|
E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY
<br /> 11.NAME 12.TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED
<br /> Leslie A. Robinson, E.I.T. Project Engineer a.TOTAL b.WITH CURRENT FIRM
<br /> 17 3
<br /> 14.FIRM NAME AND LOCATION(City and State)
<br /> Element Environmental,LLC,Aiea,Hawaii
<br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> M.S., B.S., Civil Engineering, Massachusetts Institute of Engineer-in-Training(E.I.T.)
<br /> Technology Radon Measurement Professional - NRPP 114210-RMP
<br /> Certified Asbestos Inspector, CHC Training-83343433
<br /> 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> OSHA Initial HAZWOPER Training, 40-HR How to Conduct a Sanitary Survey of Surface Water and
<br /> OSHA Refresher Training, 8-HR Ground Water System Course,U.S. Environmental
<br /> Cross Connection Control and Hydraulic Research Protection Agency
<br /> Specialist Training, University of Southern California 40-HR Construction Safety Hazard Awareness Training for
<br /> Confined Space Training Contractors
<br /> Bloodborne Pathogens, First Aid, CPR, and AED Training
<br /> 18. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Non-Domestic Wastewater Management Plan,Joint Base Pearl PROFESSIONAL SERVICES CONSTRUCTION
<br /> Harbor-Hickam,Oahu,Hawaii 2023 N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> a. E2 evaluated NAVFAC Hawaii's 8,000+ facilities to identify,characterize, and quantify non-domestic wastewater
<br /> discharges to the sanitary sewer system tributary to the NAVFAC Hawaii Wastewater Treatment Plant.
<br /> Coordinated site visits to and conducted interviews with facility managers of over 750 facilities. The inventory
<br /> of non-domestic wastewater sources collected in this study will be used to determine additional non-domestic
<br /> discharges that should be internally permitted/regulated. Fee: $1,1 M. Role: Project Civil Engineer.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Cross-Connection Control Survey,Pacific Missile Range Facility PROFESSIONAL SERVICES CONSTRUCTION
<br /> Barking Sands,Kekaha,Kauai,Hawaii 2019 N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑ Check if project performed with current firm
<br /> Conducted a cross-connection control survey of high priority facilities at Pacific Missile Range Facility (PMRF)
<br /> b. Barking Sands to identify potential cross-connection conditions and evaluate existing backflow prevention
<br /> (BFP) devices. Created a database to track BFP devices, device deficiencies, cross-connection conditions, and
<br /> recommended corrective actions. Ms. Robinson's responsibilities included producing the Work Plan, organizing
<br /> inspection teams, field inspections, developing the database, and preparing the Draft and Final Reports. Role:
<br /> Engineer.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Sanitary Survey for Marine Corps Base Camp Butler and Combined PROFESSIONAL SERVICES CONSTRUCTION
<br /> Arms Training Center Fuji,Japan 2016 N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑ Check if project performed with current firm
<br /> Conducted a sanitary survey to evaluate the drinking water system for ten installations at MCB Camp Butler and
<br /> Combined Arms Training Center (CATC) Fuji. Performed an on-site review of the eight elements: water source;
<br /> c.
<br /> treatment; distribution system; finished water storage; pumps; monitoring, reporting, and data verification;
<br /> system management and operations; and operator compliance. Ms. Robinson's responsibilities included water
<br /> sampling, facility personnel interviews, inspection of on-base and off-base water system facilities, review of
<br /> water quality monitoring records, and preparation of the report of identified deficiencies and recommended
<br /> system improvements. Role: Engineer.
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> Spill Prevention and Response Plan for Marine Corps Base Camp PROFESSIONAL SERVICES CONSTRUCTION
<br /> Butler, Okinawa,Japan 2023 N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with the current firm
<br /> e. E2 completed a Spill Prevention and Response Plan (SPRP) for Marine Corps Base (MCB) Camp Butler located in
<br /> Okinawa,Japan. Mobilized a team of six personnel for the duration of three weeks in order to complete fieldwork
<br /> tasks in one visit. Inspected 329 ASTs, 26 USTs, 34 chemical storage tanks, and 747 electrical transformers with
<br /> capacities of 105 gallons and/or larger at 12 Sites in Okinawa and the nearby Island of Le Shima. E2 completed
<br /> data sheets/photographs of each feature.Fee: $340K. Role: Project Civil Engineer.
<br /> ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025—PAGE 21
<br />
|