My WebLink
|
Help
|
About
|
Sign Out
Home
2024-06-27 PL-INT-2024-008072 HHF Planners Category PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 24-25
>
PL - PLANNING
>
PL.05 - Environmental- EA, EIS
>
2024-06-27 PL-INT-2024-008072 HHF Planners Category PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2024 11:37:42 AM
Creation date
7/10/2024 2:54:06 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/27/2024
Permit Number
PL-INT-2024-008072
Description
HHF Planners, Professional services for category PL.4, PL.5, PL.6
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F// HHF PLANNERS <br /> PLANNING DEPARTMENT,COUNTY OF HAWAII places for people <br /> E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> 1110121080121210802.. <br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> a.TOTAL b.WITH CURRENT FIRM <br /> 0.4 Scott Ezer Principal <br /> 46 35 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> Helber Hastert&Fee, Planners, Inc.DBA HHF Planners, Honolulu, Hawai`i <br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) <br /> MA/Urban and Regional Planning <br /> BS/Sociology <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> RELEVANT EXPERTISE <br /> • 40+years of experience managing a wide range of community planning,land use,entitlement <br /> and environmental planning projects in all counties of Hawaii <br /> • Significant experience managing complex,high visibility environmental and community- <br /> based planning projects <br /> • Federal agency consultation support in Hawaii(ESA Section 7,NHPA Section 106,EFH <br /> assessments,CZMA consistency reviews,EO 11988 Floodplain Management) <br /> 19.RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Kea'au-Mountain View Public Library EA PROFESSIONAL SERVICES CONSTRUCTION <br /> Kea'au,Hawai`i Island Ongoing n/a <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br /> a. <br /> Principal-in-charge of an EA for a new 13,900 square foot public library on a 1.7-acre site adjacent to the Kea'au Middle School. <br /> The library will replace the existing Kea'au and Mountain View libraries which are unable to meet current standards for space, <br /> facilities,and technology.Project Cost:$255K <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Pu'uhonua o Honaunau National Historical Park Remove&Replace PROFESSIONAL SERVICES CONSTRUCTION <br /> Park Maintenance Facilities EA Ongoing n/a <br /> Honaunau,Hawai`i Island <br /> b. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br /> Principal-in-of a NEPA EA for a project to relocate existing maintenance and resource management functions from their current <br /> location in substandard facilities in an area known to contain archaeological resources,to new facilities at a more suitable location. <br /> Project Cost:$138K <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Hilo Bayfront Trails Master Plan PROFESSIONAL SERVICES CONSTRUCTION <br /> Hilo,Hawai`i Island 2009 under construction <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br /> c. <br /> Principal-in-charge of a master plan for a three-mile trail system to connect 700 acres from Hilo Harbor to historic downtown Hilo. <br /> The trail includes a combination of shared use paths,existing and proposed bikeways,bicycle lanes,and existing and proposed <br /> pedestrian walkways.The final trail alignment was informed to a high degree by community input and a diverse advisory <br /> committee.Trail construction is currently underway.Project Cost:$163K <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (7/2021) <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.