|
E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY
<br /> 11.NAME 12.TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED
<br /> Joshua B.Agpaoa, E.I.T. Staff Civil Engineer a.TOTAL b.WITH CURRENT FIRM
<br /> 6 6
<br /> 14.FIRM NAME AND LOCATION(City and State)
<br /> Element Environmental,LLC,Aiea,Hawaii
<br /> 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> B.S., Civil Engineering,University of Hawaii at Manoa Engineer-in-Training,HI (E.I.T.)
<br /> Certified Asbestos Inspector, HIASB-4791
<br /> Certified Risk Assessor/Lead Inspector, PB-1137
<br /> 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> OSHA 40-hour HAZWOPER Training 40-HR Construction Safety Hazardous Awareness
<br /> OSHA 8-hour HAZWOPER Refresher Training Training for Contractors
<br /> Bloodborne Pathogens, First Aid, CPR and AED Training
<br /> 18. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> Navy Spill Prevention Control and Countermeasure Plan Update, PROFESSIONAL SERVICES CONSTRUCTION
<br /> JBPHH, Oahu,Hawaii 2023 N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with the current firm
<br /> a. E2 completed an update of the Navy SPCC Plan in accordance with 40 CFR 112 regulating ASTs storing
<br /> petroleum and cooking oil products. E2 inspected 521 ASTs and bulk oil storage areas at all Naval installations
<br /> on Oahu. Worked closely with NAVFAC personnel to update the inventory, condition, and management of Navy
<br /> ASTs and subsequently generated an updated SPCC Plan. Developed AST inspection forms and maintained a
<br /> database of AST inspection data collected. Fee: $487,580. Role: Staff Civil Engineer.
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> Biosolids Handling and Disposal Plan,Pacific Missile Range PROFESSIONAL SERVICES CONSTRUCTION
<br /> Facilities,Wastewater Treatment Plant,Kauai Ongoing N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with the current firm
<br /> Conducted a site investigation and sampling at the Pacific Missile Range Facility (PMRF), Kekaha, Kauai, Hawaii.
<br /> b. The study included various components of the wastewater treatment systems throughout the Base, with a focus
<br /> on the existing wastewater treatment plant (WWTP), individual wastewater system (IWS) facilities, sludge
<br /> drying beds, and the wastewater oxidation pond (WOP). E2 evaluated the current biosolids handling practices
<br /> and will develop a long-term plan for the proper treatment and disposal of biosolids at PMRF, including IWS
<br /> septage,WWTP and WOP sludge.Fee: $128,895. Role: Staff Civil Engineer.
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> Illicit Discharge Storm Water Inspections for Commander Navy PROFESSIONAL SERVICES CONSTRUCTION
<br /> Region Hawaii,Joint Base Pearl Harbor-Hickam,Oahu,Hawaii 2024 N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with the current firm
<br /> E2 completed an illicit discharge survey for non-storm water discharges to CNRH municipal separate storm
<br /> sewer (MS4) and waters of the U.S. in accordance with the NPDES permit issued. The project scope includes
<br /> c.
<br /> inspections of over 1,800 sites at Naval installations throughout the island of Oahu. The inspections are to
<br /> identify any existing or potential sources of illicit discharges at each facility. E2 completed field inspections and
<br /> prepared a report summarizing the findings. Responsibilities included: conducting inspections, identifying
<br /> corrective actions, updating the database for submittal, and preparation of conceptual designs and cost
<br /> estimates for corrective actions. Fee: $365,424.Role: Staff Civil Engineer.
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> Spill Prevention and Response Plan for Marine Corps Base Butler PROFESSIONAL SERVICES CONSTRUCTION
<br /> Okinawa,Japan 2023 N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with the current firm
<br /> d. E2 completed a Spill Prevention and Response Plan (SPRP) for Marine Corps Base (MCB) Camp Butler located in
<br /> Okinawa, Japan. Mobilized a team of six personnel for the duration of three weeks in order to complete
<br /> fieldwork tasks in one visit. Inspected 329 ASTs, 26 USTs, 34 chemical storage tanks, and 747 electrical
<br /> transformers with capacities of 105 gallons and/or larger at 12 Sites in Okinawa and the nearby Island of Le
<br /> Shima. E2 completed data sheets/photographs of each feature. Fee: $340K.Role: Staff Civil Engineer.
<br /> ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 19
<br />
|