My WebLink
|
Help
|
About
|
Sign Out
Home
2024-06-28 PL-INT-2024-008100 Carollo Engineers, Inc. Category PL.4
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 24-25
>
PL - PLANNING
>
PL.04 - Community, Regional Plans, General Plan, Climate Adaption
>
2024-06-28 PL-INT-2024-008100 Carollo Engineers, Inc. Category PL.4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2024 12:45:15 PM
Creation date
6/28/2024 4:15:12 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/28/2024
Permit Number
PL-INT-2024-008100
Description
Carollo Engineers, Inc., Professional services for category PL.4
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIRM OVERVIEW AND BACKGROUND <br /> r <br /> :11 - • Wildfire Damage Assessment, Rehabilitation, <br /> , <br /> �. and Rebuilding of the Lahaina Water System <br /> k4 <br /> .h, COUNTY OF MAUI,DEPARTMENT OF WATER SUPPLY,MAUI,HAWAII <br /> • p Client Reference: <br /> 1'.• i <br /> Mr.James"Kimo"Landgraf,Deputy Director <br /> {} '' County of Maui,Department of Water Supply <br /> '.., y•11 ^,R• 4 .i <br /> ' ,•-^� .;;{ 808.270.7514 /james.landgraf@co.maui.hi.us <br /> Following the devastating wildfires in 2023,the Maui County <br /> Department of Water Supply(DWS)hired Carollo to lead the water Project Highlights <br /> system damage assessments and coordinate with a wide range <br /> • <br /> of parties for the recovery and rebuilding efforts.The damage Restoration of safety,services,and stability to <br /> assessment and recovery efforts required a quick mobilization affected communities. <br /> of staff with a range of expertise,including pipeline condition • Ongoing coordination between various <br /> assessment,disaster recovery and reimbursement,water stakeholders and entities regarding the <br /> chemistry,hydraulics,and cost estimating. Lahaina Wildfire. <br /> Summary of Scope • Damage assessments and development of repair <br /> and replacement cost estimates to support DWS <br /> Carollo supported DWS crews to determine the scope of the water with FEMA reimbursement requests. <br /> system damages,and coordinated with a range of parties for the <br /> safe restart of the water system in a phased approach.Support <br /> efforts include deployment of subject matter experts and engineers Carollo rapidly mobilized a range <br /> to support emergency response efforts,water system testing and <br /> restart,and coordinating with federal,state and local response of technical experts to support o <br /> O <br /> efforts.Carollo also provided a damage inventory,estimated the damage assessment and <br /> replacement costs,and is coordinating with DWS on rehabilitation rebuilding efforts. Z <br /> and rebuilding efforts. <br /> O <br /> Z <br /> Z <br /> n = <br /> O <br /> m <br /> � r <br /> c D <br /> zz <br /> ClearanceG) <br /> m m <br /> • Yrx..,..tea; V7 m <br /> m <br /> D <br /> z 7:1 <br /> D � <br /> -+ Isolation <br /> m <br /> ` a i 1`ha D Z <br /> j t 4 s 1.. z <br /> y, m <br /> Excavati0n Cot&Cap Road Repair ti `' Cu�wn m <br /> ti D O <br /> EPA EPA cuts and mr D <br /> exc,;vates to caps the <br /> Ztn <br /> revr--.)I where connection EPA repairs o m <br /> the lateral between the road <br /> and main lateral and m <br /> connect mainI w <br /> https.//www.mauirecovers.org/maps/epa-maul-wildfire-mission-storymap o N <br /> D ? <br /> N <br /> r <br /> —I I <br /> O <br /> Z <br /> CAROLLO / QUALIFICATIONS /JUNE 2024 18 <br /> \\io-bd-1\BD-DATA\Marketing\Pursuits\CIient831HONl\HawaiiCounty\EnvMgmtDept\On-Call FY24-25\Qua10624\PL.4-CommunityPlanning_Community\Indd\01_FirmOverview_PL4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.