Hawaii <br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> B.S., Civil Engineering, Santa Clara University, 2000 LEED Accredited Professional, 2009 <br /> PE-11817, Hawaii, Civil Engineering, 2005 <br /> PE-65310, California, Civil Engineer, 2003 <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> Member, Japanese Chamber of Commerce <br /> Certified Water Pollution Plan Preparer, City&County of Honolulu,12/31/2024 <br /> Certified Erosion and Sediment Control Plan Preparer, City&County of Honolulu, 12/31/2024 <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Waimano Ridge Sewer System Assessment <br /> Pearl City, Oahu, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> 2018 NA <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> a. Sr. Civil Engineer assisting with the preparation of an existing conditions report and Sewer Systems Study. Scope included <br /> researching available drawings and documents; CCTV inspection of existing sewer lines; and the preparation of a sewer master <br /> plan report. The Sewer System Report assessed existing conditions, identified constraints and maintenance issues, prepared <br /> hydraulic analysis to determine sewer improvements required to support the redevelopment outlined in DOH's 2016 Master Plan <br /> Update, described proposed sanitary sewer improvements, including maintenance and rehabilitation recommendations, and <br /> rough order of magnitude cost for proposed improvements. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Salt Lake/Moanalua Public Library—Parking Lot Improvements <br /> Moanalua, Oahu, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> 2020 2020 <br /> b. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Project Manager for the preparation of construction plans for demolition, site layout, and striping for the repaving of existing <br /> parking lot.The repaving consisted of a cold plane and overlay to match the existing AC pavement grades and thickness. ECC: <br /> $250K <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Waimano Ridge Site Water System Improvements,Assessment <br /> and Design PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Pearl City, HI 2016 2016 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> C. Project Manager and Senior Civil Engineer for the design of upgrades to an existing water system, owned by the Department of <br /> Health (DOH)and maintained under contract by the Board of Water Supply (BWS. Improvements to the system included the <br /> upgrade of 5,000 linear feet of transmission/distribution lines, upgrade of the existing well building and electrical system to meet <br /> BWS standards. The project also included the renovation of the existing booster pump station building, paving of 1,150 linear <br /> feet of access driveway to the water tank and the installation of 23 fire hydrants,water meters and back-flow preventers. ECC: <br /> $6 Million <br /> (1)TITLE AND LOCATION(City and State) <br /> (2)YEAR COMPLETED <br /> lao Valley State Monument Phase 2—Permanent Repairs <br /> lao, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> 5/2023 5/2023 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> d. The lao Valley State Monument Park sustained flood damage due to the September 2016 heavy rains on Maui. The heavy rains <br /> caused the Wailuku River running through the park to rise, triggering flood damage and landslides along the banks of the park. <br /> First phase involved design and construction of remedial measures to stabilize the stream bank to avert further undercutting. <br /> Phase 2 involves permanent repairs to address the long-term stability of the parking lot. This will include installation of a series <br /> of 30-foot reinforcing bars grouted into drilled holes to stabilize the slope and placement of shotcrete and sculptured to improve <br /> the appearance of slope face. <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV. 7/2021)PART I PAGE 13 <br />