|
COUNTY OF HAWAII I PL.4)COMMUNITY PLANNING(COMMUNITY/REGIONAL PLANS,GENERAL PLAN,CLIMATE ADAPTATION)
<br /> E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section Efor each key person.)
<br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE
<br /> Sandy Hamura, PE,LEED AP Project Manager/Civil Engineer a.TOTAL b.WITH CURRENT FIRM
<br /> 27 2
<br /> 15.FIRM NAME AND LOCATION(City and State)
<br /> Jacobs,Honolulu,Hawaii
<br /> 16.EDUCATION(DEGREE AND SPECIALIZATION)
<br /> BS,Civil Engineering Professional Engineer: Hawaii#PE-11100, Exp.4/30/2026
<br /> LEED Legacy AP
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> Sandy has experience in strategic program and project management. Her management responsibilities include assessing,
<br /> developing,prioritizing, budgeting,scheduling, managing,and executing a capital improvement program for large and small
<br /> deferred maintenance and future development projects. Executes timely and efficient completion of planned projects in accordance
<br /> with established guidelines,specifications,and financial constraints.Manages the complete project lifecycle:from inception where
<br /> the project objectives are determined,to planning the project and defining the scope of work,determining the budget and schedule,
<br /> evaluating risks associated with the project,hiring the project team,reviewing project investigations and assessments,overseeing the
<br /> design,and permitting process,involvement with contractor selection,coordinating with construction management firms and finally,
<br /> aid with project completion.
<br /> 19.RELEVANT PROJECTS
<br /> Kamehameha Highway Wastewater Pump Station Upgrade Project, PROFESSIONAL SERVICES CONSTRUCTION(if applicable)
<br /> City and County of Honolulu,Honolulu, HI Ongoing
<br /> Project Manager. Responsible for bid services and office services during construction for facility improvements to rehabilitate
<br /> a. the concrete walls and concrete roof slab of the existing influent wet wells, provide new sump pumps and discharge piping,
<br /> replace the fuel storage tank,replacement of asphalt pavement driveway and modifications to stormwater collection system of
<br /> the pump station. For this project,Jacobs developed preliminary engineering report and completed detailed design and
<br /> construction documents.Services during bidding and construction is ongoing and includes submittal reviews,site
<br /> investigations,and responses to requests for information(RFIs).
<br /> (1)TITLE AND LOCATION(City and Sta
<br /> Waianae Wastewater Treatment Plant(WWTP)Improvements and Upgrades Phase 2,
<br /> City and County of Honolulu,Waianae,HI Ongoing
<br /> (z) -rr^r d,co-`r-`rRO'r
<br /> Project Manager. Responsible for Phase 2 preliminary engineering services for technical memorandums on wastewater
<br /> b. treatment including replacement of the trickling filter pumps,new effluent monitoring and sampling station,and condition
<br /> assessment of the influent sewer manhole. Future services include detailed design and construction documents,preparation of
<br /> permits and services during bidding. Phase 2 project includes demolition of the existing chlorine contact tank,new effluent
<br /> flow measurement and sampling facility, new oil storage facility, improvements to the influent pump station building and
<br /> influent manhole,restroom renovations in the Administration/Laboratory and Control buildings.
<br /> (2)YEAR COMPLETED
<br /> Kamehameha Highway Wastewater Pump Station Force Main System Bridge Demolition, PROFESSION AL SERVICES CONSTRUCTION(if applicable)
<br /> City and County of Honolulu,Honolulu, HI Ongoing
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE
<br /> c. Project Manager.Leading the project team to develop bridge demolition alternatives report and review of potential required
<br /> permits for the demolition of two utility bridges crossing Moanalua and Kalihi Streams and treatment of the abandoned 36"
<br /> force main. Future services to include detailed design and construction documents,preparation of permits and drawings for
<br /> bidding.
<br /> Jacobs STANDARD FORM 330(REV.7/2021)18
<br /> TRACKING#:0060.j00000DVZEvIAP
<br />
|