Laserfiche WebLink
County of Hawaii,Planning Department Section E <br /> PL.5)Community Planning(Environmental Planning,Environmental Assessments,Environmental Impact Statements) Fiscal Year 2024-2025 <br /> d. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Engineering Services to Design a Wastewater Treatment Collection PROFESSIONAL SERVICES CONSTRUCTION(ifapplicable) <br /> and Disposal System for the Pahala Wastewater Treatment Plant and 2024 N/A <br /> Post-Design, Pahala, Hawaii <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Program Manager. BC is providing engineering services for the closure of large capacity cesspools and construction <br /> of new wastewater infrastructure in Pahala,to meet updated effluent discharge requirements dictated by the USEPA. <br /> BC completed the planning phase,which included a preliminary engineering report,environmental assessment, <br /> regulatory and permit identification,site alternatives evaluation and land acquisition, community outreach, and <br /> conceptual alternatives for the design,construction, and commissioning of the system.While the infrastructure was <br /> originally designed around a natural treatment system to minimize environmental impacts,simplify maintenance <br /> requirements,and achieve reliability,alternative treatment technologies are being evaluated to address additional <br /> constraints related to affordability and unique geology of the area. <br /> Total Contract Amount: $4.3M Client:County of Hawaii, Dept.of Environmental Management <br /> e. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Honokaa Wastewater Treatment Plant Upgrade Project, PROFESSIONAL SERVICES CONSTRUCTION(ifapplicable) <br /> Honokaa, Hawaii 2015 2012 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Project Manager. BC designed upgrades to the Honokaa Wastewater Treatment Plant, located on Hawaii Island,to <br /> accommodate increased flows that will result from the abandonment of large capacity cesspools in the community. <br /> The existing wastewater treatment plant consisted of two facultative ponds with three injection wells for effluent <br /> disposal.The design included modification to three existing injection wells and construction of three additional <br /> injection wells to provide the necessary disposal capacity.The upgrade project increases the facility capacity <br /> from 56,800-gallons per day to 200,000-gallons per day by converting the system to a partial mix aerated lagoon <br /> treatment process. <br /> Total Contract Amount: $1.2M Client: County of Hawaii, Dept.of Environmental Management <br /> IBrown AND Caldwell STANDARD FORM 330(REV.7/2021) : 12 <br />