Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY <br /> 11.NAME 12.TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED <br /> Eric M. Lau,P.E. Senior Environmental Engineer a.TOTAL b.WITH CURRENT FIRM <br /> 20 15 <br /> 14.FIRM NAME AND LOCATION(City and State) <br /> Element Environmental,LLC,Aiea,Hawaii <br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> M.S.,Civil/Environmental Engineering, MIT Registered Professional Engineer,HI-Civil No. 12977 <br /> B.S., Civil and Environmental Engineering, MIT Certified Asbestos Inspector, HIASB-3198 <br /> B.S., Biology, MIT Certified Lead Risk Assessor, PB-0439 <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> OSHA 40-hour HAZWOPER Training 40-hour Construction Safety Hazard Awareness Training <br /> OSHA 8-hour HAZWOPER Refresher Training for Contractors <br /> OSHA 30-hour Construction Safety and Health Hazardous Waste Site Supervisor Training <br /> Training Bloodborne Pathogens, First Aid, CPR, and AED Training <br /> Confined Space Training <br /> 18. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Non-Domestic Wastewater Management Plan,JBPHH,Oahu,Hawaii PROFESSIONAL SERVICES CONSTRUCTION <br /> Ongoing N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> E2 evaluated NAVFAC Hawaii's 8,000+ facilities to identify, characterize, and quantify non-domestic <br /> wastewater discharges to the sanitary sewer system tributary to the NAVFAC Hawaii Wastewater Treatment <br /> a. Plant(WWTP). Coordinated site visits to and conducted interviews with facility managers of over 750 facilities. <br /> The inventory of non-domestic wastewater sources collected in this study will be used to determine additional <br /> non-domestic discharges that should be internally permitted and regulated.The project also includes quarterly <br /> wastewater sampling efforts to collect both grab and 24-hour composite samples from WWTP influent <br /> locations on the Hickam Field flight line and Pearl Harbor, as well as effluent samples from the WWTP. Fee: <br /> $1,154,918. Role:Assistant Project Manager/Senior Environmental Engineer. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Navy Spill Prevention Control and Countermeasure Plan Update, PROFESSIONAL SERVICES CONSTRUCTION <br /> JBPHH,Oahu,Hawaii 2023 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> b. E2 completed an update of the Navy SPCC Plan in accordance with 40 CFR 112 regulating ASTs storing <br /> petroleum and cooking oil products. E2 inspected 521 ASTs and bulk oil storage areas at all Naval installations <br /> on Oahu.Worked closely with NAVFAC personnel to update the inventory, condition, and management of Navy <br /> ASTs and subsequently generated an updated SPCC Plan. Developed AST inspection forms and maintained a <br /> database of AST inspection data collected. Fee: $487,580.Role: Senior Environmental Engineer. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Waianae Agricultural Park Improvements,Waianae,Oahu,Hawaii PROFESSIONAL SERVICES CONSTRUCTION <br /> 2017 2018 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Completed the design of miscellaneous improvements to the drainage system at the Waianae Agricultural Park. <br /> c' The improvements included slope stabilization of drainage ways, diversion of runoff into an infiltration basin, <br /> design of overflow protection drainage intakes for the infiltration basin, and repairs to existing concrete <br /> drainage swales. Responsible for preparation of construction documents (i.e., plans and specifications) and <br /> services during bidding and construction. The construction plans were completed on an accelerated schedule <br /> to meet the funding requirements for construction. Fee: $60,000. Role: Senior Environmental Engineer. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Reservoirs 155 and 255 Capacity Study,Kunia,Oahu,Hawaii PROFESSIONAL SERVICES CONSTRUCTION <br /> 2010 N/A <br /> d. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Conducted a study concerning the repair, maintenance, and capacity options for Reservoirs 155 and 225 of the <br /> Waiahole Ditch Irrigation System for the Agribusiness Development Corporation. Fee: $30,000. Role: Senior <br /> Environmental Engineer. <br /> ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 7 <br />