Laserfiche WebLink
H.ADDITIONAL INFORMATION <br /> 30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED. <br /> • Wastewater treatment system optimization studies <br /> • Operation and maintenance manuals <br /> • Training of water and wastewater operators <br /> One aspect of our civil and environmental practice that sets up apart from other firms is the high number of personnel that <br /> obtain third-party certifications. We have six engineers that are certified professionals in erosion and sediment control; <br /> two of whom are also certified professionals in stormwater quality. These additional certifications demonstrate our staff's <br /> unique value-added expertise in erosion and sediment control and stormwater quality. In addition, each of our licensed <br /> civil engineers is a Certified Water Pollution Plan Preparer(CWPPP) and a Certified Erosion And Sediment Control Plan <br /> Preparer(CESCPP). All our non-licensed civil engineers are Erosion and Sediment Control Plan Coordinators (ESCPCs) <br /> and some of our licensed civil engineers are also ESCPCs. We are committed to being experts in erosion and sediment <br /> control and stormwater quality,management, and treatment. <br /> Electrical Engineering <br /> B+K electrical group has been providing quality electrical designs in the State of Hawaii for over 30 years, formally <br /> known as Ho & Okita and H&O-III, before merging with Bowers + Kubota. With projects ranging from renovations to <br /> new buildings and covering services, site distribution, electrical, <br /> ELECTRICAL ENGINEERING CAPABILITIES lighting, fire alarm, telecom infrastructure work, we've worked <br /> • ELECTRICAL ENGINEERING DESIGN with all sectors of the construction industry,including commercial, <br /> • TELECOMMUNICATIONS ENGINEERING DESIGN city, county, state and federal branches. Our longevity is based <br /> • ILLUMINATION ENGINEERING DESIGN on our work ethic. All projects are approached with three goals: <br /> • FIRE ALARM DESIGN Providing a design that can be built, providing a design that is on <br /> • UTILITY COMPANY COORDINATION time and providing a design that is on budget. <br /> • COST ESTIMATING/COST ANALYSIS <br /> • CONSTRUCTION DOCUMENTATION This work ethic can be seen in our ongoing project with the State <br /> • BIDDING AND PERMITTING SERVICES Department of Education (DOE) to design fire alarm systems for <br /> • DUE DILIGENCE/EXISTING CONDITIONS SURVEY various school campuses. Our services include assessing and the <br /> • CONTRACT ADMINISTRATION setting the priority of projects,setting the standards for all DOE fire <br /> alarm projects, designing the bulk of all yearly fire alarm projects <br /> and reviewing the designs from other engineering offices. Our designs are based on extensive site investigations. All site <br /> conditions are examined to produce a design that can be built with minimal to no field adjustments required. The design <br /> process involves heavy project scheduling and coordination to meet all deadlines. Throughout the design process,the cost <br /> is evaluated with revisions being made to keep the project in budget. <br /> The result of our work ethic is being able to produce more completed fire alarm system designs for the DOE than all other <br /> consultants combined.Because of our attention to detail,knowledge of local and national code requirements,and our ability <br /> to solve all encountered problems,the DOE turns to our office for advice on all fire alarm related issues. <br /> The example above illustrates the level of commitment our electrical group provides to our clients. We approach each <br /> project with the same level of commitment.We are continually learning and striving to improve our quality of work so we <br /> can provide our clients with the highest quality designs and technical support. <br /> Construction Management <br /> Because ofB+K's extensive experience as a Construction Manager CONSTRUCTION MANAGEMENT CAPABILITIES <br /> • <br /> on civil related construction projects, we bring experience and PROJECT SCHEDULING AND TRACKING <br /> • <br /> knowledge to construction projects at existing and new facilities. Cosi CONTROL&ESTIMATING <br /> • CLAIM ANALYSIS AND AVOIDANCE <br /> These projects require significant coordination and frequent • <br /> QUALITY CONTROL <br /> communication and collaboration with the City, facility users, • CONSTRUCTABILITY REVIEWS <br /> and community to ensure that impact to operations and the • VALUE ENGINEERING <br /> surrounding environment are minimized as much as possible. • CONSTRUCTION BID MANAGEMENT AND EVALUATION <br /> For example, the ongoing construction work for the Salt Lake • CONSTRUCTION PLANNING AND COORDINATION <br /> Boulevard Widening, Phase 3 project for the City and County • CONSTRUCTION INSPECTION <br /> of Honolulu, Department of Transportation Services (DTS) • PROGRESS REPORTS <br /> includes removal of trees, demolition of existing pavement, • PROJECT COMMISSIONING <br /> driveways, and other homeowner encroachments located within • PROJECT DOCUMENTATION <br /> Standard Form 330(6/2004)Page 29 <br />