My WebLink
|
Help
|
About
|
Sign Out
Home
2024-06-27 PL-INT-2024-008072 HHF Planners Category PL.4
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 24-25
>
PL - PLANNING
>
PL.04 - Community, Regional Plans, General Plan, Climate Adaption
>
2024-06-27 PL-INT-2024-008072 HHF Planners Category PL.4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2024 11:37:42 AM
Creation date
7/10/2024 2:53:57 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/27/2024
Permit Number
PL-INT-2024-008072
Description
HHF Planners, Professional services for category PL.4, PL.5, PL.6
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HHF PLANNERS <br /> PLANNING DEPARTMENT,COUNTY OF HAWAII 400places for people <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Honolulu Multi-Hazard Pre-Disaster Mitigation Plan Update PROFESSIONAL SERVICES CONSTRUCTION <br /> Islandwide,0`ahu 2019 n/a <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br /> e. Project manager for public engagement assistance and plan integration analysis to measure the extent to which natural hazards are <br /> considered in general and community land use policies and recommend additions to help establish hazard resilience as a key factor <br /> in future development and community planning.Focus areas included development regulations,land acquisition/transfer,financial <br /> incentives,land use analysis and permitting,public facilities,post-disaster reconstruction,and capital improvements. <br /> Project Cost:$42K <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Hawaii County Hazard Mitigation Update PROFESSIONAL SERVICES CONSTRUCTION <br /> Hawai`i Island 2015 n/a <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br /> f. Project manager for a comprehensive plan to establish hazard resilience as an overarching value of the community and provide the <br /> opportunity to continuously manage development in a way that does not lead to increased hazard vulnerability.A review of all <br /> sections of the previous County General Plan was done and recommendations for revisions were made to more accurately capture <br /> the County's position on addressing potential hazards with regard to the local regulation of land use.Key sections included <br /> Economy,Energy,Natural Hazards,Housing,Public Facilities,Public Utilities,Transportation,and Land Use.Project Cost:$180K <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Installation Climate Resilience Plan ICRP) PROFESSIONAL SERVICES CONSTRUCTION <br /> Marine Corps Base Camp Blaz,Guam Ongoing n/a <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br /> Principal-in-Charge of an expansive study to analyze potential climate-related and other natural hazard risks to Marine Corps assets <br /> and equipment at five installation areas that comprise Camp Blaz on Guam.The ICRP team is collaborating with related department <br /> g• <br /> contacts within the Department of Defense and the Government of Guam to identify action alternatives to mitigate or reduce <br /> associated risks.Mr.Sjoblom is leading extensive stakeholder engagement,documenting lessons learned from MCB Camp Blaz and <br /> other locations,identifying future risks and threats,and preparing cost-benefit analyses to determine priority project <br /> recommendations.The ICRP is being prepared in compliance with 10 U.S.C.§2864,per DoD Directive 4715.21 and Public Law No: <br /> 116-92,using the Climate Change Installation Adaptation and Resilience Handbook and NAVFAC Resiliency Guide). <br /> Project Cost:$547K <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Kaneohe Yacht Club Due Diligence and Master Plan PROFESSIONAL SERVICES CONSTRUCTION <br /> Kaneohe,0`ahu Ongoing n/a <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Check if project performed with current firm <br /> h. Principal-in-Charge of due diligence and master planning analyses to assist the Board of Directors and general membership to <br /> establish a shared vision for goals and objectives of future capital improvements that advance the core mission and functions of the <br /> yacht club.Due diligence efforts include compiling existing land use planning and development conditions and documenting <br /> potential permits,approvals,and consultations needed for project development.Plan completion will bolster the yacht club's ability <br /> to uphold their Corporate Charter,maximize core functions,and ensure that it can continue to prosper at its current site. <br /> Project Cost:$221K <br /> AUTHORIZED FOR LOCAL REPRODUCTION 4 STANDARD FORM 330 (7/2021) <br />
The URL can be used to link to this page
Your browser does not support the video tag.