My WebLink
|
Help
|
About
|
Sign Out
Home
2024-06-28 PL-INT-2024-008092 AECOM Technical Services, Inc. Category PL.4
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 24-25
>
PL - PLANNING
>
PL.04 - Community, Regional Plans, General Plan, Climate Adaption
>
2024-06-28 PL-INT-2024-008092 AECOM Technical Services, Inc. Category PL.4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2024 12:17:21 PM
Creation date
7/10/2024 3:03:11 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/28/2024
Permit Number
PL-INT-2024-008092
Description
AECOM Technical Services, Inc., Professional services for category PL.3, PL.4, PL.5, PL.6, PL.9
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AECOM I County of Hawaii,Planning Department,Fiscal Year 2024-2025 <br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> Christopher(Chris)Stoll 19.RELEVANT PROJECTS(continued) <br /> d. (1)TITLE AND LOCATION(City and State) See Project#7 in Section F (2)YEAR COMPLETED <br /> Kamehameha Highway, Rockfall Protection at Waimea Bay,Phase 2 PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> (Sunset Beach Side), RTE 83,MP 5.66-5.96(Honolulu, HI) Ongoing N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE El Check if project performed with current firm <br /> GIS support.This project involves replacing the existing 1,000-foot long rockfall impact fence(approximately 12-13 feet tall)along the <br /> Kamehameha Highway mauka shoulder with a new stronger rockfall impact fence(approximately 15 feet tall). Required permits and approvals <br /> include a federal-level National Historic Preservation Act Section 106 consultation, Endangered Species Act Section 7 consultation, National <br /> Environmental Policy Act Categorical Exclusion,and Magnuson-Stevens Act Essential Fish Habitat consultation. State-level permits and approvals <br /> include Hawaii Revised Statues(HRS)Chapter 6E-8 related to conserving and developing the historical and cultural properties within the state, <br /> HRS Chapter 195D related to conservation of forestry,wildlife,and aquatic resources,and coordination with the Office of Conservation and <br /> Coastal Lands. <br /> e. (1)TITLE AND LOCATION(City and State) See Project#8 in Section F (2)YEAR COMPLETED <br /> Pearl Harbor Naval Shipyard Dry Dock&Waterfront Production Facility EIS PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> (Joint Base Pearl Harbor-Hickam, HI) 2023-Ongoing N/A <br /> U L.I(ir I I.)IN cost,etc.)AND SPECIFIC ROLE El Check if project performed with current firm <br /> Planning and GIS Support.The United States Department of Navy(Navy)proposes to construct and operate a graving dry dock and waterfront <br /> production facility at Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility(PHNSY&IMF), including auxiliary facilities and utilities. <br /> The proposed dry dock would replace the existing Dry Dock(DD)3. PHNSY&IMF is located at Joint Base Pearl Harbor-Hickam(JBPHH), Oahu, <br /> Hawaii. Mr. Stoll served as the GIS Manager and planner at the start of the project,working with various technical experts and the Navy to develop <br /> alternatives and developed figures and coordinated GIS and other data exchanges over the project. He also coordin ated between several other <br /> area projects(STOP, INRMP)taking place concurrently. <br /> f. (1)TITLE AND LOCATION(City and State) See Project#9 in Section F (2)YEAR COMPLETED <br /> Shipyard Infrastructure Optimization Program(STOP)Advanced Planning Studies PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> and Area Development Plans(Pearl Harbor Naval Shipyard, Puget Sound Naval 2023 N/A <br /> Shipyard, Norfolk Naval Shipyard,and Portsmouth Naval Shipyard) <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE El Check if project performed with current firm <br /> Senior Planner/GIS Manager. United States(U.S.) Naval Sea Systems Command(NAVSEA)has established PMS 555 to implement, manage <br /> and execute a Shipyard Infrastructure Optimization Program(STOP)focusing on the modernization and optimization of our nation's public naval <br /> shipyards.Supported the Shipyard Infrastructure Optimization Program(STOP)from Part 1,data gathering,through Part 4,Area Development <br /> Plan(ADP)at Pearl Harbor Naval Shipyard(PHNSY)Oahu, Hawaii. <br /> g. (1)TITLE AND LOCATION(City and State) See Project#10 in Section F (2)YEAR COMPLETED <br /> Sea Level Rise Impact Assessment and Mitigation Report, Naval Support Facility PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> (NSF),Diego Garcia[N6274218D1802, N4008421F4429] 2021 -Present N/A <br /> (British Indian Ocean Territory) <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm <br /> GIS Support and Field Team Planning Support.The project scope includes providing a comprehensive assessment of sea level rise(SLR) <br /> impacts on Diego Garcia operations over the next 50 years. Recommendations to mitigate SLR impacts will be included. <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021)PART I -PAGE 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.