|
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE
<br /> Brant Tanaka Principal a.TOTAL b.WITH CURRENT FIRM
<br /> 33 21
<br /> 15.FIRM NAME AND LOCATION(City and State)
<br /> EnviroServices&Training Center,LLC(ETC),Honolulu,Hawaii
<br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline)
<br /> BA,1988,University of Washington,Geology and Earth Sciences • Registered Safety Officer(RSO),IBOEHS
<br /> PD,1991,University of Hawaii at Manoa,Secondary Science • Certified Indoor Environmentalist,CIE
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> • American Industrial Hygiene Association,Hawaii Section Director(former) • Indoor Air Quality Association,Member
<br /> • State of Hawaii Environmental Council,Council Member(former) • 40 Hour Initial/Current HAZWOPER(29 CFR 1910.120)Certificate
<br /> • Am.Conference of Governmental Industrial Hygienist,Member • 8 Hour Supervisor/Mgr.HAZWOPER(29 CFR 1910.120)Certificate
<br /> 19.RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Environmental Consulting Services,Maui District MS4 Program PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> (Island of Maui,Hawaii) 2028
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> ETC was contracted to provide environmental compliance support to the State of Hawaii Department of Transportation(DOT),Highways Division,Maui District
<br /> a, (HWY-M)to meet stormwater compliance requirements associated with their municipal separate storm sewer system(MS4).Specifically,HWY-M was issued
<br /> an NPDES MS4 permit that required them to develop and implement control measures to prevent polluted runoff from entering and discharging from their M54.
<br /> Specifically,ETC helped to establish and implement:construction design procedures to ensure appropriate sediment and erosion control measures on HWY-M
<br /> construction projects;construction inspection and enforcement procedures to manage compliance with sediment and erosion control requirements;inspection
<br /> and maintenance of MS4 structures and roadways;procedures to respond to and enforce against illicit discharges and illegal connections;GIS mapping of MS4
<br /> structures and roadways;public education and outreach programs to provide awareness and training to targeted audiences that included contractors,DOT
<br /> personnel,maintenance staff,industrial and commercial businesses,schools,and other stakeholders;and an Asset Management System to track and monitor
<br /> compliance of the various control measures.Program Manager.$25,000,000.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Environmental Engineering Management at Daniel K.Inouye International PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Airport and Kahului Airport(Honolulu and Kahului,Hawaii) 2022
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> b. ETC was contracted to provide a broad range of continuous support services that included environmental engineering management,design,inspections,and
<br /> compliance services with an emphasis on municipal separate storm sewer system(MS4)requirements at various airports Statewide.Specifically,provided
<br /> technical expertise to meet and implement National Pollutant Discharge Elimination System(NPDES)control measure requirements that included public
<br /> education and outreach,illicit discharge detection and elimination,construction site runoff control,post-construction stormwater management,pollution
<br /> prevention,industrial and commercial discharge management,and monitoring.Services also included support on an array of other environmental compliance
<br /> matters,such as underground injection wells,underground storage tanks,spill prevention control and countermeasure,hazardous materials removal and
<br /> disposal,site screening and soil sampling,groundwater well monitoring,Environmental Hazard Evaluation(EHE)/Environmental Hazard Management Plan
<br /> (EHMP),environmental mapping/GIS,and asset management system integration.Program Manager. $9,000,000.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> State of Hawaii Department of Transportation's Storm Water Management PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Program Plan(Statewide,Hawaii) 2016
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Provided State of Hawaii Department of Transportation(DOT)compliance support for the stormwater management requirements mandated in the agreement
<br /> c between the DOT and the Environmental Protection Agency(EPA)and Hawaii Department of Health(Consent Decree),and the DOT Highways Division
<br /> Oahu District's NPDES M54 permit.Ensured that all stormwater management requirements were met.These requirements included:implementing pollution
<br /> prevention best management practices(BMP5),designing erosion control slope repair projects,ensuring construction site sediment and erosion control,
<br /> designing post-construction and low impact development(LID)stormwater management structures,inspecting illicit connections and illegal discharges,auditing
<br /> discharge associated with industrial and commercial activities,providing maintenance facilities with environmental compliance support,conducting stormwater
<br /> sampling/monitoring,developing and implementing strategies to reduce and meet waste load allocations,coordinating public outreach efforts,developing and
<br /> utilizing an Asset Management System to collect/store/evaluate the data associated with this project,conducting training,and preparing and submitting reports.
<br /> Program Manager.$39,500,000.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Statewide Compliance-Focused Environmental Management System(EMS), PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Department of Transportation(Statewide,Hawaii) 2010
<br /> d. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Oversaw ETC's contract to assist the State of Hawaii with implementing the agreement between the Hawaii DOT and the EPA and Hawaii Department of
<br /> Health(Consent Decree).To meet the Consent Decree requirements,ETC completed a Gap Assessment of the State's overall environmental compliance;prepared
<br /> Environmental Compliance Checklists for use by the DOT at each of its Transportation Baseyard facilities;developed an EMS Manual for the Harbors Division,
<br /> Highways Division,and Airports Division;and provided training to all Baseyard employees and management staff.Project Manager.$900,000.
<br /> STANDARD FORM 330(REV.7/2021)
<br />
|