Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE <br /> Mason Suga, P.E., LEED AP Sr. Civil Project Manager a.TOTAL b.WITH CURRENT FIRM <br /> 16 16 <br /> 15. FIRM NAME AND LOCATION(City and State) <br /> Wilson Okamoto Corporation, Honolulu, Hawaii <br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> B.S., Civil Engineering, University of Hawaii at Manoa, 2008 PE-15138, Civil Engineering, Hawaii, 2012 <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> American Society of Civil Engineers <br /> Certified Water Pollution Plan Preparer, City&County of Honolulu,12/31/2024 <br /> Certified Erosion and Sediment Control Plan Preparer, City&County of Honolulu, 12/31/2024 <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Waimano Ridge Sewer System Assessment <br /> Pearl City, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> 2018 NA <br /> (3)BRIEF DESCRIPTION(Briefscope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> a. Associate Project Manager for the preparation of an existing conditions report and Sewer Master Plan Report for the State <br /> Department of Health. Scope included researching available drawings and documents; CCTV inspection of existing sewer lines; <br /> and the preparation of a sewer master plan report. The Sewer System Report assessed existing conditions, identified constraints <br /> and maintenance issues, prepared hydraulic analysis to determine sewer improvements required to support the redevelopment <br /> outlined in DOH's 2016 Master Plan Update, recommended proposed sanitary sewer improvements, including maintenance and <br /> rehabilitation, and rough order of magnitude cost for proposed improvements. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Collection System Maintenance(CSM) Pearl City Warehouse <br /> Pearl City, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Active -- <br /> b. (3)BRIEF DESCRIPTION(Briefscope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Mason is the Civil Project Manager overseeing the preparation of construction plans for site grading, drainage,water, sewer, and <br /> egress/ingress. The CCH is proposing to construct a new warehouse in the Pearl City Industrial Park. The lot encompasses <br /> approximately 1 acre. The warehouse will house supplies and equipment(pumps, pipes,sand bags, etc.) needed in the event of <br /> an emergency. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Manana Corporation Yard <br /> Honolulu HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Design-3/2020/Active Under Construction <br /> C' (3)BRIEF DESCRIPTION(Briefscope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Project Manager for the preparation of construction plans for the redevelopment of the City's Manana Corporation Yard. The <br /> project site will accommodate new facilities for the Department of Facility Maintenance, including new warehouse, parking <br /> structure, and storage areas. He also prepared and processed NPDES permit. Estimated construction cost: $25.2 million <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> City&County of Honolulu's Leeward Baseyard <br /> Ewa, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Design-2023/Active Under Construction <br /> d. <br /> (3)BRIEF DESCRIPTION(Briefscope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Project Manager preparing construction plans for the development of a new baseyard at James Campbell Industrial Park. The <br /> project will include a single story administration building, employee parking, covered parking bays for refuse truck fleet and other <br /> ancillary improvements. Construction plans include site demolition,site la out, grading,water, sewer and drainage. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Keahuolu Judiciary PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Kona, Hawaii, HI 2019 2019 <br /> e. <br /> (3)BRIEF DESCRIPTION(Briefscope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Project Engineer for a new Kona Judiciary located north of Makalapua Shopping Center in Kona. Civil scope included the <br /> preparation of construction plans for mass grading,site layout,drainage,water,wastewater and erosion control plans. Coordination <br /> was key as design and subdivision of the parcel was done simultaneously. Estimated construction cost$90 million <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV. 7/2021)PART I PAGE 17 <br />