Laserfiche WebLink
_® HHF PLANNERS <br /> PLANNING DEPARTMENT,COUNTY OF HAWAII -A places for people <br /> E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> 12. NAME 13. ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> a.TOTAL b.WITH CURRENT FIRM <br /> John Hagihara Principal 12 11 <br /> AICP <br /> 15. FIRM NAME AND LOCATION(City and State) <br /> Helber Hastert&Fee,Planners,Inc.DBA HHF Planners,Honolulu,Hawaii <br /> 16. EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) <br /> MA/Urban and Regional Planning <br /> BA/Economics <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> RELEVANT EXPERTISE <br /> • 10 years of experience managing and preparing NEPA documents for a range of projects in <br /> Hawaii and on Guam <br /> • Specialized expertise in multimodal transportation planning <br /> • Federal agency consultation support in Hawaii(ESA Section 7,NHPA Section 106,EFH <br /> assessments,CZMA consistency reviews,EO 11988 Floodplain Management) <br /> 19.RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Oahu Bike Plan Update PROFESSIONAL SERVICES CONSTRUCTION <br /> Island wide 2019 n/a <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br /> a. <br /> Project manager for the update of the current update of the bike master plan.HHF worked closely with the City Department of <br /> Transportation Services Complete Streets team in developing level of stress typologies and ensuring the complete streets projects <br /> are closely integrated with the regional bikeway network.HHF led a series of regional community meetings,with all information <br /> also available on a project website and via Facebook Live.Project Cost:$250K <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Honolulu Bikeshare Planning PROFESSIONAL SERVICES CONSTRUCTION <br /> Honolulu,Hawaii 2017 n/a <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br /> b. <br /> Project manager of a collaborative effort with locally formed non-profit Bikeshare Hawaii(Biki)and Toole Design Group to plan a <br /> 150 station bike share system in urban Honolulu.The project included extensive community engagement to solicit input on the <br /> proposed station locations,detailed site analysis to move the stations through the permitting process,and close coordination <br /> with multiple City and County of Honolulu departments(DTS,DPP,and DFM).Project Cost:$45K <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Wailele Stream Flood Risk Management Project PROFESSIONAL SERVICES CONSTRUCTION <br /> La`ie,0`ahu 2016 n/a <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br /> c. <br /> Project manager of a flood risk management feasibility study.Planning process included organizing and executing a project <br /> scoping charrette consisting of federal agency representatives,county,state,and local residents.HHF's multidisciplinary <br /> subconsultant team developed and evaluated a range of measures and alternatives and identified a Tentatively Selected Plan <br /> based on several criteria(economic,potential environmental and cultural impact,socioeconomic resources).Project Cost:$366K <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Ke`eaumoku Complete Streets PROFESSIONAL SERVICES CONSTRUCTION <br /> Honolulu,0`ahu Ongoing n/a <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br /> d. Project manager of a Complete Streets plan balancing the needs of people of all ages,abilities,and choice of transportation. <br /> The project team has led extensive community outreach to businesses and stakeholders along the corridor,as well as an online <br /> questionnaire and online community map which generated over 500 responses from the community.This feedback,coupled with <br /> vehicle traffic and turning data will inform development of two alternative street designs and the refinement of design concepts <br /> before they are presented to stakeholders and the public for another round of feedback.Project Cost:$400K <br /> AUTHORIZED FOR LOCAL REPRODUCTION 7 STANDARD FORM 330 (7/2021) <br />