Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> A.TOTAL B.WITH CURRENT FIRM <br /> Carah Kadota,AICP Assistant Planning Project Manager 8 1 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> (Bowers+Kubota Consulting,Waipahu,HI <br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) <br /> Bachelor of Environmental Design <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> American Planning Association,Hawaii Chapter American Institute of Certified Planners(Certificate No.34599) <br /> • . ►TPC• T ! �® <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> City and County of Honolulu,Department of Design and Construction PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Kahawainui Stream Dredging Ongoing N/A <br /> Laie,HI <br /> a. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> ROLE:Planner <br /> SCOPE:Processing permit applications with approvals including DA permit,401WQC,NPDES permit for construction <br /> stormwater discharges,stream channel alteration,HRS Ch. 6E with SHPD. <br /> PROJECT COST: $2,000,000 <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> State of Hawaii,Department of Transportation,Highways PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Vulnerable Road User Safety Assessment(VRUSA) <br /> Statewide HI Ongoing N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> ROLE:Planner <br /> bSCOPE: Working with the HDOT to develop the State's first Vulnerable Road User Safety Assessment(VRUSA). A VRUSA is <br /> an assessment of the safety performance of a State with respect to vulnerable road users and the plan for the State to improve <br /> the safety of vulnerable road users.Addressing the safety of vulnerable road users through a collaborative and comprehensive <br /> approach allows people that walk,bike,and roll full and safe access to our transportation system.The assessment will include <br /> the Safe System Approach,which aims to improve safety culture,increase collaboration across all stakeholders,and refocus <br /> transportation system design and operation on anticipating human mistakes and lessening impact forces to reduce crash <br /> severity and save lives. <br /> PROJECT COST: 575,000 <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> State of Hawaii,Department of Transportation PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Highways Route 50(Kaumualii Highway)Feasibility Study,Hanapepe to <br /> Kekaha Ongoing N/A <br /> Kauai,HI <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> c. ROLE:Planner <br /> SCOPE:B+K will conduct a Feasibility Study to explore conceptual details,constraints,and prospective timelines for different <br /> resiliency improvement alternatives based on probable future scenarios of concern for Route 50,Kaumualii Highway,from <br /> Hanapepe to Kekaha. The scope of work will include coastal modeling of tidal flood frequency analysis and high-resolution <br /> sea level rise and wave inundation modeling.The modeling will be conducted for a variety of future sea level rise scenarios <br /> combined with different wave events to help estimate the frequency of occurrence of flooding at selected intervals in the future. <br /> PROJECT COST:N/A <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> State of Hawaii,Department of Transportation,Harbors PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Consulting Engineer's Report for FY2017-2019 <br /> Statewide,HI 2021 N/A <br /> d. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> ROLE:Planner <br /> SCOPE:Preparation of a Consulting Engineer's Report that examined the operations of all commercial harbors and associated <br /> improvements within fiscal year 2017-2019. <br /> PROJECT COST: $50,000 <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> State of Hawaii,Department of Transportation,Harbors PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Department of Transportation,Harbors <br /> Pier 40 Improvements Honolulu Harbor <br /> Honolulu,HI Ongoing N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> e. ROLE:Planner <br /> SCOPE:State Department of Transportation,Harbors is proposing improvements to Piers 39 and 40 that's used by <br /> Young Brothers as an interisland terminal. The project would fill the harbor area between Piers 39 and 40 and demolish certain <br /> areas of these piers to offset fill and loss of U.S. Waters. Inland areas would be raised 3 feet to address sea level rise and <br /> redevelopment of Young Brothers facilities. An EIS would be prepared along with addressing several federal requirements to <br /> support a U.S.COE Individual Permit for pier work.PROJECT COST: $1,413,000 <br /> STANDARD FORM 330(7/2021)Page 6 <br />