Laserfiche WebLink
County of Hawaii,Planning Department Section E <br /> PL.5)Community Planning(Environmental Planning,Environmental Assessments,Environmental Impact Statements) Fiscal Year 2024-2025 <br /> County of Hawaii, Planning Department <br /> E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> Irina Constantinescu, PE,LEED AP wia,i68e, urea a.TOTAL b.WITH CURRENT FIRM <br /> Technical Advisor(QA/QC 19 11 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> Brown and Caldwell,Wailuku, Hawaii <br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) <br /> MS, Civil Engineering(Water Resources), 2006 Hawaii/Licensed Civil Engineer#14926; Exp.4/30/26 <br /> BS, Environmental Engineering, 2005 California/Licensed Civil Engineer#73228 <br /> BA, French, 2005 Guam/Licensed Civil Engineer#1897 <br /> California/Licensed Traffic Engineer#2622 <br /> CNMI/Engineer(Civil) <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> Leadership in Energy and Environmental Design (LEED)AP, Hawaii National Society of Professional Engineers(NSPE) <br /> 19.RELEVANT PROJECTS <br /> a. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> County of Hawaii Department of Water Supply LCRR Compliance, PROFESSIONAL SERVICES CONSTRUCTION(ifapplicable) <br /> Hawaii County, Hawaii Ongoing N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Project Oversight. BC is providing professional services for DWS to be in full compliance with the United States <br /> Environmental Protection Agency(EPA) Lead and Copper Rule Revisions(LCRR) by the compliance date of October <br /> 16, 2024.The scope of work for BC and our subconsultant ETC over this multi-year contract includes: preparation <br /> of a lead service line(LSL) inventory; development of a LSL replacement plan; preparation of a sample site list <br /> of residential properties,commercial properties,school facilities, and child care facilities;conducting tap water <br /> sampling;and any other work required for full compliance with the LCRR. <br /> Total Contract Amount: $3.5M Client:County of Hawaii, Dept.of Water Supply <br /> b. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Kealakehe Wastewater Treatment Plant R-1 Upgrade, Kailua- PROFESSIONAL SERVICES CONSTRUCTION(ifapplicable) <br /> Kona, Hawaii 2022 Forthcoming <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Deputy Project Manager/Project Engineer(Civil). BC designed significant upgrades to the Kealakehe Wastewater <br /> Treatment Plant in Kailua-Kona. Upon completion,the Kealakehe Wastewater Treatment Plant will have the largest <br /> recycled water treatment system on Hawaii Island-the first facility of its kind for the County of Hawaii. The upgrades <br /> included a treatment system to create R-1 recycled water and a new effluent disposal system.The upgrades will <br /> significantly reduce the community's impact to the environment.The draft environmental impact statement has <br /> been published. <br /> Total Contract Amount: $8.6M Client:County of Hawaii, Dept.of Environmental Management <br /> c. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Central Maui Regional Wastewater Reclamation Facility Study, PROFESSIONAL SERVICES CONSTRUCTION(ifapplicable) <br /> Maui, Hawaii Ongoing N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Project Manager.The County of Maui is planning a new wastewater reclamation facility(WWRF) in Central Maui. BC <br /> is preparing the preliminary design and technical reports needed to accompany the on-going Environmental Impact <br /> Statement(EIS)efforts.The WWRF will treat and dispose of wastewater generated by growth areas in Central Maui as <br /> well as some of the existing development,thus relieving capacity at the Wailuku-Kahului WWRF. <br /> Total Contract Amount: $1.2M Client: County of Maui, Dept.of Environmental Management,Wastewater <br /> Reclamation Division <br /> IBrown AND Caldwell STANDARD FORM 330(REV.7/2021) : 7 <br />