My WebLink
|
Help
|
About
|
Sign Out
Home
2024-06-28 PL-INT-2024-008098 Brown and Caldwell Category PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 24-25
>
PL - PLANNING
>
PL.05 - Environmental- EA, EIS
>
2024-06-28 PL-INT-2024-008098 Brown and Caldwell Category PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2024 12:38:02 PM
Creation date
7/1/2024 9:16:14 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/28/2024
Permit Number
PL-INT-2024-008098
Description
Brown and Caldwell, Professional services for category PL.5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County of Hawaii,Planning Department Section E <br /> PL.5)Community Planning(Environmental Planning,Environmental Assessments,Environmental Impact Statements) Fiscal Year 2024-2025 <br /> County of Hawaii, Planning Department <br /> E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> Tom Myers, PE Principal-in-tnarge a.TOTAL b.WITH CURRENT FIRM <br /> 31 31 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> Brown and Caldwell, Honolulu, Hawaii <br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) <br /> BS, Environmental Engineering, 1994 Hawaii/Licensed Civil Engineer#9758; Exp 4/30/26 <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> Trained in the Sandia Risk Assessment Methodology for Security of Water/Wastewater RAM-WSM;Water Environment <br /> Federation/Hawaii Water Environment Association (WEF/HWEA);American Water Works Association (AWWA) <br /> 19.RELEVANT PROJECTS <br /> a. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> County of Hawaii Department of Water Supply LCRR Cornpliance, PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Hawaii County, Hawaii 2023 Ongoing <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Principal-in-Charge. BC is providing professional services for DWS to be in full compliance with the United States <br /> Environmental Protection Agency(EPA) Lead and Copper Rule Revisions(LCRR) by the compliance date of October <br /> 16, 2024.The scope of work for BC and our subconsultant ETC over this multi-year contract includes: preparation <br /> of a lead service line(LSL) inventory; development of a LSL replacement plan; preparation of a sample site list <br /> of residential properties,commercial properties,school facilities, and child care facilities;conducting tap water <br /> sampling;and any other work required for full compliance with the LCRR. <br /> Total Contract Amount: $3.5M Client:County of Hawaii, Dept.of Water Supply <br /> b. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> DPW Baseyards Master Facility Plan, Kahului, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(ifapplicable) <br /> Ongoing N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Principal-in-Charge. BC was contracted by the County of Maui to complete a Master Plan for Department of Public <br /> Works(DPW) Highways Division Baseyard Facilities.The Master Plan identifies long-term solutions that enable <br /> DPW Highways Division to maintain safe roads, bridges, and drainage facilities.This project includes five key <br /> tasks: 1) Baseyard Facilities Needs Assessment, 2) Facilities Location Alternatives,3) Preferred Alternative and <br /> Implementation,4) Baseyards Master Plan and 5) Molokai Cemetery Plan.Stakeholder input throughout the process <br /> is guided by a stakeholder engagement plan that outlines goals,strategies,and key messaging.The scope of services <br /> for this project includes strategic assessment and planning to support infrastructure and operational improvements <br /> for DPW Highways Division baseyards.The Baseyards Master Plan identifies and prioritizes actions that support <br /> County and State initiatives,and best serve the residents,visitors,and other departments in Maui County.To address <br /> sea level rise vulnerability and capacity issues,the Molokai Cemetery Plan task evaluates potential expansion <br /> alternatives and gathers stakeholder input to determine a preferred site. <br /> Total Contract Amount: $808K Client:County of Maui, Dept. of Public Works, Highways Division <br /> IBrown AND Caldwell STANDARD FORM 330(REV.7/2021) : 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.