E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY
<br /> (Complete one Section E for each key person.)
<br /> 12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE
<br /> Glenn Kuwaye, P.E., LEED AP Vice President & Director of Civil a.TOTAL b.WITH CURRENT FIRM
<br /> Engineering 24 19
<br /> 15. FIRM NAME AND LOCATION(City and State)
<br /> Wilson Okamoto Corporation, Honolulu, Hawaii
<br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> B.S., Civil Engineering, Santa Clara University, 2000 LEED Accredited Professional, 2009
<br /> PE-11817, Hawaii, Civil Engineering, 2005
<br /> PE-65310, California, Civil Engineer, 2003
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> Member, Japanese Chamber of Commerce
<br /> Certified Water Pollution Plan Preparer, City&County of Honolulu,12/31/2024
<br /> Certified Erosion and Sediment Control Plan Preparer, City&County of Honolulu, 12/31/2024
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Waimano Ridge Sewer System Assessment
<br /> Pearl City, Oahu, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> 2018 NA
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> a. Sr. Civil Engineer assisting with the preparation of an existing conditions report and Sewer Systems Study. Scope included
<br /> researching available drawings and documents; CCTV inspection of existing sewer lines; and the preparation of a sewer master
<br /> plan report. The Sewer System Report assessed existing conditions, identified constraints and maintenance issues, prepared
<br /> hydraulic analysis to determine sewer improvements required to support the redevelopment outlined in DOH's 2016 Master Plan
<br /> Update, described proposed sanitary sewer improvements, including maintenance and rehabilitation recommendations, and
<br /> rough order of magnitude cost for proposed improvements.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Salt Lake/Moanalua Public Library—Parking Lot Improvements
<br /> Moanalua, Oahu, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> 2020 2020
<br /> b. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Project Manager for the preparation of construction plans for demolition, site layout, and striping for the repaving of existing
<br /> parking lot.The repaving consisted of a cold plane and overlay to match the existing AC pavement grades and thickness. ECC:
<br /> $250K
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Waimano Ridge Site Water System Improvements,Assessment
<br /> and Design PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Pearl City, HI 2016 2016
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> C. Project Manager and Senior Civil Engineer for the design of upgrades to an existing water system, owned by the Department of
<br /> Health (DOH)and maintained under contract by the Board of Water Supply (BWS. Improvements to the system included the
<br /> upgrade of 5,000 linear feet of transmission/distribution lines, upgrade of the existing well building and electrical system to meet
<br /> BWS standards. The project also included the renovation of the existing booster pump station building, paving of 1,150 linear
<br /> feet of access driveway to the water tank and the installation of 23 fire hydrants,water meters and back-flow preventers. ECC:
<br /> $6 Million
<br /> (1)TITLE AND LOCATION(City and State)
<br /> (2)YEAR COMPLETED
<br /> lao Valley State Monument Phase 2—Permanent Repairs
<br /> lao, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> 5/2023 5/2023
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> d. The lao Valley State Monument Park sustained flood damage due to the September 2016 heavy rains on Maui. The heavy rains
<br /> caused the Wailuku River running through the park to rise, triggering flood damage and landslides along the banks of the park.
<br /> First phase involved design and construction of remedial measures to stabilize the stream bank to avert further undercutting.
<br /> Phase 2 involves permanent repairs to address the long-term stability of the parking lot. This will include installation of a series
<br /> of 30-foot reinforcing bars grouted into drilled holes to stabilize the slope and placement of shotcrete and sculptured to improve
<br /> the appearance of slope face.
<br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV. 7/2021)PART I PAGE 13