Laserfiche WebLink
COUNTY OF HAWAII I PL.4)COMMUNITY PLANNING(COMMUNITY/REGIONAL PLANS,GENERAL PLAN,CLIMATE ADAPTATION) <br /> Project Manager.Matt oversaw the Water and Wastewater utility capacity studies,coordinated efforts across Water, <br /> Wastewater,and Electrical studies,and managed schedule,scope,and budget.This DPRI Phase 2 study analyzes existing <br /> electrical,water,and wastewater capacity at a preliminary planning level of detail.The Department of Defense is relocating <br /> Marine Corps forces and families from Okinawa to the island of Oahu.These Phase 2 studies analyze proposed relocation sites <br /> and present a comprehensive report of existing conditions and potential constraints. <br /> Marine Corps Base Hawaii(MCBH)Home Basing Environmental Assessment(EA), <br /> Naval Facilities Engineering Command,Pacific;Oahu,HI 2022 <br /> Project Manager.Matt oversaw Air Quality and Cultural Resources analyses for the NEPA EA,coordinated with MCBH cultural <br /> e. resources SMEs,and managed schedule,scope,and budget.The proposed action includes the home-basing of new aircraft at <br /> MCBH and construction of supporting infrastructure. Potential effects on cultural resources are a key project issue as the <br /> project would affect the National Historic Landmark at MCBH.Matt supported MCBH cultural resource SMEs with an <br /> accelerated NHPA Section 106 consultation schedule,allowing for robust public involvement and consensus building while <br /> maintaining an aggressive NEPA permitting schedule. <br /> Joint Base Pearl Harbor-Hickam,STOP Part 3 Advanced Planning Study,CS17 <br /> Environmental/Safety Requirements, Naval Facilities Engineering Command, Pacific, 2021 <br /> Oahu, HI <br /> f Deputy Study Lead.Matt coordinated data acquisition and analysis with project team Subject Matter Experts and Navy <br /> Remedial Project Managers,performed QA/QC of data analysis and all GIS deliverables.The program is currently conducting <br /> advanced planning necessary to identify specific investments needed at each shipyard.The information gathered for Core <br /> Study(CS) 17 will be used to indicate environmental and explosives safety constraints that may influence overall development <br /> of Pearl Harbor Naval Shipyard.The project team created a Navy-compatible geodatabase with field-verified remediation <br /> status data for smooth integration of CERCLA planning with overall Navy installation planning. <br /> Jacobs STANDARD FORM 330(REV.7/2021)111 <br /> TRACKING#:006Oj00000DVZEvIAP <br />