|
E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br /> Christopher Goody,P.E. Senior Ocean Engineer a. TOTAL b. WITH FIRM
<br /> 27 16
<br /> 15. FIRM NAME and LOCATION(City and State)
<br /> Sea Engineering,Inc.
<br /> 16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION(State and Discipline)
<br /> MS,Ocean Engineering,University of Hawaii at Manoa Hawaii Professional Engineer(Civil)
<br /> BS,Ocean Engineering,Florida Institute of Technology
<br /> 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications, Organizations, Training,Awards,etc.)
<br /> American Society of Civil Engineers,Marine Technology Society
<br /> SCUBA certified
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
<br /> Kamehameha Hwy Shoreline Erosion Mitigation Professional Services Construction
<br /> Kaaawa,Oahu 2020 to present n/a
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE IE Check if project performed with current firm
<br /> a. Sea Engineering, Inc. has been contracted by AECOM for HDOT Highways Division to assist with implementation of
<br /> temporary erosion protection for Kamehameha Highway at Kaaawa,Oahu.Work tasks include preparation of a basis of design
<br /> report,an environmental assessment,construction drawings for selected plan,the Department of the Army permit application,
<br /> as well as community outreach.
<br /> Cost: $30,695 Role: Senior Ocean Engineer
<br /> (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
<br /> Hilo Harbor Breakwater Improvements—Basis of Design
<br /> Hilo,Hawaii 2023 n/a
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
<br /> Recent inspections of the Hilo breakwater have found areas of possible damage. As a result of the inspections,repairs have
<br /> b. been recommended.In support of the need for repairs,Sea Engineering,Inc.(SE)had been contracted by Cardno GS and the
<br /> U.S. Corps of Engineers (USCOE)to conduct high resolution numerical modeling of wave conditions on the breakwater at
<br /> selected future sea levels to determine stability and vulnerability of the breakwater. SE then developed several repair designs
<br /> to address the existing and future vulnerabilities.
<br /> Cost: $381,189 Role: Senior Ocean Engineer
<br /> (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
<br /> Laupahoehoe Harbor Repair Design Professional Services Construction
<br /> Laupahoehoe,Hawaii 2023 n/a
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
<br /> In 2019, USACE retained the services of Nagamine Okawa Engineers, Inc. and Sea Engineering, Inc. (SE) to evaluate the
<br /> C. condition of the existing breakwater, develop and compare alternative repair plans, and develop conceptual repair plans and
<br /> rough order of magnitude construction costs under the U.S. Army Corps of Engineers(USACE) Operations& Maintenance
<br /> (O&M)program. In 2020,USACE retained the services of Cardno GS, Inc.,and SE to develop the repair plan through final
<br /> design.
<br /> Cost:$141,640 Role: Senior Ocean Engineer
<br /> (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
<br /> Hilo Wastewater Treatment Plant Outfall Inspection Professional Services Construction
<br /> Hilo,Hawaii 2023 n/a
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
<br /> Sea Engineering,Inc(SE),has been contracted by the County of Hawaii Wastewater Division to inspect the Hilo Wastewater
<br /> d. Treatment Plant(WWTP)Ocean Outfall as part of the requirement in the facility's National Pollutant Discharge Elimination
<br /> System permit (NPDES Permit No. HI 00213 77). Work tasks include a visual and dye inspection, and a color video
<br /> documenting the inspection,a written report summarizing the results of the inspection noting all identified defects and their
<br /> location.
<br /> Cost: $25,995 Role: Senior Ocean Engineer
<br /> (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
<br /> Laniakea Highway Relocation Coastal Assessment Professional Services Construction
<br /> Haleiwa,Oahu 2022 n/a
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
<br /> The Hawaii Department of Transportation was interested in moving Kamehameha Highway inland at Laniakea on the North
<br /> e. Shore of Oahu to alleviate hazardous traffic and pedestrian crossing. In support of planning and preparation of an
<br /> environmental assessment (EA) for the proposed project, Sea Engineering, Inc (SE) was contracted by WSP for HDOT
<br /> Highways division to complete a tsunami and wave runup and inundation analyses, and a coastal assessment of the project
<br /> site.
<br /> Cost: $60,460 Role: Senior Ocean Engineer
<br />
|