Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE <br /> Keola M. Cheng Director of Planning Group & Project a.TOTAL b.WITH CURRENT FIRM <br /> Manager 13 13 <br /> 15. FIRM NAME AND LOCATION(City and State) <br /> Wilson Okamoto Corporation, Honolulu, Hawaii <br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> B.B.A., Business Administration, Finance, University of Hawaii at <br /> Manoa, 2009 <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Kona Village Resort- Entitlement PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Kona, Hawaii, HI 6/2023 6/2023 <br /> a. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> WOC is assisting Kamehameha Schools with overseeing the redevelopment of the Kona Village Resort, which encompasses 90 <br /> acres of oceanfront property. Mr. Cheng assisted with overseeing the entitlement process for the project's first phase. The <br /> entitlements in this phase are based on development replacing most of the previous uses that were approved through the Special <br /> Management Area Permit process. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Hilo WWTP Headworks, Primary Clarifies and Septage Station PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Upgrades, Hilo, Hawaii, HI Active -- <br /> b. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> The COH is proposing to implement improvement at the Hilo WWTP. Keola is the Planning Project Manager conducting research, <br /> including verifying existing conditions, reviewing available documents, and consulting with agencies, to determine required permits <br /> and approvals. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Wahiawa Center for Workforce Excellence(CWE) PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Wahiawa, Oahu, HI Active -- <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> c. State DOE is proposing the CWE adjacent to the new Wahiawa Civic Center. The facility will be used by three (3) major agencies <br /> Hawaii State Public Library System, the DOE, and the University of Hawaii Community Colleges. Each agency will be located <br /> separately and on separate floors with their own access control. It is recommended that the Library will be located on the ground <br /> floor, the DOE facilities on the second floor, and the UH facilities on the third floor. The project will also include an adjoining multi- <br /> level parking structure for both public and staff parking with access control. Keola is the Project Manager for the preparation of an <br /> Environmental Assessment and Zoning Waiver. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Pahala Large Capacity Cesspool Replacement PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Kau, HI <br /> 2020 <br /> d. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Sr. Planner for the preparation and processing of an Environmental Assessment for a new wastewater collection system and <br /> treatment plant to serve the community of Pahala in the rural Kau District. The EA also met National Environmental Policy Act <br /> requirements. Mr. Sakaguchi also prepared Special Use Permit. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Kona International Airport Master Plan Environmental Assessment, <br /> Kona, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> 2015 -- <br /> (3)BRIEF DESCRIPTION(Briefscope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> e. Planner for the preparation and processing of state and federal environmental assessments (EA)for proposed improvements at <br /> the Kona International Airport. In conjunction with the federal EA, consultation was coordinated for Section 7 of the ESAt and <br /> Section 106 of the NHPA Public meetings were held to present the proposed improvements and to solicit input, including for the <br /> aforementioned Section 106 process. <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021)PART I PAGE 9 <br />