My WebLink
|
Help
|
About
|
Sign Out
Home
2024-06-27 PL-INT-2024-008072 HHF Planners Category PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 24-25
>
PL - PLANNING
>
PL.05 - Environmental- EA, EIS
>
2024-06-27 PL-INT-2024-008072 HHF Planners Category PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2024 11:37:42 AM
Creation date
7/10/2024 2:54:06 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/27/2024
Permit Number
PL-INT-2024-008072
Description
HHF Planners, Professional services for category PL.4, PL.5, PL.6
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HHF PLANNERS <br /> PLANNING DEPARTMENT,COUNTY OF HAWAII - places for people <br /> E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> 12. NAME 13. ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> a.TOTAL b.WITH CURRENT FIRM <br /> Gail Renard Project Manager <br /> LEED AP 34 34 <br /> 15. FIRM NAME AND LOCATION(City and State) <br /> Helber Hastert&Fee,Planners,Inc.DBA HHF Planners,Honolulu,Hawaii <br /> 16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION(State and Discipline) <br /> BA/International Relations <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> American Planning Association,Hawai`i Chapter <br /> US Green Buildin.Council <br /> Him <br /> RELEVANT EXPERTISE <br /> • 30+years of experience managing and preparing NEPA and HRS 343 documents for a range of <br /> projects in Hawaii and across the Pacific Region <br /> • Federal agency consultation support in Hawaii and Guam(ESA Section 7,NHPA Section 106, <br /> EFH assessments,CZMA consistency reviews,EO 11988 Floodplain Management) <br /> • Managed and prepared 15 NEPA EIS/EA documents and 11 HEPA EIS/EAs including the Koa <br /> Ridge Ma kai-Waiawa Development EIS,one of the most high profile environmental projects <br /> on Oahu in the past decade <br /> 19.RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Pu'uhonua o Honaunau National Historical Park Remove&Replace PROFESSIONAL SERVICES CONSTRUCTION <br /> Park Maintenance Facilities EA 2023 <br /> Pearl City,0`ahu n/a <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br /> a• Project Manager and principal author of NEPA EA for a National Park Service project to relocate existing maintenance and resource <br /> management functions from their current location in substandard facilities in a coastal area known to contain archeological <br /> resources to new facilities at an upland location.HHF evaluated impacts on key environmental issue areas in three NPS-owned <br /> project sites(two within the main Park boundaries and one site three miles mauka);prepared materials in support of the project's <br /> ESA Section 7 consultation;prepared NEPA scoping meeting graphic materials;oversaw biological surveys of all three sites;and <br /> prepared the Finding of No Significant Impact and Non-Impairment Determination for the NPS.Project Cost:$138K <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Kawaihae Harbor Repair of Ramp and Dolphins EA PROFESSIONAL SERVICES CONSTRUCTION <br /> Kawaihae,Hawai`i Island ongoing n/a <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br /> b. Project manager and author of a NEPA EA for repair of berthing and mooring infrastructure at U.S.Army vessel mooring facilities at <br /> Kawaihae Harbor that support training at the Pohakuloa Training Area.Key environmental issues included NHPA Section 106,ESA <br /> Section 7,and EFH consultations.Managed the architectural historian's significance evaluation to support the NHPA Section 106 <br /> consultation,prepared CZMA consistency determination,and obtained and addressed public comments..Project Cost:$97K <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Hana Harbor Pier Deck Removal EIS PROFESSIONAL SERVICES CONSTRUCTION <br /> Maui 2018 n/a <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br /> Project manager for a project to demolish and replace the 90+year old Hana Pier.A prior assessment determined the pier to be <br /> beyond repair,and several alternative design schemes were examined for future consideration.HHF prepared an HRS Chapter 343 <br /> c. EIS for the State Department of Transportation,Harbors Division that was accepted by the Governor in 2019 Services include <br /> preliminary assessments,community planning and consultations,biological and engineering studies,and State environmental <br /> documentation preparation and processing.Project Cost:$560K <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (7/2021) <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.