|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY
<br /> (Complete one Section E for each key person.)
<br /> 12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE
<br /> Keola M. Cheng Director of Planning Group & Project a.TOTAL b.WITH CURRENT FIRM
<br /> Manager 13 13
<br /> 15. FIRM NAME AND LOCATION(City and State)
<br /> Wilson Okamoto Corporation, Honolulu, Hawaii
<br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> B.B.A., Business Administration, Finance, University of Hawaii at
<br /> Manoa, 2009
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Kona Village Resort- Entitlement PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Kona, Hawaii, HI 6/2023 6/2023
<br /> a. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> WOC is assisting Kamehameha Schools with overseeing the redevelopment of the Kona Village Resort, which encompasses 90
<br /> acres of oceanfront property. Mr. Cheng assisted with overseeing the entitlement process for the project's first phase. The
<br /> entitlements in this phase are based on development replacing most of the previous uses that were approved through the Special
<br /> Management Area Permit process.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Hilo WWTP Headworks, Primary Clarifies and Septage Station PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Upgrades, Hilo, Hawaii, HI Active --
<br /> b. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> The COH is proposing to implement improvement at the Hilo WWTP. Keola is the Planning Project Manager conducting research,
<br /> including verifying existing conditions, reviewing available documents, and consulting with agencies, to determine required permits
<br /> and approvals.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Wahiawa Center for Workforce Excellence(CWE) PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Wahiawa, Oahu, HI Active --
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> c. State DOE is proposing the CWE adjacent to the new Wahiawa Civic Center. The facility will be used by three (3) major agencies
<br /> Hawaii State Public Library System, the DOE, and the University of Hawaii Community Colleges. Each agency will be located
<br /> separately and on separate floors with their own access control. It is recommended that the Library will be located on the ground
<br /> floor, the DOE facilities on the second floor, and the UH facilities on the third floor. The project will also include an adjoining multi-
<br /> level parking structure for both public and staff parking with access control. Keola is the Project Manager for the preparation of an
<br /> Environmental Assessment and Zoning Waiver.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Pahala Large Capacity Cesspool Replacement PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Kau, HI
<br /> 2020
<br /> d. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Sr. Planner for the preparation and processing of an Environmental Assessment for a new wastewater collection system and
<br /> treatment plant to serve the community of Pahala in the rural Kau District. The EA also met National Environmental Policy Act
<br /> requirements. Mr. Sakaguchi also prepared Special Use Permit.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Kona International Airport Master Plan Environmental Assessment,
<br /> Kona, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> 2015 --
<br /> (3)BRIEF DESCRIPTION(Briefscope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> e. Planner for the preparation and processing of state and federal environmental assessments (EA)for proposed improvements at
<br /> the Kona International Airport. In conjunction with the federal EA, consultation was coordinated for Section 7 of the ESAt and
<br /> Section 106 of the NHPA Public meetings were held to present the proposed improvements and to solicit input, including for the
<br /> aforementioned Section 106 process.
<br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021)PART I PAGE 9
<br />
|