|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY
<br /> (Complete one Section E for each key person.
<br /> 12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE
<br /> Todd Yonamine, P.E. Civil Project Manager a.TOTAL b.WITH CURRENT FIRM
<br /> 31 2
<br /> 15. FIRM NAME AND LOCATION(City and State)
<br /> Wilson Okamoto Corporation
<br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> Bachelor of Science—Civil Engineering (B.S.C.E.) PE-9212, Civil Engineering, Hawaii, 1997
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> Certified Water Pollution Plan Preparer, City&County of Honolulu,12/31/2024
<br /> Certified Erosion and Sediment Control Plan Preparer, City&County of Honolulu, 12/31/2024
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Hawaii State Hospital Water System Improvements
<br /> Kaneohe, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Active --
<br /> a. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE
<br /> ® Check if project performed with current firm
<br /> Project Manager overseeing the analysis of the existing water supply system and preparing construction plans for water system
<br /> improvements. Improvements include a storage tank, new waterlines and booster pumps.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Waikapu Town Center Water System Phase 1 10794-06
<br /> North Kona, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Active --
<br /> b. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑Check if project performed with current firm
<br /> Description: Design for installation of a private water system to meet DOH and County of Maui DPW requirements. Project
<br /> includes two existing wells outfitted with new pumps and motors; 1.2 MG storage reservoir,electrical equipment building, control
<br /> building with electrical, mechanical and SCADA equipment. Estimated construction cost: $12 M
<br /> Role: Project manager&design engineer
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Hala'ula Well Development Phase 2
<br /> North Kona, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> 2019 2023
<br /> C. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑Check if project performed with current firm
<br /> Description: Design for the installation of 700 gpm pump and 200 hp motor, connecting pipeline, 0.5 MG reservoir, control
<br /> building, access roadway,site work and appurtenances. Construction cost: $12.8M approx.
<br /> Role: Project manager&design engineer
<br /> (1)TITLE AND LOCATION(City and State)
<br /> Ka`upulehu Well No.8 Pump&Connecting Pipeline (2)YEAR COMPLETED
<br /> North Kona, Hawaii PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> 2016 2017
<br /> d. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑ Check if project performed with current firm
<br /> Description: Design for the installation of 450 gpm pump and 250 hp motor, connecting pipeline, control building, access roadway,
<br /> site work and appurtenances. Construction cost: $2.1M approx.
<br /> Role: Project manager&design engineer
<br /> (1)TITLE AND LOCATION(City and State)
<br /> Kaupulehu Well No.8 Pump&Connecting Pipeline (2)YEAR COMPLETED
<br /> North Kona, Hawaii PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> 2016 2017
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑ Check if project performed with current firm
<br /> e. Description: Design for the installation of 450 gpm pump and 250 hp motor, connecting pipeline, control building, access roadway,
<br /> site work and appurtenances. Construction cost: $2.1M approx.
<br /> Role: Project manager&design engineer
<br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV. 7/2021)PART I PAGE 18
<br />
|