Laserfiche WebLink
FIRM OVERVIEW AND BACKGROUND <br /> WASTEWATER CONVEYANCE _ I Carollo developed <br /> Carollo's wastewater conveyance facility projects have included Oakland's first sewer <br /> important considerations such as potential for peak flow storage, �� - model from as built <br /> drawings and calibrated <br /> alternative alignments,utility research,environmental permitting, " _ from 140 flow metering <br /> public outreach,encroachment permits,roadway/paving , -` sites in Innovyze's <br /> ,tea. -,,. <br /> replacement,pipe selection,challenging crossings,and coordinating '` "'� '^' InfoSWMM software. <br /> with various impacted parties.These projects have incorporated . / , 4 — City staff are using the <br /> traditional cut-and-cover and jack-and-bore construction methods, "`; model to gain a better <br /> 41 <br /> as well as microtunneling,horizontal directional drilling(HDD), 6.' <br /> understanding of their <br /> tunnel boring machines,pipe bursting,fold-and-form pipe,cured- F v complex system. <br /> in-place pipe,and sliplining techniques.Project evaluations have <br /> involved geotechnical and risk analyses,flow modeling,odor control, <br /> corrosion protection,and other considerations. <br /> • <br /> Carollo has a long history of developing <br /> dynamic hydraulic models using a '�w. WI - Ali` . k <br /> variety of software packages, including <br /> SWMM, MOUSE, InfoWorks, Hydra, a� � `' <br /> H2Omap-Sewer, and Sewer CAD. 1` <br /> I rr <br /> We have worked extensively with cities and counties similar to yours, '- <br /> and local neighborhood groups to implement infrastructure projects "- . _, A kthat meet public expectations.We match infrastructure replacement ` ,- <br /> ,, <br /> and rehabilitation/repair technologies to each specific project for ti - <br /> successful results.We find the combination that works best for your <br /> project and not just a one size fits all approach. <br /> o0 <br /> K <br /> Representative Wastewater Pipeline Experience co <br /> Diameter Length Construction <br /> Agency/Project (inches) (feet) Method Z 0 <br /> Santa Cruz County Sanitation District,CA/Noble Gulch Sewer Improvement 8,10,15 13,100 OC,SL,MT,HDD c) D <br /> City of Modesto,CA/River Trunk 18-60 32,715 OC,CIPP,MT K <br /> KD <br /> c <br /> City of Fresno,CA/Illinois Ave/Fruit Ave Sewer Rehabilitation 12,15,48 6,200 CIPP < z <br /> jG) <br /> m 0 <br /> Delta Diablo Sanitation District,CA/Pittsburg Recycled Water Distribution System 20,30 5,100 CIPP,SL o m <br /> ig <br /> z7:1 <br /> West Valley Sanitation District,CA/Los Gatos Sewer Collection System Analysis and 8-24 40,000 PB,OC,L D ki <br /> Improvements D <br /> z— <br /> West County Wastewater,CA/Tara Hills Force Main 12,18 9,400 CIPP,OC m o <br /> zmm <br /> Pacific Gas and Electric,CA/Line 153-R149 30 350 MT D o <br /> Sacramento Regional County Sanitation District,CA/Upper Northwest Interceptor 30-90 110,900 OC,MT D- D <br /> z cn <br /> - m <br /> Central Contra Costa Sanitary District,CA/San Ramon Interceptor 24-42 19,500 T,BJ P <br /> City of Phoenix,AZ/Reclaimed Water Pipeline 16-34 35,000 OC m T <br /> D < <br /> City of Shady Cove,OR/Force Main 8 15,000 HDD D A <br /> -0 IQ <br /> Construction Methods:OC=open-cut,SL=sliplining,MT=microtunneling,HDD=horizontal directional drilling,CIPP=cured-in-place pipe, D <br /> Li <br /> L=lining,PB=pipe bursting,BJ=bore/jack,T=tunneling o A <br /> CAROLLO / QUALIFICATIONS /JUNE 2024 27 <br /> \\io-bd-1\BD-DATA\Marketing\Pursuits\CIient83(HON)\HawaiiCounty\EnvMgmtDept\On-Call FY24-25\Qua10624\PL.4-CommunityPlanning_Community\Indd\O1_FirmOverview_PL4 <br />