Loading...
HomeMy WebLinkAbout2024-06-29 PL-INT-2024-008115 Element Environmental, LLC Category PL.5 DeVera, Ashley From: Darla Won <dwon@e2hi.com> Sent: Saturday, June 29, 2024 10:31 PM To: Planning Internet Mail Cc: Ryan Yamauchi; Jaylene Sablan Subject: Element Environmental LLC - Submittal for County of Hawaii - Planning Department FY25 Attachments: PL.5) Element Environmental, LLC COH-FY25 Planning.pdf Aloha Mr. Zendo Kern, On behalf of Ryan Yamauchi, P.E., Element Environmental, LLC please accept our Statement of Qualifications (SOQ) in response to the Annual Notice to Providers for Professional Services, Fiscal Year 2025. We are interested in providing services as follows: Planning Department PL.5) Community Planning(Environmental Planning, Environmental Assessments, Environmental Impact Statements). Please kindly respond to this email so that we know you are in receipt of our SOQ. Should you have any questions, please do not hesitate to contact us. Sincerely, Darla Won Marketing Director Element Environmental, LLC 98-030 Hekaha Street, Unit 9 Aiea, Hawaii 96701 Cell: (808) 741-5059 Office: (808) 488-1200 I Fax: (808) 488-1300 1 q C.� L STATEMENT OF 'yk,�'_ QUALIFICATIONS dir COUNTY OF HAWAII PLANNING DEPARTMENT NOTICE TO PROVIDERS OF PROFESSIONAL SERVICES FISCAL YEAR 2024-2025 (July 1, 2024 -June 30, 2025) PL.5) COMMUNITY PLANNING (ENVIRONMENTAL PLANNING, ENVIRONMENTAL ASSESSMENTS, ENVIRONMENTAL IMPACT STATEMENTS) _ r 98-030 Hekaha Street,Unit 9,Aiea, Hawaii 96701 / tel: (808) 488-1200 fax: (808) 488-1300 element environmental Hc environmental • engineering • water resources www.e2 hi.com "This proposal includes confidential material that shall not be disclosed outside of the Government and shall not be duplicated, used, or disclosed- in whole or in part-for any purpose other than to evaluate this proposal." 0 Oelement environmental tic environmental • engineering • water resources June 28, 2024 Mr. Zendo Kern, Planning Director Planning Department County of Hawaii 101 Pauahi Street,Suite 3 Hilo, Hawaii 96720 Email: planning@hawaiicounty.gov Subject: Element Environmental,LLC's Statement of Qualifications in Response to the Planning Department,County of Hawaii's Notice to Providers of Professional Services,Fiscal Year 2024-25 Dear Mr. Kern, Element Environmental, LLC (E2) is pleased to submit our Statement of Qualifications (SOQ) to the County of Hawaii, Planning Department per the "Notice to Providers of Professional Services" solicitation notice for the fiscal year 2024 to 2025. This serves as our expression of interest in providing services for PL.5) Community Planning (Environmental Planning, Environmental Assessments, Environmental Impact Statements). In accordance with the notice, we have enclosed our completed Federal Form 330 (SFR330) which includes the following: (1) The name of our firm, contact information,and principal place of business; (2) The age of our firm and its average number of employees over the past five years; (3) The education,training, and qualifications of our key employees; (4) A list of recent projects and the names of five clients who may be contacted, including two for whom services were rendered during the preceding year; and (5) Promotional/descriptive literature. Please call me on my cellular phone number (808) 864-3952 or email ryamauchi@e2hi.com should you have any questions regarding this submittal. Sincerely, tr:7_, . Ryan S.W.Yamauchi, P.E. President 98-030 Hekaha Street, Unit 9,Aiea, Hawaii 96701 tel: (808)488-1200 fax: (808) 488-1300 www.e2hi.com PROFESSIONAL SERVICES QUALIFICATIONS PART I - SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1.PUBLIC NOTICE DATE 2.PROJECT CATEGORY June 1, 2024 PL.5) Community Planning(Environmental Planning, Environmental Assessments,Environmental Impact Statements) B. POINT OF CONTACT 3.NAME AND TITLE Ryan S.W.Yamauchi,P.E.,President 4.NAME OF FIRM Element Environmental,LLC 5.TELEPHONE NUMBER 6.FAX NUMBER 7.E-MAIL ADDRESS (808) 488-1200 (808) 488-1300 ryamauchi@e2hi.com C. PROPOSED TEAM (THIS SECTION MUST BE COMPLETED FOR PROJECT CATEGORIES) (Check) cc 4 cc L.• > z H 8. FIRM NAME 9. ADDRESS 10. ROLE IN THIS CONTRACT ± � c (Co) a d Q D Cr d U) H E11 ❑ Element Environmental,LLC 98-030 Hekaha Street Prime Contractor Unit 9,Aiea,Hawaii 96701 PL.5) Community Planning (Environmental Planning, Environmental Assessments, Environmental Impact a. Statements) ❑CHECK IF BRANCH OFFICE ❑ ❑ ❑ b. ❑CHECK IF BRANCH OFFICE ❑ ❑ ❑ C. ❑CHECK IF BRANCH OFFICE ❑ ❑ ❑ d. ❑CHECK IF BRANCH OFFICE ® D. ORGANIZATIONAL CHART OF PROPOSED TEAM ® (Attachment 1) ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 1 E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY 11.NAME 12.TITLE SERVICE PROVIDED 13.YEARS OF EXPERIENCE Ryan S.W.Yamauchi,P.E. Principal Engineer a.TOTAL b.WITH CURRENT FIRM 32 19 14.FIRM NAME AND LOCATION(City and State) Element Environmental,LLC (Aiea,Hawaii) 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) M.S., Civil/Environmental Engineering,UC Berkeley Registered Professional Engineer,HI-Civil No.9566 B.S., Civil Engineering,University of Hawaii at Manoa Certified Asbestos Inspector, HIASB-2905 Certified Lead Risk Assessor, PB-0117 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) OSHA 40-hour HAZWOPER Training 40-hour Construction Safety Hazard Awareness OSHA 8-hour HAZWOPER Refresher Training Training for Contractors OSHA 30-hour Construction Safety and Health Training Hazardous Waste Site Supervisor Training Maritime Security Awareness Training(MARSEC) Bloodborne Pathogens, First Aid, CPR, and AED Training 18. RELEVANT PROJECTS (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Kaneohe Bay No.2 Wastewater Pump Station Force Main PROFESSIONAL SERVICES CONSTRUCTION Improvements,Kaneohe,Oahu,Hawaii 2017 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Design alternatives analysis for the replacement of the existing 14-inch force main.Alternatives analyzed included a. horizontal directional drilling, pilot tube microtunneling, and open-cut trenching the new alignment across an existing waterway. Completed design drawings and specifications for the selected alternative, horizontal directional drilling. Prepared the Engineering Design Alternatives Report, completed design calculations for the pumps and force main design, prepared design drawings and specifications, and other necessary permit documents. Fee: $520,000. Role: Project Manager/Principal Engineer. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Reconstruction/Replacement of Sewers, Ho'omaluhia Botanical PROFESSIONAL SERVICES CONSTRUCTION) Gardens,Kaneohe,Oahu,Hawaii Estimated 2024 Estimated 2024 (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm E2 completed planning, design, and preparation of construction documents for the reconstruction/replacement of b. existing sewer lines. Phase I included the cleaning and CCTV inspections in accordance with the Pipeline Assessment Certification Program. Phase II assessed the sewer line deficiencies from the CCTV data, developed rehabilitation/replacement alternatives for the system, prepared schematic and concept drawings for the recommended alternatives, and prepared a cost estimate for the recommended improvements. E2 will prepare construction documents for Phase III. Fee: $840,000. Role: Program Mana er/Principal Engineer. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Sewer Condition Analysis Dieldrin Study,Oahu,Hawaii PROFESSIONAL SERVICES CONSTRUCTION Ongoing N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm c. E2 is conducting sewer condition evaluations, developing wastewater, surface water, solids and soil sampling and testing plans, collecting and analyzing samples, performing analysis of data, and reporting on the results. E2 is developing recommendations for sewer improvements, identifying priority sewers for reduction of infiltration and inflow, developing reports to address State and Federal permit requirements, and assisting with the scoping of wastewater capital improvement projects. Fee: $339,517. Role: Program/Manager/Principal Engineer. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Surveying Small-Scale Waste to Energy Conversion Opportunity PROFESSIONAL SERVICES CONSTRUCTION(If Considering Strategic DoD Locations in Hawaii,Hawaii 2023 apNcable) N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm d. E2 gathered non-hazardous solid waste data from various installations and evaluated the waste composition to determine the amount of feedstock that could be used in a Small-Scale WTE unit. Costs were compared to the projected cost avoidance of landfill tipping fees due to solid waste reduction. Recommendations made for further evaluation of DoD facilities that generate enough waste to support small-scale WTE technologies and where costs were close to or under the estimated cost avoidance. Fee: $102K. Role: Principal Engineer. ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 2 E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY 11.NAME 12.ROLE IN THIS CONTRACT 13.YEARS EXPERIENCE Roger C.Aoki,P.E. Senior Environmental Engineer a.TOTAL b.WITH CURRENT FIRM 28 18 14.FIRM NAME AND LOCATION(City and State) Element Environmental,LLC (Aiea,Hawaii) 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) M.S., Civil/Environmental Engineering, Purdue University Registered Professional Engineer,HI -Civil No. 10019 B.S., Civil Engineering,University of Hawaii at Manoa 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) OSHA 40-hour HAZWOPER Training 40-hour Construction Safety Hazard Awareness Training OSHA 8-hour HAZWOPER Refresher Training for Contractors OSHA 30-hour Construction Safety and Health Training Hazardous Waste Site Supervisor Training Confined Space Training Bloodborne Pathogens, First Aid, CPR, and AED Training 18. RELEVANT PROJECTS (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Site Investigation for Abandoned AVGAS/MOGAS Pipeline,Pearl City PROFESSIONAL SERVICES CONSTRUCTION Peninsula,Joint Base Pearl Harbor-Hickam (JBPHH),Oahu,Hawaii 2016 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm E2 conducted a Site Investigation (SI) for the abandoned aviation gasoline (AVGAS) and motor gasoline (MOGAS) a. pipeline running from the former Pearl City Fuel Annex to the waterfront fueling and cargo wharves on Pearl City Peninsula within JBPHH. The objectives of the project were to delineate and characterize the nature and extent of contamination in the soil, groundwater, and soil gas caused by historic releases of AVGAS/MOGAS; to conduct an environmental hazard evaluation; and to provide a basis for developing effective remedial measures and response actions for the area. Fee: $375,000.Role: Project Manager/Senior Environmental Engineer. (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Stormwater Drainage System Survey,JBPHH,and Outlying Areas, PROFESSIONAL SERVICES CONSTRUCTION Oahu,Hawaii 2016 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm b. E2 created an integrated, scaled, and detailed stormwater drainage map and database for all areas of JBPHH. The maps and results of the survey was used to determine areas in need of repairs or cleaning. The project included a survey and condition assessment of all stormwater drain features; and in specified situations, sediment sampling and analysis, to create a detailed base-wide stormwater drainage map and database. Fee: $1,799,119. Role: Project Manager. (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Feasibility Study,Proposed Plan,and Record of Decision for the Open PROFESSIONAL SERVICES CONSTRUCTION Area Near Building 992,Pearl City Peninsula,JBPHH, Oahu,Hawaii 2016 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm E2 conducted a Feasibility Study (FS), Proposed Plan (PP) and Record of Decision (ROD) that would lead to long- term management of the site to control the exposure of contaminants. While scoping the FS, E2 was able to c. facilitate discussions between the Navy and the regulators, the U.S. Environmental Protection Agency (EPA) Region IX and the State of Hawaii, Department of Health (DOH) Hazard Evaluation and Emergency Response (HEER) Office; to obtain Site closure with No Further Action (NFA). E2 developed the PP and ROD decision documents, as required by the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), to close the Open Area Near Building 992. The project also included procuring the venue, running announcements in the newspaper, and preparing the presentation for the public meeting presenting the PP to the public. Fee: $174,256. Role: Project Manager/Senior Environmental Engineer. (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Kalewa Wastewater Pump Station Improvements Design PROFESSIONAL SERVICES CONSTRUCTION Honolulu, Oahu,Hawaii 2018 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm E2 completed an engineering design of a new packaged wastewater pump station and new dual relief force main d for the Kalewa Street wastewater pump station. Evaluated present and future wastewater flows from the tributary, sized and selected the new packaged pump station,and completed construction documents for the new packaged wastewater pump station and new dual relief force main. Integral to the design was planning the phasing of construction, which would allow continued and uninterrupted use of the airport facilities by the tenants during construction. Fee: $52,000. Role: Senior Environmental Engineer. ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025—PAGE 3 E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY 11.NAME 12.ROLE IN THIS CONTRACT 13.YEARS EXPERIENCE Matthew J. Neal Senior Environmental Scientist a.TOTAL b.WITH CURRENT FIRM 26 18 14.FIRM NAME AND LOCATION(City and State) Element Environmental,LLC (Aiea,Hawaii) 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) B.S., Environmental Science/Geology,Willamette N/A University 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) OSHA 40-hour HAZWOPER Training 40-hour Construction Safety Hazard Awareness Training OSHA 8-hour HAZWOPER Refresher Training for Contractors OSHA 30-hour Construction Safety and Health Training Hazardous Waste Site Supervisor Training Maritime Security Awareness Training(MARSEC) Confined Space Training Bloodborne Pathogens, First Aid, CPR, and AED Training 18. RELEVANT PROJECTS (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Site Investigation of Former Underground Storage Tank(UST) No. 10 PROFESSIONAL SERVICES CONSTRUCTION Site,Pearl Harbor Naval Shipyard (PHNSY),JBPHH,Oahu,Hawaii Ongoing N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm E2 conducted an environmental investigation of a former UST site (Site No. 10) to determine the extent of a. petroleum contamination in subsurface soil and groundwater. The project involved collection of subsurface soil samples, installation of four groundwater monitoring wells,and collection of groundwater samples for laboratory analysis. It also includes semi-annual groundwater monitoring for three seasonal events. Responsibilities included project management, oversight of field activities, and report preparation. Fee: $226,117. Role: Project Manager/Health and Safety Manager. (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Site Investigation,Former Molokai Electric Company Power PROFESSIONAL SERVICES CONSTRUCTION Generating Station,Kaunakakai,Molokai,Hawaii 2016-2018 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm E2 completed a comprehensive study of residual near and subsurface contamination from previous MOECO b. activities, primarily from polychlorinated biphenyls (PCBs) petroleum and heavy metals. E2 collected over 700 discrete soil samples and 88 Multi Increment® (MI) soil, soil-gas, concrete and groundwater samples. Conducted a synoptic water level study in order to help determine potential migration of subsurface contaminants. Prior to completion of the field portion of the project, E2 completed two Special Management Area (SMA) permit applications. Results of the SI were used to determine the most appropriate remedial action for the site. Fee: $830,974. Role: Project Manager/Senior Environmental Scientist/Health and Safety Manager. (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Remedial Action of Former LORAN Station Kure Atoll,Green Island, PROFESSIONAL SERVICES CONSTRUCTION Kure Atoll,Northwest Hawaiian Islands,Hawaii 2017 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm E2 excavated and constructed a new landfill on Green Island, excavated over 400 cubic yards of PCB- C. contaminated soil from the dump and relocated to the new landfill. PCB-contaminated soil was treated with a bio-amendment and encapsulated in activated carbon-containing geosynthetic material prior to being capped with clean fill. Facilitated a pilot-scale study of the bio-amendment with the University of Maryland/Baltimore County prior to field effort to determine the potential effectiveness. Fee: $1.6M. Role: Project Manager/Senior Environmental Scientist. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Dredged Material Evaluation for Dredging of the Ala Wai Canal, PROFESSIONAL SERVICES CONSTRUCTION Honolulu,Oahu,Hawaii 2017 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Conducted a dredged material evaluation of sediments proposed for maintenance dredging from the Ala Wai d Canal.The project involved performing the following tasks: 1) preparation of a Work Plan/Sampling and Analysis Plan that was submitted to and approved by U.S. EPA Region 9; 2) collection and analysis of sediment samples from the canal for chemistry and bioassay testing for ocean disposal of sediments; and 3) preparation of a Sampling and Analysis Report that was submitted to and approved by U.S. EPA Region 9. Fee: $443,257. Role: Senior Environmental Scientist/Health and Safety Manager. ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025—PAGE 4 E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY 11.NAME 12.TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED Arlene H. Campbell, L.G. Senior Geologist a.TOTAL b.WITH CURRENT FIRM 35 18 14.FIRM NAME AND LOCATION(City and State) Element Environmental,LLC,Aiea,Hawaii 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) Graduate Work,Vanderbilt University Licensed Geologist,Washington-No. 1664 B.A., Geology, Minor Hydrology,Austin Peay University 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) OSHA 40-hour HAZWOPER Training 40-hour Construction Safety Hazard Awareness Training OSHA 8-hour HAZWOPER Refresher Training for Contractors OSHA 30-hour Construction Safety and Health Training Hazardous Waste Site Supervisor Training Maritime Security Awareness Training(MARSEC) Bloodborne Pathogens, First Aid, CPR, and AED Training Confined Space Training 18. RELEVANT PROJECTS (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Environmental Assessments,Technical Studies,SMA Use Permit PROFESSIONAL SERVICES CONSTRUCTION Kawailoa Transfer Station,Hawaii&EA/TS for Leeward Baseyard 2020 N/A and Convenience Center Improvements,Hawaii (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm E2 provided planning and permitting services to obtain government permission for the development of a. multiple properties located across Oahu, Hawaii.The development of the sites required permits and approvals from the City and County of Honolulu (CCH), Department of Planning and Permitting, including Environmental Assessments for two project sites and the preparation of a Special Management Area use permit application for the CCH Department of Environmental Services, Refuse Division. In addition, E2 prepared a Hydrogeological Survey for the Leeward Baseyard and Convenience Center Improvements. Fee: $825,893. Role: Senior Geologist. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Environmental Site Assessments,Kapalama Container Terminal PROFESSIONAL SERVICES CONSTRUCTION Yard Project,Honolulu Harbor,Oahu,Hawaii 2015 2024 (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Characterized the site to provide consistent and effective management practices and to mitigate potential b. human health and environmental hazards associated with direct exposure to contaminants of potential concern in soil, groundwater, concrete, sediment, and soil gas during proposed construction/dredging activities required for the redevelopment of the site as a container terminal yard. Identified historic land use, reviewed previous construction and environmental work, project design and planning, environmental sampling, data management and evaluation, and report preparation. Fee: $500,000. Role: Senior Geologist. *2023 ACECH ENGINEERING EXCELLENCE AWARD* (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Environmental Conditions of Property,Various Sites,Guam PROFESSIONAL SERVICES CONSTRUCTION 2022 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm C. Gathered and analyzed data and information to classify the property into several ECP types. Reviewed historical records, identified historic land use associated with hazardous materials and wastes, and reviewed regulatory files, environmental reports, and permits, conducted a visual site inspection, oversaw data management and evaluation, report prepared. Fee: $256,062. Role: Project Manager/Senior Geologist. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Preparation of Applications for WQC 401 and 404,Kalaeloa Barbers PROFESSIONAL SERVICES CONSTRUCTION Point Harbor,Oahu,Hawaii 2012 N/A d (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm Prepared the Section 401 WQC application that described the project, existing environment, and potential environmental effects, chemical and biological, from proposed activities and included information regarding the owner, general contractor, project site, and receiving state water. Fee: $23,822. Role: Project Manager/Senior Geologist. ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 5 E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY 11.NAME 12.TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED Steven R. Spengler,Ph.D. Senior Hydrologist/Hydrogeologist a.TOTAL b.WITH CURRENT FIRM 36 18 14.FIRM NAME AND LOCATION(City and State) Element Environmental,LLC,Aiea,Hawaii 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) Ph.D., Hydrogeology, University of Hawaii at Manoa M.S., Geology,University of Hawaii at Manoa B.S., Geochemistry,UC Santa Cruz B.S., Chemistry, UC Riverside 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) OSHA 40-hour HAZWOPER Training 40-hour Construction Safety Hazard Awareness Training OSHA 8-hour HAZWOPER Refresher Training for Contractors OSHA 30-hour Construction Safety and Health Training Hazardous Waste Site Supervisor Training Confined Space Training Bloodborne Pathogens, First Aid, CPR, and AED Training 18. RELEVANT PROJECTS (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Hydrogeologic Study to Detect Impact of MILCON P-184 Reject PROFESSIONAL SERVICES CONSTRUCTION Water,Diego Garcia,British Indian Ocean Territory 2016 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm E2 conducted a hydrogeologic study to evaluate the potential impacts to the water supply aquifer in the Cantonment Area on Diego Garcia resulting from the disposal of reject water created by the recently constructed nanofiltration water treatment plant. A temporary injection well was installed roughly 100 feet a. south of the nanofiltration plant recharge field. A network of 35 nested piezometers was installed in the vicinity of the temporary injection point and a nine-hour duration injection test was conducted using brackish water spiked with a bromide tracer.The monitoring data collected during this injection test along with a pump test conducted on a nearby water supply well was used to calibrate 2D/3D density dependent groundwater models (SEAWAT) that were used to evaluate the potential for the injected concentrate from the nanofiltration plant to impact the water quality in the nearby water supply wells located inland of the recharge field within the Cantonment Area. Fee: $476,304. Role: Project Manager/Senior Hydrogeologist. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Density Dependent Modeling,Monitoring,Hydrogeologic Modeling, PROFESSIONAL SERVICES CONSTRUCTION and Capture Zone Modeling of Ewa Shaft,Oahu,Hawaii 2020 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm b. E2 provided modeling study to delineate the capture zones over different periods associated with future proposed usage of Ewa Shaft. Services included Density Dependent Modeling, Monitoring, Capture Zone Modeling, and Hydrogeological Modeling. Provided a"Water Quality Monitoring and Capture Zone Analysis for the Ewa Shaft" Report that included a Water Quality Study, Seepage Run Results, a Pump Test Numerical Model, and a Regional Numerical Model. Fee: $109K.Role: Senior Hydrogeologist. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Sewer Condition Analysis Dieldrin Study, Oahu,Hawaii PROFESSIONAL SERVICES CONSTRUCTION Ongoing N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm c. E2 is conducting sewer condition evaluations, developing wastewater, surface water, solids and soil sampling and testing plans, collecting and analyzing samples, performing analysis of data, and reporting on the results. E2 is developing recommendations for sewer improvements, identify priority sewers for reduction of infiltration and inflow, developing reports to address State and Federal permit requirements, and assisting with the scoping of wastewater capital improvement projects. Fee: $539,517. Role: Senior Hydrologist. ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 6 E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY 11.NAME 12.TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED Eric M. Lau,P.E. Senior Environmental Engineer a.TOTAL b.WITH CURRENT FIRM 20 15 14.FIRM NAME AND LOCATION(City and State) Element Environmental,LLC,Aiea,Hawaii 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) M.S.,Civil/Environmental Engineering, MIT Registered Professional Engineer,HI-Civil No. 12977 B.S., Civil and Environmental Engineering, MIT Certified Asbestos Inspector, HIASB-3198 B.S., Biology, MIT Certified Lead Risk Assessor, PB-0439 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) OSHA 40-hour HAZWOPER Training 40-hour Construction Safety Hazard Awareness Training OSHA 8-hour HAZWOPER Refresher Training for Contractors OSHA 30-hour Construction Safety and Health Hazardous Waste Site Supervisor Training Training Bloodborne Pathogens, First Aid, CPR, and AED Training Confined Space Training 18. RELEVANT PROJECTS (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Non-Domestic Wastewater Management Plan,JBPHH,Oahu,Hawaii PROFESSIONAL SERVICES CONSTRUCTION Ongoing N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm E2 evaluated NAVFAC Hawaii's 8,000+ facilities to identify, characterize, and quantify non-domestic wastewater discharges to the sanitary sewer system tributary to the NAVFAC Hawaii Wastewater Treatment a. Plant(WWTP). Coordinated site visits to and conducted interviews with facility managers of over 750 facilities. The inventory of non-domestic wastewater sources collected in this study will be used to determine additional non-domestic discharges that should be internally permitted and regulated.The project also includes quarterly wastewater sampling efforts to collect both grab and 24-hour composite samples from WWTP influent locations on the Hickam Field flight line and Pearl Harbor, as well as effluent samples from the WWTP. Fee: $1,154,918. Role:Assistant Project Manager/Senior Environmental Engineer. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Navy Spill Prevention Control and Countermeasure Plan Update, PROFESSIONAL SERVICES CONSTRUCTION JBPHH,Oahu,Hawaii 2023 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm b. E2 completed an update of the Navy SPCC Plan in accordance with 40 CFR 112 regulating ASTs storing petroleum and cooking oil products. E2 inspected 521 ASTs and bulk oil storage areas at all Naval installations on Oahu.Worked closely with NAVFAC personnel to update the inventory, condition, and management of Navy ASTs and subsequently generated an updated SPCC Plan. Developed AST inspection forms and maintained a database of AST inspection data collected. Fee: $487,580.Role: Senior Environmental Engineer. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Waianae Agricultural Park Improvements,Waianae,Oahu,Hawaii PROFESSIONAL SERVICES CONSTRUCTION 2017 2018 (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Completed the design of miscellaneous improvements to the drainage system at the Waianae Agricultural Park. c' The improvements included slope stabilization of drainage ways, diversion of runoff into an infiltration basin, design of overflow protection drainage intakes for the infiltration basin, and repairs to existing concrete drainage swales. Responsible for preparation of construction documents (i.e., plans and specifications) and services during bidding and construction. The construction plans were completed on an accelerated schedule to meet the funding requirements for construction. Fee: $60,000. Role: Senior Environmental Engineer. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Reservoirs 155 and 255 Capacity Study,Kunia,Oahu,Hawaii PROFESSIONAL SERVICES CONSTRUCTION 2010 N/A d. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Conducted a study concerning the repair, maintenance, and capacity options for Reservoirs 155 and 225 of the Waiahole Ditch Irrigation System for the Agribusiness Development Corporation. Fee: $30,000. Role: Senior Environmental Engineer. ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 7 E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY 11.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE Bernice M. Balete,P.E. Senior Environmental Engineer a.TOTAL b.WITH CURRENT FIRM 30 14 14.FIRM NAME AND LOCATION(City and State) Element Environmental,LLC (Aiea,Hawaii) 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) B.S., Civil Engineering,University of Hawaii at Registered Professional Engineer,HI -Civil No. 10186 Manoa Certified Asbestos Project Designer/Inspector, HIASB-0449 Certified Lead Project Designer/Risk Assessor, PB-0449 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) OSHA 40-hour HAZWOPER Training 40-hour Construction Safety Hazard Awareness Training for OSHA 8-hour HAZWOPER Refresher Training Contractors OSHA 30-hour Construction Safety and Health Hazardous Waste Site Supervisor Training Training DOT Hazardous Materials 49 CFR 172 Subpart H Maritime Security Awareness Training(MARSEC) Bloodborne Pathogens, First Aid, CPR, and AED Training Confined Space Training 19. RELEVANT PROJECTS (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Hazardous Material Survey/Environmental Permitting for PROFESSIONAL CONSTRUCTION SERVICES N/A Rehabilitation of Numana Road Bridge 129,Honolulu,Oahu,Hawaii 2017 (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm a. E2 performed site inspections to evaluate the existing conditions of the site at the time during rehabilitation work for the City and County of Honolulu, Numana Road Bridge No. 129 project. E2 preliminary design phase documents included recommendations of findings of Hazardous Materials and determined environmental permits required to complete the project.Role: Project Manager/Senior Environmental Engineer. (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Hazardous Materials Building Survey,Beretania Engineering PROFESSIONAL CONSTRUCTION SERVICES Building for HVAC Replacement,Honolulu,Oahu,Hawaii 2020 N/A b. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm E2 conducted a hazardous material survey for asbestos-containing materials and lead paint for the BWS. E2 also included summary data tables, sample location figures, sample photographs, and analytical laboratory reports. Role: Project Manager/Senior Environmental Engineer. (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Hazardous Materials Building Survey, Old Scale House Structure at PROFESSIONAL CONSTRUCTION SERVICES Kapaa Transfer Station,Kailua, Oahu,Hawaii 2020 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm E2 conducted a Hazardous Materials survey for CCH at an old scale house located at Kapaa Transfer Station, c. Kailua, Oahu, Hawaii. An asbestos survey, lead survey, arsenic survey, and a visual site inspection were conducted. E2-certified inspectors collected bulk samples which were analyzed by an accredited laboratory. E2 provided a technical letter report with the purpose of the project, building materials, sampling methodology, sample results with data tables, locations of samples taken, a close-up and panoramic time- stamped photograph of each sample, and quantities of findings for the surveys. Role: Project Manager/Senior Environmental Engineer. (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Kawela 228 Reservoir,Kapolei 215 Reservoir,and Wahiawa 1361 PROFESSIONAL CONSTRUCTION SERVICES N/A Reservoirs No. 1 &2 Facility Repair and Repainting, Oahu,Hawaii 2017 (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm d. Conducted asbestos and lead paint surveys at the Kailua Heights and Waimanalo Booster Pump Stations, prepared letter reports documenting sampling and results, prepared specifications for addressing the handling and disposal of hazardous materials during demolition/construction. E2 also prepared NPDES Permit Applications for the Kapolei and Kawela Reservoirs project sites. Fee: $28,570. Role: Project Manager/Senior Environmental Engineer. ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 8 E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY 11.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE Marvin D. Heskett, III Senior Chemist a.TOTAL b.WITH CURRENT FIRM 35 10 14.FIRM NAME AND LOCATION(City and State) Element Environmental,LLC (Aiea,Hawaii) 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) B.S., Biochemistry, California Polytechnic University Certified Asbestos Inspector, HIASB-4631 Certified Lead Risk Assessor, PB-1150 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) OSHA 40-hour HAZWOPER Training Sampling for Defensible Environmental Decisions, Basic OSHA 8-hour HAZWOPER Refresher Training and Advanced OSHA 30-hour Construction Safety and Health Training Confined Space Training Shipley Group NEPA Training Hazardous Waste Site Supervisor Training Advanced Systems QA/QC 40-hour Course Maritime Security Awareness Training(MARSEC) E3 Data Quality Objective Bloodborne Pathogens, First Aid, CPR, and AED Training 18. RELEVANT PROJECTS (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Preconstruction Activities for the Applicable Monitoring and PROFESSIONAL SERVICES CONSTRUCTION Assessment Plan for the Honolulu Rail Transit Project,Waiawa 2019 N/A Tributary and Waiawa Stream,WQC0789, Pearl City,Oahu,Hawaii 8 (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm E2 completed preconstruction monitoring in compliance with an AMAP for construction within the U.S. waterway of Waiawa Stream, prior to the construction of a concrete pier within the high-water mark. E2 conducted three phases of stream monitoring to ensure construction did not impact stream water quality. Fee: $70,000 (per year). Role: Senior Chemist. (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Sewer Condition Analysis Dieldrin Study,Oahu,Hawaii PROFESSIONAL SERVICES CONSTRUCTION Ongoing N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm b. E2 is conducting sewer condition evaluations, developing wastewater, surface water, solids and soil sampling and testing plans, collecting and analyzing samples, performing analysis of data, and reporting on the results. E2 is developing recommendations for sewer improvements, identify priority sewers for reduction of infiltration and inflow, developing reports to address State and Federal permit requirements, and assisting with the scoping of wastewater capital improvement projects. Fee: $539,517. Role: Senior Chemist. (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Water Quality Monitoring,Rip-Rap Repair and Floating Dock,USCG PROFESSIONAL SERVICES CONSTRUCTION Station,Nawiliwili Small Boat Harbor,Lihue,Kauai,Hawaii 2016 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm E2 completed an Applicable Monitoring and Assessment Plan (AMAP) to monitor impacts on harbor water C. quality from a U.S. Coast Guard in-water construction project. E2 created a work plan, established baseline conditions by monitoring water quality parameters before construction, monitored water quality from a vessel in and around the construction project, assessed the final water quality post construction, and generated a final report. The project lasted a total of five weeks and ended with a comprehensive letter report and recommendations. Fee: $60,000. Role: Assistant Project Manager/Senior Chemist. (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Storm Water Management Plan Update for Commander Navy Region PROFESSIONAL SERVICES CONSTRUCTION Hawaii,JBPHH,Oahu,Hawaii Ongoing N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm E2 completed inspections and updated the SWMP for CNRH under their NPDES permit. The SWMP contained d. several program components including public education and outreach, illicit discharge detection and elimination, construction site runoff control, post-construction stormwater management, pollution prevention and good housekeeping, stormwater monitoring, and reporting. Developed Storm Water Pollution Control Plans for 68 Navy industrial facilities. Provided gap analysis of previous/new permit requirements. Fee: $452K. Role: Senior Chemist. ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025—PAGE 9 E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY 11.NAME 12.TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED Candace K.Yamauchi, P.E. Senior Environmental Engineer a.TOTAL b.WITH CURRENT FIRM 19 13 14.FIRM NAME AND LOCATION(City and State) Element Environmental,LLC,Aiea,Hawaii 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) B.S.,Earth and Environmental Engineering, Columbia Registered Professional Engineer,HI - Civil No. 16320 University Certified Asbestos Inspector, HIASB-3840 Certified Lead Risk Assessor, PB-1135 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) OSHA 40-hour HAZWOPER Training 40-hour Construction Safety Hazard Awareness Training OSHA 8-hour HAZWOPER Refresher Training for Contractors OSHA 30-hour Construction Safety and Health Confined Space Training Training Hazardous Waste Site Supervisor Training Qualified Stormwater Compliance Manager Bloodborne Pathogens, First Aid, CPR, and AED Training 18. RELEVANT PROJECTS (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Illicit Discharge Survey,Commander Navy Region Hawaii,JBPHH, PROFESSIONAL SERVICES CONSTRUCTION Oahu,Hawaii 2016 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm a. Completed an illicit discharge survey for non-stormwater discharges to the CNRH's municipal separate storm sewer system (MS4) and waters of the U.S. in accordance with the NPDES permit issued. Inspected over 1,300 facilities, developed recommendations for possible corrections, and prepared the associated preliminary cost estimates. Fee: $393,019. Role: Senior Environmental Engineer. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Waianae Agricultural Park Improvements,Waianae,Oahu,Hawaii PROFESSIONAL SERVICES CONSTRUCTION 2017 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Completed the design of miscellaneous improvements to the drainage system at the Waianae Agricultural b Park. The improvements included slope stabilization of drainage ways, diversion of runoff into an infiltration basin, design of overflow protection drainage intakes for the infiltration basin, and repairs to existing concrete drainage swales. Responsible for preparation of construction documents (i.e., plans and specifications) and services during bidding and construction. The construction plans were completed on an accelerated schedule to meet the funding requirements for construction. Fee: $60,000. Role: Senior Environmental Engineer. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Waimanalo Wastewater Treatment Plant Effluent Reuse Feasibility PROFESSIONAL SERVICES CONSTRUCTION Study,Waimanalo,Oahu,Hawaii 2014 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Conducted a study to assess the technical, environmental, and economic feasibility of wastewater effluent C. reuse from the Waimanalo Wastewater Treatment Plant. Responsible for the identification of potential users and locations, including the reuse demand, and transmission and storage requirements.Tasks included public outreach, data collection, research of prior studies, and evaluation of costs. Prepared a conceptual layout and cost estimate for the preferred WWTP upgrades and transmission and storage requirements for users with strong interest in reuse. Fee: $219,345. Role: Senior Environmental Engineer. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Navy Region Hawaii Stormwater Management Plan,JBPHH,Oahu, PROFESSIONAL SERVICES CONSTRUCTION Hawaii 2016 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm 2 prepared a SWMP for Navy Region Hawaii in accordance with their NPDES permit. The SWMP contained d. several program components including public education and outreach; illicit discharge detection and elimination; construction site runoff control; post-construction stormwater management; P2 and good housekeeping; stormwater monitoring; and reporting. Developed Stormwater Pollution Control Plans (SWPCPs) for 25 industrial facilities. Responsibilities included conducting facility inspections and interviews, coordination with client and facility managers, and preparing the document for submittal. Fee: $291,000. Role: Environmental Engineer. ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 10 E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY 11.NAME 12.TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED Lindsay B. Mason,P.E. Senior Environmental Engineer a.TOTAL b.WITH CURRENT FIRM 22 15 14.FIRM NAME AND LOCATION(City and State) Element Environmental,LLC,Aiea,Hawaii 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) B.S.,Environmental Engineering, Michigan Professional Engineer,MI -No. 6201059411 Technological University 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) OSHA Initial HAZWOPER Training, 40-HR 40-hour Construction Safety Hazard Awareness Training OSHA Refresher Training, 8-HR for Contractors RCRA S30 Certification-Hazardous/Toxic Materials Hazardous Waste Site Supervisor Training Management DOT HM-181 Hazardous Materials Training Bloodborne Pathogens, First Aid, CPR, and AED Training 18. RELEVANT PROJECTS (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Master Plan for Marine Corps Base Hawaii Sanitary Landfill,Kaneohe, PROFESSIONAL SERVICES CONSTRUCTION Oahu,Hawaii 2017 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Prepared the Master Plan for the Marine Corps Base (MCB) Hawaii Landfill to fulfill the requirements of their a. Solid Waste Management Permit. The Master Plan is comprised of three parts: the Landfill Implementation Plan (LIP), the Operations Plan, and the Closure/Post-Closure Plan. The LIP involves evaluating the Final Grading Plan and making revisions as needed, providing a 20-year fill sequencing plan, and Basis of Design (BOD). The Operations Plan has been written to help facilitate the MCB Hawaii Landfill staff to comply with the Landfill's current permit and to operate efficiently. The Closure/Post-Closure Plans details landfill closure procedures in accordance with State and Federal regulations. Fee: $143,975. Role: Senior Environmental Engineer. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Landfill Optimization Study for Marine Corps Base Hawaii,Kaneohe, PROFESSIONAL SERVICES CONSTRUCTION Oahu,Hawaii 2017 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm E2 prepared a Landfill Optimization Study (LOS) for the Marine Corps Base (MCB) Hawaii to evaluate their MCB Hawaii Sanitary Landfill. The purpose of the LOS was to: (1) evaluate landfill operations, equipment b' requirements, and personnel and to make recommendations as to how the overall operations of the landfill can be optimized; (2) conduct a waste evaluation study to evaluate and optimize waste pickups on base and (3) conduct an alternatives assessment that evaluated keeping the landfill open and operating as is, keeping the landfill open and implementing the LOS recommendations, and closure of the landfill. A detailed cost analysis was conducted for each of the alternatives and E2 provided recommendations to the MCB Hawaii based on the findings of the study. Fee: $149,025.Role: Assistant Project Manager/Senior Environmental Engineer. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Landfill Consulting Services for Two Closed Landfills PROFESSIONAL SERVICES CONSTRUCTION Island of Hawaii,Hawaii 2016 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm E2 provided various consulting services at two closed landfills,including performing a geophysical survey, infra- red photography, and mapping to determine landfill boundaries and fire characterization, and preparing a d. landfill fire management plan. Prepared a landfill alternative plan to evaluate fire control/extinction, waste mining, and other alternatives. Assisted with an U.S. Environmental Protection Agency (EPA)-supported fire control pilot test to evaluate the efficacy of using waste excavation and the application of foam/water as a method to extinguish fire in landfill hot spots. Tasks included quarterly monitoring of landfill gas and subsurface fire conditions, preparation of quarterly and annual monitoring reports, and periodic fire management activities (i.e., carbon dioxide [CO2] injection, landfill cover maintenance, and landfill fire response, etc.). Fee: $389,000. Role: Senior Environmental Engineer. ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 11 E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY 11.NAME 12.TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED Angela K. Peltier Senior Geologist a.TOTAL b.WITH CURRENT FIRM 20 18 14.FIRM NAME AND LOCATION(City and State) Element Environmental,LLC,Aiea,Hawaii 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) B.S., Geology and Geophysics,University of Hawaii at Manoa 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) OSHA Initial HAZWOPER Training,40-HR ASTM E1527 Standard Practice for Environmental Site Assessment: OSHA Refresher Training, 8-HR Phase I Environmental Site Assessment Process Certification 40-hour Construction Safety Hazard First Aid,and CPR Training Awareness Training for Contractors 18. RELEVANT PROJECTS (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Phase I Environmental Site Assessment,Mauna Kapu Station, PROFESSIONAL SERVICES CONSTRUCTION Waianae Mountain Range,Waianae, Oahu,Hawaii 2021 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm Completed a Phase I Environmental Site Assessment (ESA) for the 1.113-acre Mauna Kapu Station located near a. the southern ridgeline of the Waianae Mountain Range. Performed in general conformance with ASTM E1527- 21, Standard Practice for ESAs. Researched the current and historical site uses and completed a visual site inspection to assess if current or historical property uses have impacted the soil or groundwater beneath the property that could pose a threat to human health and/or the environment. Several potential sources of soil and groundwater contamination associated with historical sites were identified. Fee: $41,239.Role: Geologist. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Phase I Environmental Site Assessment,Waiawa,Oahu,Hawaii PROFESSIONAL SERVICES CONSTRUCTION 2016 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm Completed a Phase I ESA as part of due diligence to support the acquisition of easements on non-Department of Defense (DoD) land, required for replacement of the U.S. Navy's Waiawa Water Transmission Main. Reviewed b. literature and agency records and previous landowners, interviewed individuals who might have knowledge of current or past operations, and conducted a visual site inspection of each property. Identified and researched over 99 subject and adjacent property parcels, generated site drawings on AutoCAD, researched and requested information regarding current and historic land use and ownership, identified and request regulatory files, environmental reports, and permits, interviewed property owners and government agency representatives, data management and evaluation,and report preparation. Fee: $105,181. Role: Geologist. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Environmental Assessments,Technical Studies,Permitting,Two Sites PROFESSIONAL SERVICES CONSTRUCTION on Oahu,Hawaii 2020 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm Site 1: Environmental Assessment and Technical Studies, Leeward Base Yard and Convenience Center Improvements,James Campbell Industrial Park,Kapolei,Hawaii Site 2: Environmental Assessment, Technical Studies, SMA Use Permit, Kawailoa Transfer Station, Oahu, c. Hawaii E2 provided planning and permitting services as a subcontractor to G70 to obtain government permission for development of multiple properties located across Oahu, Hawaii. The development of the sites required permits and approvals from the City and County of Honolulu (CCH), Department of Planning and Permitting, including Environmental Assessments for two project sites and the preparation of a Special Management Area use permit application for the CCH Department of Environmental Services, Refuse Division. In addition, E2 prepared a Hydrogeological Survey for Site 1. Fee: $825,894. Role: Senior Geologist. ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 12 E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY 11.NAME 12.TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED Jodie C.A. Tsubone,P.E. Civil Engineer a.TOTAL b.WITH CURRENT FIRM 12 9 14.FIRM NAME AND LOCATION(City and State) Element Environmental,LLC,Aiea, Hawaii 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) B.S., Civil Engineering,University of Hawaii at Manoa Registered Professional Engineer,HI-Civil No. 17048 Certified Asbestos Inspector, HIASB-4629 Certified Lead Risk Assessor, PB-1151 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) OSHA 40-hour HAZWOPER Training 40-hour Construction Safety Hazard Awareness Training OSHA 8-hour HAZWOPER Refresher Training for Contractors OSHA 30-hour Construction Safety and Health Training Hazardous Waste Site Supervisor Training Maritime Security Awareness Training(MARSEC) Confined Space Training Erosion and Sediment Control Plan Coordinator (ESCP) Bloodborne Pathogens, First Aid, CPR, and AED Training 18. RELEVANT PROJECTS (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Lead in Drinking Water Testing at Priority Areas JBPHH/NCTAMS, PROFESSIONAL SERVICES CONSTRUCTION Wahiawa,Oahu,Hawaii 2020 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm a. E2 conducted drinking water testing for Lead in Priority Areas as part of protective measures in place for children at various schools/childcare facilities on Navy Installations. Conducted 2-step sampling, developed under directives from Navy and EPA guidelines, submitted the samples for laboratory analysis, and prepared notifications. Conducted multiple site visits to each facility to prepare and then to sample over 700 drinking water outlets. Fee: $99,595. Role: Senior Civil Engineer. (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED CCH: Reconstruction/Replacement of Sewers,Ho`omaluhia Botanical PROFESSIONAL SERVICES CONSTRUCTION Gardens,Kaneohe,Oahu,Hawaii Ongoing Est. 2024 (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm E2 completed planning, design, and preparation of construction documents for the reconstruction/replacement b. of existing sewer lines. Phase I included the cleaning and CCTV inspections in accordance with the Pipeline Assessment Certification Program. Phase II assessed the sewer line deficiencies from the CCTV data, developed rehabilitation/replacement alternatives for the system, prepared schematic and concept drawings for the recommended alternatives, and prepared a cost estimate for the recommended improvements. E2 will prepare construction documents for Phase III. Fee: $840,000. Role:Assistant Project Manager/Senior Civil Engineer. (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Ozone-Depleting Substances (ODS) Inventory and Management Plan PROFESSIONAL SERVICES CONSTRUCTION for Naval Air Facility Atsugi (NAFA),Atsugi,Japan Ongoing N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm E2 updated the air source inventory to include all Ozone-Depleting Substances (ODS) containing units regulated c. by the Japan Environmental Governing Standard (JEGS) and air emission sources (except ODS) that are regulated by the JEGS. E2 verified over 2,400 refrigerant and air emission sources at almost 230 facilities (70 facilities were added to the initial scope of work) at the site. E2 prepared an updated air source inventory database and maps of survey results, which were included in a Fieldwork Summary Report. The fieldwork findings were then used to update the ODS Management Plan (title changed to "Refrigerant Management Plan [RMP]") to reflect revisions to applicable regulations. Fee: $198,814. Role: Senior Civil Engineer. (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Pacific Missile Range Facility Biosolids Handling and Disposal Plan PROFESSIONAL SERVICES CONSTRUCTION Kekaha,Kauai,Hawaii 2023 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm E2 conducted a site investigation and sampling at the Pacific Missile Range Facility (PMRF), Kekaha, Kauai, d Hawaii. The study included various components of the wastewater treatment systems throughout the Base,with a focus on the existing wastewater treatment plant (WWTP), individual wastewater system (IWS) facilities, sludge drying beds, and the wastewater oxidation pond (WOP). E2 evaluated the current biosolids handling practices and will develop a long-term plan for the proper treatment and disposal of biosolids at PMRF, including IWS septage,WWTP, and WOP sludge. Fee: $128,895. Role: Senior Civil Engineer. ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025—PAGE 13 E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY 11.NAME 12 TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED Austin A.Lutey,E.I.T. Environmental Engineer a.TOTAL b.WITH CURRENT FIRM 16 16 14.FIRM NAME AND LOCATION(City and State) Element Environmental,LLC,Aiea,Hawaii 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) B.S., Civil and Environmental Engineering, UCLA Engineering-in-Training(E.I.T.) Certified Asbestos Inspector, HIASB-3199 Certified Lead Risk Assessor, PB-0440 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) OSHA 40-hour HAZWOPER Training 40-hour Construction Safety Hazard Awareness Training OSHA 8-hour HAZWOPER Refresher Training for Contractors OSHA 30-hour Construction Safety and Health Training Hazardous Waste Site Supervisor Training Maritime Security Awareness Training(MARSEC) Bloodborne Pathogens, First Aid, CPR, and AED Training Confined Space Training 18. RELEVANT PROJECTS (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Closure Activities and Removal of Under,and In-Ground Structure at PROFESSIONAL SERVICES CONSTRUCTION Former JN Chevrolet Location,Haleiwa,Oahu,Hawaii 2021 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm a. E2 previously completed a Limited Phase II ESA as part of the due diligence process to detect any environmental issues for property acquisition in 2017. Areas of concern were recommended for additional sampling to evaluate the nature and extent of contamination. Fieldwork included discrete soil sampling and groundwater sampling from the UST excavation. Responsibilities for this project included groundwater sampling. Fee: $57,1910.Role: Environmental Engineer. (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Asbestos and Lead Paint Survey for Singapore Area Coordinator, PROFESSIONAL SERVICES CONSTRUCTION Sembawang,Singapore 2024 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm b. E2 conducted an asbestos-containing material (ACM) survey and lead-based paint(LBP) inspection including an LBP risk assessment(LRA) of deteriorated paint and bare soil at unaccompanied housing facilities and lead dust at lodging units in Sembawang, Singapore. Responsibilities included sampling for ACM and LBP, thoroughly documenting all fieldwork activities with notes and photography, and preparing computer aided design (CAD) drawings. Fee: $1,858,355.Role: Environmental Engineer. (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Asbestos Survey,Naval Base Guam PROFESSIONAL SERVICES CONSTRUCTION 2020 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm E2 completed an asbestos survey of 109 buildings with a total survey area of 1,014,904 square feet at NBG for c. the NAVFAC Pacific. E2 prepared a Work Plan and Health and Safety Plan prior to fieldwork. A total of 7,134 bulk samples were collected by a team of 4 inspectors, over four mobilizations within a year. E2 prepared Draft and Final survey reports that included a summary table of findings,plans with approximate locations of samples taken, extent of most homogeneous areas (HAs), a closeup and panoramic photo log of samples, and laboratory reports. Responsibilities included preparation of the WP and HSP, fieldwork coordination, fieldwork, and preparation of the Draft and Final Survey Reports.Fee: $1,065,234.Role: Environmental Engineer. (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Operation and Maintenance and Monitoring for Multiple Sites, PROFESSIONAL SERVICES CONSTRUCTION JBPHH,Oahu,Hawaii 2013-2017 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm E2 completed four years of Operation and Maintenance (O&M) of two oily waste collection and treatment facilities within the PHNSY. E2 has managed hazardous and oily wastes recovered from two product recovery d systems installed at the Building 8 and Oscar 2 Pier former release sites. The Building 8 system includes three Fuel Oil Skimmer System (FOSS) units while the Oscar 2 Pier consists of five FOSS units. E2 conducted weekly, monthly, and quarterly inspections and maintenance in order to keep both product recovery systems up and running efficiently. E2 completed system repairs, oily product gauging of over 100 wells, fuel profile sampling, NPDES compliance sampling, disposal of recovered product, and system trouble-shooting. Fee: $431,080. Role: Environmental Engineer. ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025—PAGE 14 E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY 11.NAME 12.TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED Danny C. Liu Chemical Engineer a.TOTAL b.WITH CURRENT FIRM 36 9 14.FIRM NAME AND LOCATION(City and State) Element Environmental,LLC,Aiea,Hawaii 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) B.S., Chemical Engineering, University of Colorado at Certified Asbestos Inspector, HIASB-4653 Boulder Certified Risk Assessor/Lead Inspector, PB-1136 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) OSHA Initial HAZWOPER Training, 40-HR Hazardous Waste Site Supervisor Training OSHA Refresher Training, 8-HR Bloodborne Pathogens, First Aid, CPR,and AED Training 18. RELEVANT PROJECTS (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Construction Engineering and Inspection for Honolulu Rail PROFESSIONAL SERVICES CONSTRUCTION Transit Project,Honolulu, Oahu,Hawaii 2015-2019 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm Mr. Liu served as an Environmental Compliance Monitor for the West Sector of the Honolulu Rail Transit project that spans from Kapolei to Aloha Stadium. Responsible for monitoring the Contractor's performance of a. environmental monitoring of the Construction Contract, which includes National Pollutant Discharge Elimination System (NPDES) permit compliance, 401 water quality certification compliance, noise permit compliance, air pollution compliance, and solid and hazardous waste compliance. He conducted weekly inspections of the construction sites to assess compliance with required Best Management Practices (BMPs), and mitigation measures required under the Final Environmental Impact Statement (EIS) and the Record of Decision (ROD). Fee: $300,000 (annually).Role: Environmental Compliance Monitor. (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Asbestos and Lead Paint Survey for Singapore Area Coordinator, PROFESSIONAL SERVICES CONSTRUCTION Sembawang,Singapore 2024 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm b. E2 conducted an asbestos-containing material (ACM) survey and lead-based paint (LBP) inspection including an LBP risk assessment (LRA) of deteriorated paint and bare soil at unaccompanied housing facilities and lead dust at lodging units in Sembawang, Singapore. Responsibilities included sampling for ACM and LBP, thoroughly documenting all fieldwork activities with notes and photography, and preparing computer aided design (CAD) drawings. Fee: $1,858,355.Role: Inspector. (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Asbestos Survey,Naval Base Guam, Guam PROFESSIONAL SERVICES CONSTRUCTION 2020 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm E2 completed an asbestos survey of 109 buildings with a total survey area of 1,014,904 square feet at NBG for the c. NAVFAC Pacific. E2 prepared a Work Plan (WP) and Health and Safety Plan (HSP) prior to fieldwork. A total of 7,134 bulk samples were collected by a team of 4 inspectors, over four mobilizations within a year. E2 prepared Draft and Final survey reports that included a summary table of findings, plans with approximate locations of samples taken, extent of most homogeneous areas (HAs), a closeup and panoramic photo log of samples, and laboratory reports. Responsibilities included preparation of the WP and HSP, fieldwork coordination, fieldwork, and preparation the Draft and Final Survey Reports.Fee: $1,065,234.Role: Inspector. (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Illicit Discharge Storm Water Inspections for Commander Navy PROFESSIONAL SERVICES CONSTRUCTION Region Hawaii,Joint Base Pearl Harbor-Hickam,Oahu,Hawaii 2024 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm E2 completed an illicit discharge survey for non-storm water discharges to CNRH municipal separate storm d. sewer (MS4) and waters of the U.S. in accordance with the NPDES permit issued. The project scope includes inspections of over 1,800 sites at Naval installations throughout the island of Oahu. The inspections are to identify any existing or potential sources of illicit discharges at each facility. E2 completed field inspections and prepared a report summarizing the findings. Responsibilities included: conducting inspections, identifying corrective actions, updating the database for submittal, and preparation of conceptual designs and cost estimates for corrective actions.Fee: $365,424. Role: Inspector. ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025—PAGE 15 E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY 11.NAME 12.TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED Katie L.Kilway Project Environmental Scientist a.TOTAL b.WITH CURRENT FIRM 16 13 14.FIRM NAME AND LOCATION(City and State) Element Environmental,LLC,Aiea,Hawaii 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) B.S., Environmental Science, University of Notre Dame 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) OSHA Initial HAZWOPER Training, 40-HR Hazardous Waste Site Supervisor Training OSHA Refresher Training,8-HR Bloodborne Pathogens, First Aid, CPR,and AED Training Construction Safety Hazard Awareness Training for Contractors, 40-HR 18. RELEVANT PROJECTS (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Storm Water Monitoring for Commander Navy Region Hawaii, PROFESSIONAL SERVICES CONSTRUCTION JBPHH,Oahu,Hawaii 2019 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm Conducted stormwater monitoring at over 70 permitted industrial sample locations across the Combined Navy Region Hawaii. Monitoring work was conducted to comply with terms of National Pollutant Discharge Elimination System Permit Number HI S000257 for the Navy's municipal separate storm sewer system (MS4). Samples were analyzed for a large array of constituents ranging from nutrients and heavy metals to herbicides, a. pesticides and volatile organic compounds as determined through a Storm Water Pollution Control Process. Automated and manual sample methods were deployed to collect samples from a wide array of sample locations ranging from sheet flow through grassy swales to combined storm drain inlets. To capture flow from a variety of industrial facilities, E2 designed and had various sheet flow sampling devices fabricated. Stainless-steel v- notched weirs were installed in storm drain inlets to isolate flows from each permitted facility. E2 also designed several sheet flow sampling devices which were fabricated out of stainless-steel ranging from flat pans to portable trench drains. High resolution geographic referenced rain data collected from across CNRH helped the Navy to understand the highly variable nature of rainfall in the region and to better predict stormwater compliance measures. Fee: $448,692. Role: Environmental Scientist. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Spill Prevention Control and Countermeasure Plan Update,JBPHH, PROFESSIONAL SERVICES CONSTRUCTION Oahu,Hawaii Ongoing N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm b. Completed annual SPCC site inspections for the Navy in accordance with oil pollution prevention guidelines (40 CFR 112) for 170 regulating Above Storage Tanks (ASTs) storing petroleum and oil. Project entailed conducting inspections of over 174 ASTs and bulk oil storage areas at NAVFAC Hawaii facilities on Oahu. Worked closely with NAVFAC personnel to update the inventory, management, and evaluation of the condition of Navy ASTs. Fee: $143,381 annually. Role: Environmental Scientist. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Illicit Discharge Storm Water Inspections for Commander Navy PROFESSIONAL SERVICES CONSTRUCTION Region Hawaii,JBPHH,Oahu,Hawaii Ongoing N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm E2 is completing an illicit discharge survey for non-storm water discharges to CNRH municipal separate storm c. sewer (MS4) and waters of the U.S. in accordance with the NPDES permit issued. The project scope includes inspections of over 1,800 sites at Naval installations throughout the island of Oahu. The inspections are to identify any existing or potential sources of illicit discharges at each facility. To date, the field inspections are near 90% complete and a draft report summarizing the findings is being prepared. Responsibilities include conducting inspections, identifying corrective actions, updating the database for submittal, and preparation of conceptual designs and cost estimates for corrective actions. Fee: $656,175. Role: Environmental Scientist. ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 16 E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY 11.NAME 12.TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED Arnold David West Staff Environmental Scientist a.TOTAL b.WITH CURRENT FIRM 7 7 14.FIRM NAME AND LOCATION(City and State) Element Environmental,LLC,Aiea,Hawaii 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) B.S.,Applied Physics,Jacksonville University, Florida Certified Asbestos Inspector, HIASB-4625 Certified Lead Risk Assessor/Inspector, MI P-08520 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) OSHA 40-hour HAZWOPER Training 40-HR Construction Safety Hazardous Awareness Training OSHA 8-hour HAZWOPER Refresher Training for Contractors Bloodborne Pathogens, First Aid, CPR and AED Training 18. RELEVANT PROJECTS (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED County of Maui Construction&Demolition Landfill Waste Profiling, PROFESSIONAL SERVICES CONSTRUCTION Maui,Hawaii Ongoing N/A a. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Prepared and approved waste profiles Construction & Demolition (C &D) at County of Maui Landfills. Fee: $231,260. Role: Staff Environmental Scientist. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Asbestos and Lead Paint Survey for Singapore Area Coordinator, PROFESSIONAL SERVICES CONSTRUCTION Sembawang,Singapore 2024 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm b. E2 conducted an asbestos-containing material (ACM) survey and lead-based paint(LBP) inspection including an LBP risk assessment(LRA) of deteriorated paint and bare soil at unaccompanied housing facilities and lead dust at lodging units in Sembawang, Singapore. Responsibilities included sampling for ACM and LBP, thoroughly documenting all fieldwork activities with notes and photography, and preparing computer aided design (CAD) drawings. Fee: $1,858,355.Role: Inspector. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Asbestos Survey,Commander Fleet Activities Yokosuka,Japan PROFESSIONAL SERVICES CONSTRUCTION 2020 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm c. Conducted an asbestos survey of over 100 buildings with a total area of 2,139,464 square feet and constructed between 1914 and 1970 at CFAY, Japan for the NAVFAC Pacific. E2 prepared a Work Plan (WP) and Health and Safety Plan (HSP) prior to field work. Responsibilities include sampling for asbestos and lead, thoroughly documenting all field work activities with notes and photographs, and preparing report summary tables and computer-aided design (CAD) figures. Fee: $999,976. Role: Staff Environmental Scientist/Inspector. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Asbestos Survey,U.S.Naval Hospital,Yokosuka,Japan PROFESSIONAL SERVICES CONSTRUCTION 2020 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Conducted asbestos surveys of U.S. Navy Hospital Buildings 1400 (the Hospital) and Building 3201 d. (Management Information) for the NAVFAC Pacific. E2 prepared a draft survey report, which included an ACM inventory, summary tables of findings, floor plans with approximate locations of samples taken, asbestos status, a closeup and panoramic photo log of samples, and laboratory reports. E2 is currently preparing the final survey report. As a benefit to the Navy, E2 is also preparing interactive PDF files that present the ACM inventory when a specific room in the Hospital is selected. Fee: $268,039. Role: Staff Environmental Scientist/ Inspector. ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025—PAGE 17 E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY 11.NAME 12.TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED Daniel W.Amato,Ph.D. Environmental Scientist a.TOTAL b.WITH CURRENT FIRM 8 6 14.FIRM NAME AND LOCATION(City and State) Element Environmental,LLC,Aiea,Hawaii 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) Ph.D. and M.S., Botany, University of Hawaii at Manoa Certified Asbestos Inspector, HIASB-4628 B.S., Biology, University of Vermont Certified Risk Assessor/Lead Inspector, PB-1148 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) OSHA Initial HAZWOPER Training, 40-HR Scientific SCUBA diver, rescue diver, master diver,nitrox OSHA Refresher Training, 8-HR certified diver Construction Safety Hazard Awareness Training for Bloodborne Pathogens, First Aid, CPR,and AED Training Contractors, 40-HR Maritime Security Awareness Training(MARSEC) 18. RELEVANT PROJECTS (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Storm Water Sampling,City and County of Honolulu,Oahu,Hawaii PROFESSIONAL SERVICES CONSTRUCTION Ongoing N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm a. E2 is responsible for monitoring weather and collecting stormwater samples from five sites across Hawaii during its National Pollutant Discharge Elimination System (NPDES) qualifying rain events according to permit requirements. On a monthly basis, E2 reports on summary of data collected and will produce an annual stormwater report. E2 is performing storm water sampling as a subconsultant to Kennedy Jenks. Fee: $148,328. Role: Environmental Scientist. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Navy Stormwater National Pollutant Discharge Elimination System PROFESSIONAL SERVICES CONSTRUCTION (NPDES),Compliance Sampling,JBPHH, Oahu,Hawaii Ongoing N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm E2 completed storm water inspections and updated the Storm Water Management Plan (SWMP) for Commander b. Navy Region Hawaii in accordance with their NPDES permit. The SWMP contained several program components including public education and outreach, illicit discharge detection and elimination, construction site runoff control, post construction stormwater management, pollution prevention and good housekeeping, stormwater monitoring, and reporting. E2 developed Storm Water Pollution Control Plans for 68 NAVFAC Hawaii industrial facilities. E2's responsibilities include: gap analysis of previous and new permit requirements, writing sections of the SWMP,and addressing comments during the review process. Fee: $452K. Role: Environmental Scientist. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Confirmatory Soil Sampling,84-Acre Portion of Former Voice of PROFESSIONAL SERVICES CONSTRUCTION America,Maili, Oahu,Hawaii 2019 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm c. Conducted MULTI INCREMENT® (MI) sampling to assess the nature and extent of PCBs and metals contamination for the majority of the site. A separate MI sampling approach was used to assess the nature and extent of PCBs, metals, asbestos, and petroleum hydrocarbon contamination in a two-acre portion of the site. Based on the elevated PCB soil sample results and at the request of the EPA, MI sampling of an adjacent concrete building foundation was also completed for analysis of PCBs.Fee: $178,200. Role: Environmental Scientist. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED State of Hawaii,Department of Transportation,Harbors Division, PROFESSIONAL SERVICES CONSTRUCTION (1.) Illicit Discharge Detection&Elimination Program. (2.) Industrial 2016-2017 N/A &Commercial Discharge Management Program. (3.) Public Education&Outreach Program d. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑ Check if project performed with current firm Dr. Amato assisted HDOT-Harbors with the inspection of piers. Lead instructor for 5 IDDE training sessions designed for HDOT-Harbors staff&security personnel. 2. Commercial &Industrial sections of> 50 tenants, Oahu Harbors. (3) Provided in-person stormwater BMP Training to >200 tenant & staff. Assisted Harbors with educational outreach during 2016 Protect our Water Conference. Role: Environmental Consultant. ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 18 E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY 11.NAME 12.TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED Joshua B.Agpaoa, E.I.T. Staff Civil Engineer a.TOTAL b.WITH CURRENT FIRM 6 6 14.FIRM NAME AND LOCATION(City and State) Element Environmental,LLC,Aiea,Hawaii 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) B.S., Civil Engineering,University of Hawaii at Manoa Engineer-in-Training,HI (E.I.T.) Certified Asbestos Inspector, HIASB-4791 Certified Risk Assessor/Lead Inspector, PB-1137 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) OSHA 40-hour HAZWOPER Training 40-HR Construction Safety Hazardous Awareness OSHA 8-hour HAZWOPER Refresher Training Training for Contractors Bloodborne Pathogens, First Aid, CPR and AED Training 18. RELEVANT PROJECTS (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Navy Spill Prevention Control and Countermeasure Plan Update, PROFESSIONAL SERVICES CONSTRUCTION JBPHH, Oahu,Hawaii 2023 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with the current firm a. E2 completed an update of the Navy SPCC Plan in accordance with 40 CFR 112 regulating ASTs storing petroleum and cooking oil products. E2 inspected 521 ASTs and bulk oil storage areas at all Naval installations on Oahu. Worked closely with NAVFAC personnel to update the inventory, condition, and management of Navy ASTs and subsequently generated an updated SPCC Plan. Developed AST inspection forms and maintained a database of AST inspection data collected. Fee: $487,580. Role: Staff Civil Engineer. (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Biosolids Handling and Disposal Plan,Pacific Missile Range PROFESSIONAL SERVICES CONSTRUCTION Facilities,Wastewater Treatment Plant,Kauai Ongoing N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with the current firm Conducted a site investigation and sampling at the Pacific Missile Range Facility (PMRF), Kekaha, Kauai, Hawaii. b. The study included various components of the wastewater treatment systems throughout the Base, with a focus on the existing wastewater treatment plant (WWTP), individual wastewater system (IWS) facilities, sludge drying beds, and the wastewater oxidation pond (WOP). E2 evaluated the current biosolids handling practices and will develop a long-term plan for the proper treatment and disposal of biosolids at PMRF, including IWS septage,WWTP and WOP sludge.Fee: $128,895. Role: Staff Civil Engineer. (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Illicit Discharge Storm Water Inspections for Commander Navy PROFESSIONAL SERVICES CONSTRUCTION Region Hawaii,Joint Base Pearl Harbor-Hickam,Oahu,Hawaii 2024 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with the current firm E2 completed an illicit discharge survey for non-storm water discharges to CNRH municipal separate storm sewer (MS4) and waters of the U.S. in accordance with the NPDES permit issued. The project scope includes c. inspections of over 1,800 sites at Naval installations throughout the island of Oahu. The inspections are to identify any existing or potential sources of illicit discharges at each facility. E2 completed field inspections and prepared a report summarizing the findings. Responsibilities included: conducting inspections, identifying corrective actions, updating the database for submittal, and preparation of conceptual designs and cost estimates for corrective actions. Fee: $365,424.Role: Staff Civil Engineer. (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Spill Prevention and Response Plan for Marine Corps Base Butler PROFESSIONAL SERVICES CONSTRUCTION Okinawa,Japan 2023 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with the current firm d. E2 completed a Spill Prevention and Response Plan (SPRP) for Marine Corps Base (MCB) Camp Butler located in Okinawa, Japan. Mobilized a team of six personnel for the duration of three weeks in order to complete fieldwork tasks in one visit. Inspected 329 ASTs, 26 USTs, 34 chemical storage tanks, and 747 electrical transformers with capacities of 105 gallons and/or larger at 12 Sites in Okinawa and the nearby Island of Le Shima. E2 completed data sheets/photographs of each feature. Fee: $340K.Role: Staff Civil Engineer. ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 19 E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY 11.NAME 123.ROLE IN THIS CONTRACT 13.YEARS EXPERIENCE James D.Tsubone Environmental Scientist a.TOTAL b.WITH CURRENT FIRM 8 8 14.FIRM NAME AND LOCATION(City and State) Element Environmental,LLC (Aiea,Hawaii) 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) B.S., Geology, Mount Royal University, Canada Radon Measurement Professional, NRPP ID 114350-RMP Certified Asbestos Inspector, HIASB-4118 Certified Lead Risk Assessor, PB-0827 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) OSHA 40-hour HAZWOPER Training 40-hour Construction Safety Hazard Awareness Training OSHA 8-hour HAZWOPER Refresher Training for Contractors OSHA 30-hour Construction Safety and Health Confined Space Training Training Bloodborne Pathogens, First Aid, CPR, and AED Training Maritime Security Awareness Training(MARSEC) 18. RELEVANT PROJECTS (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Radon Diagnostics,Mitigation,and Testing Services for Naval Base PROFESSIONAL SERVICES CONSTRUCTION Guam Housing,Naval Base Guam,Guam 2022 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm a. E2 conducted radon testing using E-Perm® detectors in 354 housing units. Radon-resistant new construction (RRNC) was used to mitigate 11 housing units to below the EPA action level of 4 picocuries per liter of air (pCi/L). Post-mitigation testing was also performed. Reviewed report documenting field activities and recommended mitigation actions. Provided oversight of subcontractors in the field and assisted with diagnostics and testing fieldwork activities. Fee: $397,070. Role: Environmental Scientist. (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Phase I Environmental Due Diligence Audit and Phase II PROFESSIONAL SERVICES CONSTRUCTION Confirmatory Sampling,84-Acre Portion of Former Voice of 2019 N/A America,Maili, Oahu,Hawaii (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm E2 conducted a site visit, performed research, searched regulatory databases, interviewed site managers, and b. contracted an archeological firm to perform a cultural inventory survey. Prepared a Work Plan and conducted field sampling to investigate potential polychlorinated biphenyls (PCBs), metals, asbestos, and petroleum hydrocarbon contamination. Conducted Multi Increments (MI) sampling to assess the nature and extent of PCBs and metals contamination. A separate MI sampling approach was used to assess the nature and extent of PCBs, metals, asbestos, and petroleum hydrocarbon contamination in a two-acre portion of the site. Based on the elevated PCB soil sample results and at the request of the EPA, MI sampling of an adjacent concrete building foundation was also completed for analysis of PCBs.Fee: $178,200.Role: Environmental Scientist. (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Remedial Investigation/Feasibility Study for Facilities Department PROFESSIONAL SERVICES CONSTRUCTION Salvage Yard at Marine Corps Base Hawaii,Kaneohe, Oahu,Hawaii 2018 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Conducted a series of investigations to evaluate soil, surface water, and groundwater contamination and c. associated potential threats to human health and the environment posed by historic releases of polychlorinated biphenyls (PCBs). Results of previous sampling found elevated levels of PCBs in soils.Analysis of the samples collected allowed for the evaluation of both the human and ecological risks posed by contamination at the site and the delineation of areas within the site that contained the highest levels of PCBs. Size: 12 Acres.Fee: $2,2 M. Role: Environmental Scientist. (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Environmental Monitoring of Cocos Island for U.S. Coast Guard PROFESSIONAL SERVICES CONSTRUCTION former long-range navigation station (LORAN),Cocos Island,Guam 2024 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm d• E2 evaluated conditions at the site. E2 completed a field assessment that consisted of sampling soil, sediment, groundwater, biota and PCBs for petroleum contamination. E2 will prepared report with a summary of field activities, analysis of findings, and recommendations based on result of findings. Fee: $424,535. Role: Environmental Scientist. ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 20 E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY 11.NAME 12.TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED Leslie A. Robinson, E.I.T. Project Engineer a.TOTAL b.WITH CURRENT FIRM 17 3 14.FIRM NAME AND LOCATION(City and State) Element Environmental,LLC,Aiea,Hawaii 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) M.S., B.S., Civil Engineering, Massachusetts Institute of Engineer-in-Training(E.I.T.) Technology Radon Measurement Professional - NRPP 114210-RMP Certified Asbestos Inspector, CHC Training-83343433 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) OSHA Initial HAZWOPER Training, 40-HR How to Conduct a Sanitary Survey of Surface Water and OSHA Refresher Training, 8-HR Ground Water System Course,U.S. Environmental Cross Connection Control and Hydraulic Research Protection Agency Specialist Training, University of Southern California 40-HR Construction Safety Hazard Awareness Training for Confined Space Training Contractors Bloodborne Pathogens, First Aid, CPR, and AED Training 18. RELEVANT PROJECTS (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Non-Domestic Wastewater Management Plan,Joint Base Pearl PROFESSIONAL SERVICES CONSTRUCTION Harbor-Hickam,Oahu,Hawaii 2023 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm a. E2 evaluated NAVFAC Hawaii's 8,000+ facilities to identify,characterize, and quantify non-domestic wastewater discharges to the sanitary sewer system tributary to the NAVFAC Hawaii Wastewater Treatment Plant. Coordinated site visits to and conducted interviews with facility managers of over 750 facilities. The inventory of non-domestic wastewater sources collected in this study will be used to determine additional non-domestic discharges that should be internally permitted/regulated. Fee: $1,1 M. Role: Project Civil Engineer. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Cross-Connection Control Survey,Pacific Missile Range Facility PROFESSIONAL SERVICES CONSTRUCTION Barking Sands,Kekaha,Kauai,Hawaii 2019 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑ Check if project performed with current firm Conducted a cross-connection control survey of high priority facilities at Pacific Missile Range Facility (PMRF) b. Barking Sands to identify potential cross-connection conditions and evaluate existing backflow prevention (BFP) devices. Created a database to track BFP devices, device deficiencies, cross-connection conditions, and recommended corrective actions. Ms. Robinson's responsibilities included producing the Work Plan, organizing inspection teams, field inspections, developing the database, and preparing the Draft and Final Reports. Role: Engineer. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Sanitary Survey for Marine Corps Base Camp Butler and Combined PROFESSIONAL SERVICES CONSTRUCTION Arms Training Center Fuji,Japan 2016 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑ Check if project performed with current firm Conducted a sanitary survey to evaluate the drinking water system for ten installations at MCB Camp Butler and Combined Arms Training Center (CATC) Fuji. Performed an on-site review of the eight elements: water source; c. treatment; distribution system; finished water storage; pumps; monitoring, reporting, and data verification; system management and operations; and operator compliance. Ms. Robinson's responsibilities included water sampling, facility personnel interviews, inspection of on-base and off-base water system facilities, review of water quality monitoring records, and preparation of the report of identified deficiencies and recommended system improvements. Role: Engineer. (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Spill Prevention and Response Plan for Marine Corps Base Camp PROFESSIONAL SERVICES CONSTRUCTION Butler, Okinawa,Japan 2023 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with the current firm e. E2 completed a Spill Prevention and Response Plan (SPRP) for Marine Corps Base (MCB) Camp Butler located in Okinawa,Japan. Mobilized a team of six personnel for the duration of three weeks in order to complete fieldwork tasks in one visit. Inspected 329 ASTs, 26 USTs, 34 chemical storage tanks, and 747 electrical transformers with capacities of 105 gallons and/or larger at 12 Sites in Okinawa and the nearby Island of Le Shima. E2 completed data sheets/photographs of each feature.Fee: $340K. Role: Project Civil Engineer. ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025—PAGE 21 E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY 11.NAME 12.TITLE SERVICE PROVIDED 13.YEARS OF EXPERIENCE Theodore N. Uekawa, E.I.T. Staff Civil Engineer a.TOTAL b.WITH CURRENT FIRM 3 3 14.FIRM NAME AND LOCATION(City and State) Element Environmental,LLC,Aiea,Hawaii 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) M.S.,Civil Engineering,University of Hawaii at Manoa Engineer-in-Training,HI (E.I.T.) B.S., Civil Engineering,University of Hawaii at Manoa Radon Measurement Professional-NRPP 114230-RMP Certified Asbestos Inspector, HIASB-5084 Certified Lead Risk Assessor, PB-1257 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) OSHA 40-hour HAZWOPER Training 40-hour Construction Safety Hazard Awareness OSHA 8-hour HAZWOPER Refresher Training Training for Contractors OSHA 30-hour Construction Safety and Health Training First Aid, CPR and AED Training Confined Space Training 18. RELEVANT PROJECTS (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Wetlands Sediment Sampling,Marine Corps Base Hawaii,Kaneohe, PROFESSIONAL SERVICES CONSTRUCTION Oahu,Hawaii 2023 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm a. E2 completed a comprehensive environmental contaminants sediment sampling and testing on a restricted access military installation for future dredging/rehabilitation of various wetlands in Kaneohe. E2 determined detection levels of certain parameters for dredge material disposal. Coordinated with the State of Hawaii and the Environmental Protection Agency (EPA) on meeting the minimum standards necessary for dredge material disposal. Size: 23 Acres. Fee: $246K. Role: Staff Engineer. (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Surveying Small-Scale Waste to Energy Conversion Opportunity PROFESSIONAL SERVICES CONSTRUCTION Considering Strategic DoD Locations in Hawaii,Hawaii 2023 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm b. Gathered non-hazardous solid waste data from various installations and evaluated the waste composition to determine the amount of feedstock that could be used in a Small-Scale WTE unit. Costs were compared to the projected cost avoidance of landfill tipping fees due to solid waste reduction. Recommendations made for further evaluation of DoD facilities that generate enough waste to support small-scale WTE technologies and where costs were close to or under the estimated cost avoidance. Fee: $102K.Role: Staff Engineer. (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Pacific Missile Range Facility Biosolids Handling and Disposal Plan PROFESSIONAL SERVICES CONSTRUCTION Kekaha,Kauai,Hawaii 2024 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm E2 conducted a site investigation and sampling at the Pacific Missile Range Facility (PMRF), Kekaha, Kauai, c. Hawaii. The study included various components of the wastewater treatment systems throughout the Base with a focus on the existing wastewater treatment plant (WWTP), individual wastewater system (IWS) facilities, sludge drying beds, and the wastewater oxidation pond (WOP). Evaluated current biosolids handling practices, and developed a long-term plan for the proper treatment and disposal of biosolids at PMRF, including IWS septage, and WWTP and WOP sludge. Fee: $128,895. Role: Staff Engineer. (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Non-Domestic Wastewater Management Plan,Joint Base Pearl Harbor- PROFESSIONAL SERVICES CONSTRUCTION Hickam,Oahu,Hawaii 2023 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm E2 evaluated NAVFAC Hawaii's 8,000+ facilities to identify, characterize, and quantify non-domestic wastewater discharges to the sanitary sewer system tributary to the NAVFAC Hawaii Wastewater Treatment Plant (WWTP). d. Coordinated site visits to and conducted interviews with facility managers of over 750 facilities. The inventory of non-domestic wastewater sources collected in this study were used to determine additional non-domestic discharges that should be internally permitted and regulated. The project also included quarterly wastewater sampling efforts to collect both grab and 24-hour composite samples from WWTP influent locations on the Hickam Field flight line and Pearl Harbor, as well as effluent samples from the WWTP. Fee: $1,154,918. Role: Staff Engineer. ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025—PAGE 22 E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY 11.NAME 12.TITLE SERVICE PROVIDED 13.YEARS OF EXPERIENCE Maya Matsuoka Staff Environmental Scientist a.TOTAL b.WITH CURRENT FIRM 3 3 14.FIRM NAME AND LOCATION(City and State) Element Environmental,LLC,Aiea,Hawaii 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) B.A., Environmental Studies and Economics, University Certified Asbestos Inspector, HIASB-5085 of California, Santa Cruz Certified Lead Inspector, PB-1254 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) OSHA 40-hour HAZWOPER Training 40-HR Construction Safety Hazardous Awareness OSHA 8-hour HAZWOPER Refresher Training Training for Contractors Confined Space Training Bloodborne Pathogens, First Aid, CPR and AED Training 18. RELEVANT PROJECTS (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Asbestos Survey,JBPHH, Oahu,Hawaii PROFESSIONAL SERVICES CONSTRUCTION Ongoing N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm E2 conducted asbestos surveys at 38 one- and two-story buildings totaling 578,442 square feet, at Pearl Harbor and Hickam Field, Ford Island, Moanalua, Pearl City Peninsula, and Wahiawa Annex,JBPHH. E2 prepared a Work a. Plan and Health and Safety Plan prior to field work. Field work has been completed, and E2 is currently preparing Asbestos Survey Reports for each building. Each report will include a summary data table, floor plan figures with approximate sample locations and the extent of most identified Homogeneous Areas, close-up and panoramic sample photograph logs, and laboratory reports. Ms. Matsuoka performed sampling for asbestos, thoroughly documenting all field work activities with notes and photographs, and is currently assisting with preparation of report computer-aided design (CAD) figures and photograph appendices. Fee: $475,088. Role: Staff Environmental Scientist/Asbestos Inspector. (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Asbestos and Lead Paint Survey for Singapore Area Coordinator, PROFESSIONAL SERVICES CONSTRUCTION Sembawang,Singapore Ongoing N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm b. E2 is conducting an Asbestos Containing Material (ACM) survey, lead-based paint (LBP) inspection including an LBP risk assessment (LRA) and lead content soil samples for unaccompanied housing facilities and lead dust sampling for lodging units in Sembawang, Singapore. Responsibilities include sampling for ACM and LBP, thoroughly documenting all field work activities with notes and photography, and preparing computer aided design (CAD) drawing figures. Fee: $1,858,355. Role: Staff Environmental Scientist/Inspector. (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Asbestos Survey for Commander Fleet Activities Sasebo Japan PROFESSIONAL SERVICES CONSTRUCTION Ongoing N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm E2 conducted an Asbestos Survey of 37 buildings with a total area of 493,367 square feet at Commander Fleet Activities Sasebo, Japan for NAVFAC Pacific. Prepared a Work Plan and Health and Safety Plan prior to field C. work. Two one-month field mobilizations were completed. E2 prepared draft Asbestos Survey Reports for each building; each report includes a summary data table, sample and Homogeneous Area location figures, close-up and panoramic sample photograph logs, and laboratory reports. Mr. Uekawa assisted with sampling for asbestos, thoroughly documenting all field work activities with notes and photographs, and preparing report summary tables and floor plans/figures in computer-aided design and drafting software (AutoCAD). Fee: $489,996. Role: Staff Environmental Scientist/Asbestos Inspector. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Asbestos Survey,Commander Fleet Activities Yokosuka Japan PROFESSIONAL SERVICES CONSTRUCTION 2020 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm d Conducted an asbestos survey of over 100 buildings with a total area of 2,139,464 square feet and constructed between 1914 and 1970 at CFAY, Japan for the NAVFAC Pacific. Prepared a Work Plan and Health and Safety Plan (HSP) prior to field work. Responsibilities include sampling for asbestos and lead,thoroughly documenting all field work activities with notes and photographs, and preparing report summary tables and computer-aided design (CAD) figures.Fee: $999,976. Role: Staff Environmental Scientist/Asbestos Inspector. ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 23 F. EXAMPLE PROJECTS THAT BEST ILLUSTRATE E2'S QUALIFICATIONS FOR THIS SERVICE CATEGORY(1) 19.TITLE AND LOCATION (City and State) 20.YEAR COMPLETED Phase I and Phase II Environmental Site Assessments, PROFESSIONAL SERVICES CONSTRUCTION (If applicable) and Removal Action-Remediation of 5 Acres,Former 2019 N/A Voice of America Site,Maili, Oahu,Hawaii 21. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER State of Hawaii and U.S. Coast Dr.Dennis Mead (808) 535-3464 Guard 22.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) Project Scope: Element Environmental, LLC (E2) conducted a Phase I Environmental Due Diligence Audit Project Highlights: (EDDA) and Phase II Confirmatory Sampling (CS) for an Conducted a Phase I EDDA. 84-acre portion of the Former Voice of America site Conducted a Phase II CS located in Maili, Oahu. The Phase I EDDA and Phase II CS were completed in accordance with the Civilian Federal MI soil sampling for PCBs and metals throughout 82 Agency Task Force's (CFATF) Guide on Evaluating acres of the site. Environmental Liability for Property Transfers (August MI soil sampling for PCBs,metals,asbestos,and 1998) in support of a transfer of the property to the State petroleum hydrocarbons throughout 2 acres of the of Hawaii. site. In support of the Phase I EDDA, E2 conducted a site visit, Installation of six groundwater monitoring wells performed research on the site history, searched and collection of groundwater samples for PCBs, regulatory databases, interviewed site managers, and metals,petroleum hydrocarbons, BTEX, MTBE, contracted an archeological firm to perform a cultural PAHs, and HVOCs. inventory survey. In support of the Phase II CS, E2 prepared a Project Work Plan and conducted field Discrete surface and subsurface soil sampling for sampling to investigate potential polychlorinated PCBs at two previously identified locations of PCB biphenyls (PCBs), metals, asbestos, and petroleum contamination hydrocarbon contamination related to the historic use of MI sampling of concrete building foundation for the site. PCBs The field sampling effort consisted of various sampling Operation of a field laboratory to reduce the techniques for multiple sample media. A Multi Increment number of off-site PCB analysis and time to obtain (MI) sampling approach was utilized to assess the nature analytical results. and extent of PCBs and metals contamination for the majority of the 84-acre project site. A separate MI Prepared a Groundwater Monitoring Plan for the sampling approach was utilized to assess the nature and site. extent of PCBs, metals, asbestos, and petroleum Conducted remediation of 5 acres hydrocarbon contamination in a two-acre portion of the facility. Six groundwater wells were also installed ESA Cost: $289,550, and RA Cost: $206,121 surrounding this area; and groundwater samples were collected and analyzed for PCBs; metals; petroleum hydrocarbons; benzene, toluene, ethylbenzene, and xylenes (BTEX); methyl tert-butyl ether (MTBE); polynuclear r. aromatic hydrocarbons (PAHs); and halogenated volatile .terr . organic compounds (HVOCs). �'�� �.w In addition, over 100 discrete soil samples were collected ` 'S. ' to evaluate the lateral and vertical extent of known PCB ,�\,. ;. �.;� . `'' I contamination at two previously identified locations. E2 1 r 1 - operated a field laboratory to reduce the number of off-site ..: ` - �krio j PCB analysis and to reduce the turn-around-time for �`` " �''j x ' r :,..ti analytical results. Ten percent of the PCB samples were « , . .0. • , €" analyzed by an off-site laboratory to verify the results of 4.;',''4,1- ,� .�' gi ' E2's field laboratory. Based on the elevated PCB soil ��Iii ` � ), sample results and at the request of the USEPA Region 9, d„ I .0 Iii '. , MI sampling of an adjacent concrete building foundation w. , , =-, ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025—PAGE 24 F. EXAMPLE PROJECTS THAT BEST ILLUSTRATE E2'S QUALIFICATIONS FOR THIS SERVICE CATEGORY(1) 19.TITLE AND LOCATION (City and State) 20.YEAR COMPLETED Phase I and Phase II Environmental Site Assessments, PROFESSIONAL SERVICES CONSTRUCTION N/A(ifappiicabie) and Removal Action-Remediation of 5 Acres,Former 2019 Voice of America Site,Maili, Oahu,Hawaii was also completed for PCBs. E2 conducted a Removal Action (RA) to remove PCB, lead, and arsenic-contaminated soil and concrete in order to prevent exposure to an unacceptable human health risk of current surrounding residents and future potential users of the property. Excavated and removed soil and concrete containing contaminants greater than current HDOH EALs (1.2 mg/kg PCBs, 200 mg/kg lead and 24 mg/kg arsenic) from the approximate five acre former VOA transmitter building area and transported the soil and concrete to the appropriate disposal facilities on and off- island. q , v III _ �^� �,�' ice' < ,' 1 - • :1-6"1.- ,,,%---'-''' .y v .k'F r� y ` _..�'y ,w. y x a 1 �� �. , .d . r.. . 0. w,_ y� R fid'. k°,'f ;` ci.. �.'�.� '. ...r.. Auc./3 t 'Ia ... ,.5 :'rw�. 23. FIRMS INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE a' Element Environmental,LLC Aiea,HI Contractor ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025—PAGE 25 F. EXAMPLE PROJECTS THAT BEST ILLUSTRATE E2'S QUALIFICATIONS FOR THIS PROJECT CATEGORY(2) 19 TITLE AND LOCATION (City and State) 20.YEAR COMPLETED National Environmental Policy Act Compliance for CONSTRUCTION (If applicable) PROFESSIONAL SERVICES Construction of a new Helipad at Kaena Point 2021 Satellite Tracking Station, Oahu,Hawaii 21. PROJECT OWNER'S INFORMATION b. PROJECT OWNER b. POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER U.S.Army Corps of Engineers Mr. Michael Desilets (808) 835-4039 Honolulu District 22.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) Project Scope: The contract for completing an Environmental Assessment (EA) for the proposed construction and operation of a Project Highlights: new helipad at Keana Point Space Force Station, formerly Kaena Coordinated project with U.S.Army Corps Point Satellite Tracking Station (KPSFS) was awarded to Element of Engineers- Honolulu District to ensure Environmental, LLC (E2). The new helipad was intended to replace NEPA Compliance for environmental an outdated existing helipad designed for visual flight rules and to impacts support medical evacuations, various utility helicopters, and other operations in emergencies or construction,adhering to Uniform Fire National Historic Preservation Act and Code and Federal Aviation Administration design criteria. Endangered Species Act Located on Oahu's remote northwest tip, the station required a Ensured Regulatory Compliance was permanent, limited-use helipad for medium utility helicopters like followed the UH-60 Black Hawk. The proposed 50 by 50 feet concrete pad Cultural and Natural Resources, Noise, will include a windsock and be marked with an "H" for aerial Traffic,Air Quality visibility, connecting to a nearby road for access. Cost: $204,945. The chosen site, known as the "stump yard," offers unobstructed helicopter access and ideal positioning for station operations. Construction will involve clearing vegetation, soil compaction, and paving that will impact around 34,900 square feet. It will utilize t' various heavy machinery and tools, with staging areas on adjacent 4„1p`"f;,,k,w, ` a,�.a•.�a land. iko'„, •�}} ,HSrc3Y I "✓jl� Manua KPSFS's mission is to support satellites through the Air Force w, way,:., -. • Satellite Control Network, with facilities along Kuaokala Ridge. The station has been operational since 1958 and has historically supported various DoD programs. ',r`"� The helipad site, within the State Conservation District, aligns with ,,,; the City and County of Honolulu zoning for preservation. The EA I .w evaluated environmental impacts, including a "No Action" alternative. Consultations with agencies and stakeholders, including ,, M �,: under the National Historic Preservation Act and Endangered Species Act,were part of the assessment process. Despite the Final Draft EA completion,the project was paused on May 27, 2021. The EA addressed potential environmental impacts, including cultural and natural resources,noise,traffic,air quality, and regulatory compliance. " WYI T 23. FIRMS INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE a' Element Environmental,LLC Aiea,HI Prime Contractor (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE b. Kleinfelder,Inc. Honolulu,HI Archaeology ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 26 F. EXAMPLE PROJECTS THAT BEST ILLUSTRATE E2'S QUALIFICATIONS FOR THIS SERVICE CATEGORY(3) 19.TITLE AND LOCATION (City and State) 20.YEAR COMPLETED Phase I and Phase II Environmental Site Assessments PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Mauna Kupu Station,Waianae Mountain Range,Waianae, 2021 and 2022 N/A Oahu,Hawaii 21. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NO. City and County of Honolulu Ms.Kimberly Ribellia-Collins (808) 524-4200 22.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) Project Scope: (2021) Element Environmental, LLC (E2) conducted a Phase I Environmental Site Assessment (ESA) for the 1.113-acre Pacific Missile Range Facility Mauna Kapu Station located near the southern ridgeline of the Waianae Mountain Range on Oahu and designated as Tax . -- Map Key (TMKs): (1) 9-2-049:013 (portion); that consists of Lot 340, Parcel 1, and Easement 110 hereinafter "the Subject Property". The Subject Property was owned by Gill Ewa Lands, LLC at the time of the assessment (City and County of Honolulu [CCH] Department of Planning and Permitting [DPP] 2020a). The Department of the Navy (DoN) leased the Subject Property since 1963 (Naval Facilities Engineering Systems Command [NAVFAC] Pacific 2020). ¢ s The Phase I ESA was conducted in general conformance with ASTM International (ASTM) Practice E 1527-13, Standard Practice for ,° • ," Environmental Site Assessments and All Appropriate Inquiries (AAI), which includes 40 Code of Federal Regulations (CFR) Part 312, Section (§) Project Highlights: 312.21 and §312.31. The purpose of the Phase I ESA was to identify any potential and existing environmental contamination liabilities. F E2 conducted a Phase I ESA and identified RECs for the site.E2 (2022) E2 conducted a Phase II ESA for the same site. The Phase II ESA recommended to further characterize was conducted in general conformance with the State of Hawaii the site. Department of Health (DOH) Hazard Evaluation and Emergency Response (NEER) Office Technical Guidance Manual for the Implementation of the E2 conducted a Phase II ESA for the Hawaii State Contingency Plan (TOM) (DOH NEER Office, 2008 and Navy to end its long-term lease and updates). The purpose was to evaluate the presence/absence and nature return the property to its owner. of contamination in surface and shallow subsurface soils based on Conducted a site investigation for relevant findings of a previous Phase I Environmental Site Assessment contaminants of potential concern in conducted in 2021. The Phase II ESA activities included the collection of surface and shallow subsurface soil surface and shallow subsurface soil samples in identified areas of concern samples. and the completion of a camera survey to verify the existence/location of a cesspool and to evaluate a potential contaminant source associated with Verified the existence and location of a a floor drain in a former generator room. cesspool, and evaluated a potential contaminant source from a floor drain It was found that contaminants of potential concern (COPCs) in a former generator room. concentrations exceeded the DOH Tier 1 (Residential land use) Environmental Action Levels (EALs) for four of the five soil environmental Cost: $41,239. and$78,010. hazards: direct exposure, vapor emissions to indoor air, gross contamination, and leaching to groundwater. Arsenic exceeded the commercial/industrial land use (C/I) and Construction/Trench Worker scenario action levels for direct exposure in the Wooden Antenna Tower. E2 identified several potential contaminant sources. Some sources were resultant from historical activities that no longer occur and can be addressed: weed control using banned pesticides; fueling, operation, and maintenance of diesel-powered generators; operation and maintenance of antennas, antenna equipment, and transformers; construction, maintenance, and alterations to the wooden antenna tower and Former Water Tank; lead in soil from Lead Based Paint(LBP) used on the Former Water Tank and released to soil during demolition. Others are associated with existing site conditions that may continue to negatively impact the Subject Property if they are not addressed first: releases of wood treatment chemicals applied to the wooden antenna tower and cadmium-coated hardware used in its construction; and lead from LBP used on the exterior of Building 204. Five COPCs were found present in ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025—PAGE 27 F. EXAMPLE PROJECTS THAT BEST ILLUSTRATE E2'S QUALIFICATIONS FOR THIS SERVICE CATEGORY(3) 19.TITLE AND LOCATION (City and State) 20.YEAR COMPLETED Phase I and Phase II Environmental Site Assessments PROFESSIONAL SERVICES 2021 and 2022 CONSTRUCTION (If applicable) Mauna Kupu Station,Waianae Mountain Range,Waianae, N/A Oahu,Hawaii surface and shallow subsurface soils at concentrations that exceed DOH Tier 1 and C/I EALs for one or more of the following: TPH-DRO, TPH-RRO, arsenic, cadmium and lead. COPC concentrations also exceed DOH Tier 1 action levels for potential environmental hazards for direct exposure, gross contamination, vapor emissions to indoor air, and leaching to groundwater, and may pose a risk to human health and the environment. The nature and extent of contamination at the Subject Property have not been fully characterized or delineated. , ,,, ,. ,,,,, r....., 4,tft _"'",. , l',".ii 'P 44$* er,k,'' ,,,/ ' i*/ ,P,, r wei41.P°,1°70 rets "` yY t 4 �' •�, .1."4, ^9�'„� . .1show, m , e 44‘4,,4,e,r ,8 " as ', f ! rv� �• aw P r w k '" "'4C off y " " �„; } q � fi .w .w.r. F w r ,.is 11111' c' ' ti :: '.E �` �< tfiv I� hhhFFP � w 317 : 4::If'1; 7.*7.11'' '''r - "':',40'.0 Nic,:, ,O Pi �" _4.1 • 'aii,',6,H--, .... ,-P ..:,,,,_ 0,,, ° ', ,, A. -41 .%w " ...,y 4 ^r ., ti`s: uw r, I '� qua �.� "� � ` - r0116.1- F an 5 � N 46.11" .� W .i"30, p � a . � � ,ff�r 4 y �4 tit 23. FIRMS INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE a' Element Environmental,LLC Aiea,HI Prime Contractor ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 28 F. EXAMPLE PROJECTS THAT BEST ILLUSTRATE E2'S QUALIFICATIONS FOR THIS PROJECT CATEGORY(4) 19.TITLE AND LOCATION (City and State) 20.YEAR COMPLETED Assessment of the Wahiawa Irrigation System,Wahiawa to PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Waialua,Oahu,Hawaii Ongoing N/A 21. PROJECT OWNER'S INFORMATION c. PROJECT OWNER b. POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER State of Hawaii,Agribusiness Mr. Mark Takemoto (808) 586-0186 Development Corporation 22.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) Project Background: The Wahiawa Dam was constructed in 1905 to create a great reservoir basin to capture waters in the Project Highlights: Kaukonahua Stream from the Koolau Mountains for a massive E2 conducted a comprehensive inventory and irrigation system for Central Oahu farming that continues to this condition assessment of the irrigation system day.The system generated hydroelectric energy and has received including the development of detailed GIS- R2 wastewater from the nearby City and County of Honolulu based system maps. Cost estimates for major Wahiawa Wastewater Treatment Plant (WWTP). Since 1957, system repairs and annual operation and through a cooperative agreement with Castle & Cooke, Inc., the maintenance were prepared. State of Hawaii Department of Land and Natural Resources (DLNR) has managed a public fishing area on the Wahiawa E2 conducted a Phase I ESA to identify reservoir and has constructed and manages a boat ramp at the recognized environmental concerns for possible 66-acre Wahiawa State Freshwater Park. The Wahiawa Irrigation transfer of ownership. System (WIS) includes Lake Wilson and has a critical role in the economy of Hawaii by providing an essential input for E2 is conducting a Phase II ESA,preparing a agricultural production in the Wahiawa-Waialua-Haleiwa area. sampling and analysis plan for soil,water and The State of Hawaii Agribusiness Development Corporation sediment sampling and analysis for (ADC) is responsible for conducting a due diligence assessment to environmental contaminants. determine the feasibility of purchasing,upgrading, operating, and maintaining the WIS. The ADC has retained Element Cost: $665,939. Environmental, LLC (E2) to evaluate the WIS,to conduct a Phase I Environmental Site Assessment(ESA),and a Phase II ESA. Project Scope: Wahiawa Irrigation System Assessment: E2 conducted an Assessment of the WIS which included various comprehensive tasks. E2 examined legal rights, obligations, responsibilities, and liabilities pertaining to the WIS. This included the review of public tax maps, and ownership records, analysis of watershed maps, the review of state laws and documentation, and an examination of existing agreements and permits governing the discharge of treated effluent into the water system by U.S. Army's Schofield WWTP and City and County of Honolulu's Wahiawa WWTP. E2 personnel also visually inspected the Wahiawa Reservoir and the irrigation ditch system. The WIS consists predominantly of open, unlined ditch with various forms of lining, pipes, flumes, and tunnels in locations where the terrain requires (i.e., in areas of steep slopes, the ditch is often lined to mitigate slumping or caving-in of the ditch walls). The system components were inventoried and georeferenced, and the condition of each component was assessed and photographed.The study provided tables, maps, and photographs describing the major components and their condition and location.The study also provided a map of the parcels serviced by the system and was classified by the type of agricultural crop. E2 identified system components in immediate need of repairs, provided budgetary estimates of repairs and improvements for the entire WIS considered for acquisition, and provided a comprehensive overview of the financial requirements for repairing, upgrading, and optimizing the WIS infrastructure, thereby supporting informed decision- making and effective resource allocation. The Assessment focused on evaluating various aspects, including Agriculture Activities (i.e., gathered insights into the types of agricultural activities undertaken by water users within the system, such as crop cultivation or other agribusiness ventures); Irrigation Methods (i.e., irrigation techniques employed by water users, ranging from traditional flood irrigation to more modern drip or sprinkler systems); the type of Crops Grown (i.e. identified the specific crops cultivated by water users within the system, including staple crops, specialty crops, or cash crops); Use of Controlled Environments (i.e., assessed the use of controlled environments such as shade structures or greenhouses ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025—PAGE 29 F. EXAMPLE PROJECTS THAT BEST ILLUSTRATE E2'S QUALIFICATIONS FOR THIS PROJECT CATEGORY (4) 19.TITLE AND LOCATION (City and State) 20 YEAR COMPLETED Assessment of the Wahiawa Irrigation System,Wahiawa to PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Waialua,Oahu,Hawaii Ongoing N/A by water users to optimize growing conditions and crop yields. By conducting these interviews and analyzing the 4' gathered data, E2 provided valuable • insights into how potential changes in water delivery methods could impact ) agricultural productivity within the WIS, thereby informing decision-making v processes related to system management and optimization. E2 provided the draft • WIS report on May 24, 2024, to the ADC and is currently awaiting comments to ti finalize the study. Phase I Environmental Site Assessment(ESA): E2 conducted a Phase I ESA for seven parcels of land associated with the WIS and identified by the State of Hawaii for acquisition by the Agribusiness Development Corporation. The purpose of the Phase I ESA was to identify environmental issues as part of due diligence prior to the transfer of ownership.The seven parcels totaling 120.9826 acres of land associated within the WIS included Tax Map Key (TMK) (1) 7-1-012:007, Wilikina Drive owned by Sustainable Hawaii, Inc. (SHI), TMK (1) 7-1-012:004 at 71-129 Wilikina Drive owned by SHI, TMK (1) 7-3-013:003 Wilkina Drive owned by Wahiawa Water Company, Inc.; TMK (1) 7-1- 012:003 Kamehameha Highway owned by SHI, TMK (1) 7-3-005:005 Pakauwili Loop owned by Dole Food Company, Inc. leased by Wahiawa Water Company, Inc., TMK (1) 7-1-001:017 at 71-400 Kamehameha Highway, and TMK (1) 7- 1-001:013 Kamehameha Highway owned by SHI.The Phase I ESA report was completed on April 10, 2024. Land Survey: E2 is collaborating with R.M. Towill Corporation, who will provide a boundary plat for the parcels for this land survey. E2 will provide an encroachment assessment report and survey map to the ADC upon completion of this task. Phase II Environmental Site Assessment (ESA): E2 is also completing a Phase II ESA in order to evaluate areas of concern identified within the site for contaminants of potential concern (COPCs). E2 is preparing a sampling and analysis plan that will document the procedural and analytical requirements to conduct the fieldwork scheduled this summer, 2024. E2 will be collecting samples from various environmental media (i.e., surface soil, subsurface soil, water, and sediment) based on a MULTI INCREMENT® sampling methodology. The number of samples, target depths, and decision units will be determined based on the environmental media and Phase I ESA findings. Replicate samples will be collected for quality assurance [QA] purposes. A list of the analytes of concern at each location will be determined and reasons for the specific chemical or group of chemicals were chosen (i.e., heavy metals, pesticides, etc.). The samples will be packed in a cooler with gel ice and shipped overnight via FedEx to an accredited laboratory for analysis. E2 will follow quality control procedures for handling and shipping samples, maintain a chain of custody record, document and maintain comprehensive field notes, and provide the detailed results in the Phase II ESA report which will identify any COPCs exceeding environmental action levels. 23. FIRMS INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE a. Element Environmental,LLC Aiea,HI Prime Contractor (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE b. R.M. Towill Corporation Honolulu, HI Boundary Survey Plat ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025—PAGE 30 F. EXAMPLE PROJECTS THAT BEST ILLUSTRATE E2'S QUALIFICATIONS FOR THIS SERVICE CATEGORY (5) 19.TITLE AND LOCATION (City and State) 20.YEAR COMPLETED Limited Hazardous Materials Survey, Building 1756, PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 91-1071 Yorktown Street, Kalaeloa,Oahu, Hawaii 2024 N/A 21. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NO. State of Hawaii,Department of Ms.Malia Cox (808) 620-9485 Hawaiian Home Lands 22.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) Project Scope: Element Environmental, LLC (E2) conducted a limited hazardous materials survey of a two-story building (total area of 8,200 square feet) in Kalaeloa, Oahu, Hawaii. The _ „ DHHL is proposing to rehabilitate the ¢ ' former militarypersonnel quarters for I, " f' ow, use as temporary transitional housing ��s `� " _ 0. , for homeless native Hawaiian , : �,-w� • _- beneficiaries who are on the DHHL's ' .°lie ,_,-. =r- " "" ", . ` applicant wait lists. The building is '"l '.= �.f/ r: constructed with concrete floors, " '11911 , ' il. ( concrete masonry unit (CMU) walls, ; pit/ . concrete ceilings, and gypsum *.` 11 wallboard systems, and ceramic wall - _. and floor tiles in the bathrooms. E2 reviewed pertinent documents and available previous survey reports provided by the DHHL and provided a summary of pertinent findings in the report. The limited hazardous materials survey included: 1) sampling and testing of suspect asbestos-containing materials (ACM), arsenic in suspect canec panels, and lead in the paint not already sampled in previous surveys; and 2) a visual inventory for polychlorinated biphenyls (PCBs) and mercury in fluorescent light fixtures. The Limited Hazardous Material Survey fieldwork was completed in April and July 2023 and the report was completed in September 2023. The report included a summary of findings, data tables of sample results, AutoCAD figures showing approximate sample locations and hatched positive asbestos Homogeneous Area results, sample photographs,laboratory reports and chain-of-custody records. E2 1) prepared bid documents for debris removal and hazardous materials abatement of the building; 2) conducted a pre-bid site visit for contractors; 3) evaluated bids and selected the abatement contractor; 4) held a pre-construction meeting; 5) reviewed contractor submittals; 6) obtained a subconsultant to provide project monitoring services during the abatement and disposal of asbestos-containing materials,moldy gypsum walls and ceilings,and loose and flaky lead paint,and the removal and disposal of assumed PCB ballasts and mercury tubes/bulbs; and 7) conducted random site visits to monitor abatement progress. The work also included the removal and disposal of a propane gas aboveground storage tank and underground piping extending to the building. 23. FIRMS INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE a. Element Environmental,LLC Aiea, HI Prime Contractor ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025—PAGE 31 F. EXAMPLE PROJECTS THAT BEST ILLUSTRATE E2'S QUALIFICATIONS FOR THIS SERVICE CATEGORY[6] 19.TITLE AND LOCATION (City and State) 20.YEAR COMPLETED Phase I Environmental Site Assessment PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 360 California Avenue,Wahiawa,Oahu,Hawaii 2023 N/A 21. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NO. City and County of Honolulu Ms.Kimberly Ribellia- (BOB) 524-4200 Collins 22.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) Project Scope: The City and County of Honolulu (CCH), Community Based Development Division, Department of Community Services retained Element Environmental, LLC (E2) to conduct a Phase I Environmental Site Assessment (ESA) for one 0.2066-acre parcel of residential land located at 360 California Avenue in Wahiawa, Oahu, Hawaii, and designated as Tax Map Key (TMK): (1) 7-3-004: Parcel 020; hereinafter referred to as "the site, the subject property, and/or the property." The property at the time of assessment was owned by the Frederick A. Trust and Harris T. Zane Trust - .. (CCH 2023a). This Phase I ESA was conducted in general conformance with ASTM International (ASTM) Practice E1527-21, Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process pursuant to Regulation 24 CFR Part 51 Subpart C.The purpose of the Phase I ESA was to identify Recognized Environmental Condition Project Highlights: (RECs) (if any) as part of due diligence before purchasing the Completed a Phase I ESA(acquisition of property) property. ASTM guidance defines RECs as the presence of hazardous substances or petroleum products in, on, or at the E2 conducted document review,historic research, subject property due to a release to the environment,the likely a site reconnaissance,and identified areas of presence of hazardous substances or petroleum products in, concern at the site. on, or at the subject property due to a release or likely release to the environment, or the presence of hazardous substances or petroleum products in, on, or at the subject property under Cost: $8,900. conditions that pose a material threat of a future release to the environment. E2 conducted the subject property's visual site inspection (VSI) on March 1, 2023.At the time of the VSI,the subject property was occupied by a three-story residential development constructed in 2010. The lower level of the building was being used for parking and was paved. The building was developed as a Boarding House/Dormitory with 24 individual studios, each with a wet bar and individual toilets. A main kitchen shared by the units is located on the second floor. The surrounding area was mainly pea gravel with bushes and trees in pots against the fence line. The subject property was surrounded by mixed residential and community businesses, including Jack in the Box and the Wahiawa Medical Office. 23. FIRMS INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE a. Element Environmental,LLC Aiea,HI Prime Contractor ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025—PAGE 32 F. EXAMPLE PROJECTS THAT BEST ILLUSTRATE E2'S QUALIFICATIONS FOR THIS PROJECT CATEGORY (7) 19.TITLE AND LOCATION (City and State) 20.YEAR COMPLETED Environmental Services for Kekaha Residential Lots,Unit PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 4 Subdivision 2019 N/A 21. PROJECT OWNER'S INFORMATION d. PROJECT OWNER b. POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER State of Hawaii,Department of Mr. Stewart Matsunagta (808) 620-9283 Hawaiian Home Lands 22.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) Project Scope: In 2019, Prime Contractor E2 completed site project Highlights: characterization activities at the Kekaha Residential Lots (KRL) site E2 worked closely with DHHL and HDOH to to further evaluate the environmental condition of surface and develop the sampling methodology, and subsurface soil and fruit, vegetables, and herbs at the Kekaha present the results, findings, and the way Residential Lots, Unit 4 Subdivision site located in Kekaha, Kauai, forward in a way that the residents could Hawaii. The site investigation scope of work was based on easily understand. information provided by the Department of Hawaiian Home Lands (DHHL), interviews with the KRL residents, and the findings of the E2 participated in public meetings and met previous environmental work completed at the property. with and interviewed the residents, Site characterization activities included public meetings and discussed proposed project activities and interviews with affected residents, site visits, MULTI INCREMENT® findings, and addressed questions and (MI) surface soil screening/sampling for all 50 lots for metals, concerns. subsurface soil screening/sampling for Lots 3 and 39 for metals and petroleum-related contamination, evaluation of heavy metals in vegetables grown onsite, and interfacing with community and regulatory agencies and residents. The environmental work was conducted in general accordance with guidance provided in the State of Hawaii Department of Health (HDOH) Hazard Evaluation and Emergency Response (HEER) Office Technical Guidance Manual (TGM). DHHL and E2 worked with the HDOH HEER Office to design and implement a community outreach and site investigation process to further evaluate the presence/absence and magnitude of heavy metals and debris contamination at the site in a transparent, informational manner so that residents would understand and trust the process and results. Soil sampling was conducted using MI sampling methodology. Each sample was thoroughly mixed in a resealable bag and screened on location for heavy metals (arsenic, cadmium, chromium, lead, selenium, and silver) using an X-ray Fluorescent (XRF) detector. The XRF screening process was demonstrated, and findings were discussed with available residents at the time each lot was sampled. Based on observations made in the field during the investigation and the soil sample results,the following findings were determined. • Heavy metals were not detected in the surface soil in any of the lots K�EKJR�nREsioEN AecoTS (except for Lot 3) at concentrations that exceed HDOH Tier 1 EALs. N1aJ4isuan'v'S'O"' • Heavy metals were not detected in Lot 3 subsurface soils at concentrations that exceed HDOH Tier 1 EALs with the exception of • �~ arsenic. The Lot 3 sample was additionally analyzed for • / bioaccessible arsenic. Arsenic and bioaccessible arsenic + , concentrations indicate that the soil is a Category B Soil, which is 1'" '"= 31, minimally impacted. • Surface and subsurface soil within the boat maintenance area of Lot 39 have been negatively impacted by engine maintenance activities. Concentrations of diesel-related hydrocarbons are present at concentrations that exceed maximum allowable levels for residential and commercial/industrial use areas. • Metals were not present in produce grown in residents'yards at levels of concern. • Debris, including glass, metal, coal-like material, char, fabric, and ceramic, is present in surface and subsurface soil throughout the subject property and poses a physical hazard to the residents. E2 prepared Fact Sheets for each individual lot owner to provide a summary of the sample results, a summary report, and a soil management plan to provide long-term management guidance for debris and tar remaining in surface and subsurface soil. 23. FIRMS INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE a' Element Environmental,LLC Aiea,HI Prime Contractor ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025—PAGE 33 F. EXAMPLE PROJECTS THAT BEST ILLUSTRATE E2'S QUALIFICATIONS FOR THIS SERVICE CATEGORY (8) 19.TITLE AND LOCATION (City and State) 20.YEAR COMPLETED Phase I Environmental Site Assessment,230 Mahiai PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Street,Hilo,Hawaii Island,Hawaii 2015 N/A 21. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b. POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NO. State of Hawaii,Department of Mr.Roy Takemoto (808) 620-9590 Hawaiian Home Lands 22.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) Project Scope: In 2015, Element Environmental, LLC completed a - s '15Phase I Environmental Site Assessment (ESA) for one parcel of - m 'y developed land located at 230 Mahiai Street in Hilo, Hawaii Island, M �r at Hawaii. The site is owned by the State of Hawaii Department of ry !II Hawaiian Home Lands (DHHL) and was leased by Frederick H. K. ' ; j SUBJECT PROPERTY Baker Jr. The purpose of this assessment was to evaluate the i r t. .11 environmental condition of the property and identify recognized ", r environmental conditions (RECs). This Phase I ESA was performed under the conditions of, and in general accordance with the ASTM y A Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process (ASTM Designation E 1527-13). Adherence to the ASTM standard is intended to limit the liability of property owners from inherited environmental contamination. The Phase I ESA included a review of regulatory records, site history, and physical characteristics (e.g., geology, hydrogeology, climate, etc.), site reconnaissance, interviews, data evaluation,and report preparation. At the time of the site reconnaissance, the property was occupied by one residential structure, an electrical utility shed, one small kennel on the north side of the dwelling, and a large kennel to the southeast of the dwelling. The property was bounded on the north by grubbed and graded gardens and orchards, to the east and west by residential lots, and to the south by undeveloped land.A large portion of the property was covered by thick grassy vegetation,limiting assessment of the site due to restricted access and/or visibility.A review of the historical use of the property and adjacent properties indicates that the property and adjacent properties are located within an area formerly occupied by sugar cane fields from c. 1870s until c. 1966. The property was turned over to DHHL c. 1982 and the residential dwelling was constructed in the mid-1980s. Historical information regarding the property from 1907 to 1910, 1915 to 1930, 1933 to 1953, 1957 to 1962, and 1966 to 1974 was limited. The assessment revealed the following evidence of RECs associated with the site: • Fill material: The property and surrounding properties were graded and filled with soil from an unknown source.This is considered to be a REC because the nature and source of fill brought onto the site are unknown. It is possible that fill material was obtained from former agricultural lands and may be negatively impacted by historical use of pesticides (conditions indicative of a release to the environment). • Potential illegal discharge to the ground: The large kennel, located on the southeast side of the dwelling, has a narrow concrete drainage channel at the back of the structure, with what appears to be a polyvinyl chloride drainage pipe. It is likely that the pipe discharged animal waste to the ground resulting from kennel cleaning operations. The ground in the vicinity of the drainage pipe appears to have subsided and the depression is covered by a piece of plywood.This is considered to be a REC because discharge of wastewater directly to the ground without a discharge permit is not authorized by state and/or local agencies (conditions indicative of a release to the environment). The following,while not RECs, is considered to be a potential environmental concern: • There was a small area of stressed vegetation in the vicinity of the small kennel located on the north side of the residence.There may be something buried beneath a"wood cover" (covered with vegetation) observed on the ground in front of the kennel. The cause of the stressed vegetation is unknown and is considered to be a potential environmental concern. 23. FIRMS INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE a' Element Environmental,LLC Aiea,HI Prime Contractor ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025—PAGE 34 F. EXAMPLE PROJECTS THAT BEST ILLUSTRATE E2'S QUALIFICATIONS FOR THIS PROJECT CATEGORY(9) 19 TITLE AND LOCATION (City and State) 20.YEAR COMPLETED Preliminary Environmental Assessment and Site Inspection, PROFESSIONAL SERVICES CONSTRUCTION (If applicable) USCG Air Station Barbers Point,Kapolei,Oahu,Hawaii 2022-Ongoing 21. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER United States Coast Guard Mr.Mark Marini (843) 819-1964 22.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) Project Scope: Element Environmental (E2) conducted an Environmental Assessment of the Air Station Barbers Point (ASBP) located in Kapolei, Hawaii. c n e t: t a E2 conducted a Preliminary Assessment (PA) and a Site Investigation 1` (SI) across the entire United States Coast Guard (USCG) Air Station Barbers Point (ASBP) Installation. The primary purpose of this project1111 was to gather data for environmental media (soil and groundwater) to determine residual environmental impact of current and former activities at the installation. d ° E2 conducted a preliminary assessment/records search of the site, including meeting with the on-site contacts, and review of previous environmental investigations, to determine the potential areas of contamination at the site based on historical and current site use to determine if there is a remaining source of PCBs _ and/or pesticides and other contaminants including those listed below, Project Highlights: at the site through investigation (soil and groundwater sample analysis). RCRA 8 metals and Copper by EPA Method 6010B & 7470A, E2 has expertise in performing a PFAS PAHs by 8270C SIM, DDT and other legacy chlorinated pesticides by investigation at Air Station Barbers 8081, PCB by 8082, PFAS by 1631, Dioxins by 8290, and Hexavalent Point. Chromium. E2 has personnel with direct The PA identified several concerns from former and ongoing site use. experience working with PFAS ASBP is a USCG air station that is located on the site of a former US chemicals at Air Station Barbers Point Navy Base. The US Navy had multiple sites that may have left legacy in Hawaii. contamination issues for the base. There is a Base Realignment and Cost: $194,057. Closure (BRAC) closure report on environmental liabilities associated with former Navy activities and a recent preconstruction environmental survey that discovered low levels of PCBs near the site for construction.A significant concern from the BRAC report is the existence of a former airfield Firefighting Training Pit(FFTP) located on the current base. Aqueous Film Forming Foam (AFFF) containing Poly- and Per- Fluoroalkyl Substances (PFAS) was used in firefighting training exercises at the pit. PFAS are very stable emerging contaminants with conservative United States Environmental Protection Agency (USEPA) Health Advisory Levels (HALs) set in the part per trillion level. Knowledge and data continue to evolve our understanding of the environmental and health impacts associated with the release of PFAS. Certain PFAS, most notably some of the perfluoroalkyl acids (PFAAs), such as perfluorooctanoate (PFOA) and perfluorooctane sulfonate (PFOS), are mobile, persistent, and bioaccumulative, and are not known to degrade in the environment. A drum storage area was located near the FFTP where waste oils were stored for use in igniting objects for firefighting training purposes. A sump was used to collect fluids that were drained from the FFTP. An injection well near the taxiway was impacted by a former fuel spill on the site.The Coast Guard HC-130 aircraft stationed at ASBP are coated with paint which contains cadmium and chromium. The installation includes a hangar where aircraft paint maintenance is performed. Fieldwork was conducted in accordance with a work plan that was based on the findings from the PA. Surface soil samples were collected from sixteen Decision Units (DUs) representing the entire unpaved surface of the base. DUs were established based on past and present site use and related potential impacts. A building was erected over the area where a surface soil sample contained slightly elevated levels of PCBs in the 2012 phase II ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025—PAGE 35 F. EXAMPLE PROJECTS THAT BEST ILLUSTRATE E2'S QUALIFICATIONS FOR THIS PROJECT CATEGORY(9) 19 TITLE AND LOCATION (City and State) 20.YEAR COMPLETED Preliminary Environmental Assessment and Site Inspection, PROFESSIONAL SERVICES CONSTRUCTION (If applicable) USCG Air Station Barbers Point,Kapolei, Oahu,Hawaii 2022-Ongoing 21. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b. POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER United States Coast Guard Mr. Mark Marini (843) 819-1964 investigation.An adjacent DU was sampled in this investigation. Groundwater monitoring wells were located down gradient from areas of concern that were identified during the PA. Opportunistic subsurface soil samples were collected from the borings used to install the groundwater monitoring wells. Existing site injection wells were also sampled for groundwater. Surface water was collected from a sump associated with the FFTP. Sample results identified significant impacts from the FFTP. Results from several samples exceeded HALs and Hawaii Department of Health (HDOH) Environmental Action Levels (EALs) for PFAS. High levels of several PFAS compounds were identified in the sediments that remain within the FFTP, in the decision unit located around the FFTP, and from three decision units adjacent to the FFTP. Groundwater samples collected from a monitoring well located just down gradient from the FFTP contained significant levels of PFAS. The sump which received liquids that drained from the FFTP contained very high levels of PFAS as well. The large DUs located around DU-1, adjacent to the FFTP have significantly elevated levels of PFAS. It is likely that most of the contamination is associated with the area close to the FFTP and most of the area of the western side of the base have significantly lower levels than currently reported. Further delineation of this part of the base is warranted to resolve this. Low levels of PFAS which exceed the unrestricted EAL but were below the commercial/industrial limits were identified in all surface soil samples. No other COPCs were identified at concentrations of concern. All fieldwork was conducted with an approach to ensure the health and safety of the sampling team, base personnel, and the environment. Prior to the start of work, a comprehensive Health and Safety Plan was developed and followed throughout all work steps. The thirteen PFAS compounds (PFOS, PFOA, 6:2 FTS, PFDA, PFDoA, PFHps, PFHpA, PFHxS, PFNA, PFOSA, PFPeA, PFTrDA, PFUnA) detected their respective maximum contamination level in surface soils collected in parcel A likely represent different legacy formulations of AFFF used over several decades. 23. FIRMS INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE a' Element Environmental,LLC Aiea,HI Subconsultant (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE a' Mountain Methods,Inc. Tuolumne,CA Prime Consultant ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025—PAGE 36 F. EXAMPLE PROJECTS THAT BEST ILLUSTRATE E2'S QUALIFICATIONS FOR THIS PROJECT CATEGORY(10) 19 TITLE AND LOCATION (City and State) 20.YEAR COMPLETED Phase I and II Environmental Site Assessments,Honouliuli PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Wastewater Treatment Plant,Ewa Beach,Oahu,Hawaii 2016/2017 Ongoing 21. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NO. City and County of Honolulu Ms.Lisa Kimura,P.E. (808) 768-3486 Department of Design and Construction 22.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) Project Scope: Element Environmental, LLC (E2) was retained by Y :,,T ` "' 47 " ` - R.M. Towill Corporation (RMTC) to conduct Phase I and II ,i^� � Environmental Site Assessments (ESAs) on one parcel of M ` `lic- ', undevelo ed land located at Fort Weaver Road and Geiger Road .r ' P Hawaii. The City and County of Honolulu (CCH) : Ewa Beach, Oahu, � ;� ��° �,� �,',�• •; 4' owner and operator of the Honouliuli Wastewater Treatment Plant •; ;, a ` ,. -- (WWTP), acquired the 48-acre parcel of land to expand their ,:::#--,:p_,,,' f - ;� 44 , .i secondary treatment operations. In preparation for the proposed -� construction, E2 completed a Phase I ESA in 2016 to identify '_ , *- �F,r c, potential environmental issues which may impede construction ° , �/ ,,: activities on the newly acquired parcel. ''" - " The Phase II ESA scope of work was performed to evaluate the ,- '. ''`. �s presence/absence and nature of contamination on the site based on relevant findings of the Phase I ESA. Phase II ESA activities were Project Highlights: also conducted in the vicinity of an abandoned Navy fuel line E2 utilized incremental sampling located on the adjacent Honouliuli WWTP site, parallel to Geiger Road, where portions of the abandoned fuel line will be removed methodology to characterize surface soil at during the construction of a drainage basin. Phase II activities the site. included surface and subsurface soil sampling and evaluation of E2 evaluated the nature and extent of stockpiled soil/debris and a historical landfilled area. The subject waste materials discovered in the shallow property was historically used for railroad, plantation, and military dump site using an excavator. purposes. An abandoned Navy fuel pipeline is present on and/or Cost $331,100. adjacent to the southeast portion of the subject property. A second fuel line runs along the old railroad tracks, parallel to the north boundary of the subject property. Contaminants of potential concern were identified for the subject and adjacent WWTP property based on historical property use and included the following. • Former sugar cane cultivation-organochlorine (OC1) pesticides and arsenic. • Former railroad and plantation employee housing, former military use, and other former and current structures-chlordane and lead. • Petroleum pipelines on/adjacent to the site -petroleum-related constituents and metals. • Landfilling and soil/debris stockpiles - volatile and semi-volatile constituents, pesticides, metals, polychlorinated biphenyls (PCBs), and asbestos. • Miscellaneous industrial use-volatile and semi-volatile constituents,metals,and PCBs. Soil sample results were compared to State of Hawaii Department of Health (HDOH) Tier 1 Residential and Commercial/Industrial environmental action levels (EALs). Based on the Phase II ESA sample results and observations made during the investigation, E2 concluded the following. Subject Property: Lead and arsenic were detected in the surface (lead) in the decision unit(DU-9) (dump site) and near-surface (arsenic) soils at boring B9 on the subject property at concentrations exceeding HDOH Tier 1 EALs.The dump site (DU-9) appears to occupy a large shallow sinkhole. ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025—PAGE 37 F. EXAMPLE PROJECTS THAT BEST ILLUSTRATE E2'S QUALIFICATIONS FOR THIS PROJECT CATEGORY(10) 19 TITLE AND LOCATION (City and State) 20.YEAR COMPLETED Phase I and II Environmental Site Assessments,Honouliuli PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Wastewater Treatment Plant,Ewa Beach,Oahu,Hawaii 2016/2017 Ongoing 21. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b. POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NO. City and County of Honolulu Ms. Lisa Kimura,P.E. (808) 768-3486 Department of Design and Construction • Debris was observed mixed with the soil, and included glass and porcelain shards, bottles, basalt rocks, pots and other household cooking implements, pieces of rusted metal, and wood. • Petroleum-related analytes were not detected in subsurface soil samples collected from the capillary fringe in the soil borings located in the vicinity of the petroleum pipeline that runs adjacent to the north boundary of the subject property. • None of the tested analytes were detected in soil samples collected from the three soil stockpiles located in the north-central area of the subject property. This soil can be reused on-site as"clean"fill material. Adjacent Honouliuli WWTP Site: • None of the tested analytes were detected in soil samples collected from the soil borings located in the vicinity of the abandoned Navy fuel pipeline that runs along the south side of the Honouliuli WWTP, parallel to Geiger Road. • Petroleum-impacted material is not anticipated to be encountered within the excavation required for the proposed drainage basin construction. 23. FIRMS INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE a. Element Environmental,LLC Aiea,HI Subcontractor (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE b. R.M. Towill Corporation Honolulu,HI Prime Contractor ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 38 G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. EXAMPLE PROJECTS LISTED IN SECTION F 24. NAMES OF KEY (Fill in "Example Projects Key" section below before PERSONNEL 25. ROLE IN EXAMPLE PROJECT completing table. Place "X" under project key number for (From Section E,Block 11) participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 Ryan S.W.Yamauchi Senior Engineer Roger C.Aoki Senior Environmental Engineer ZOO ❑ 11111101110111 Matthew J. Neal Senior Environmental Scientist ® ❑ ❑ ❑ 0000ZZ Arlene H. Campbell Senior Geologist ZZZZ OZZZOZ Steven R. Spengler Senior Hydrogeologist ® ❑ ❑ ❑ 000000 Eric M. Lau Senior Environmental Engineer ❑ ❑ ❑ ® ❑ ❑ ❑ ❑ ❑ ❑ Bernice M. Balete Senior Environmental Engineer ZOO ❑ ® ❑ ❑ ❑ ❑ Marvin D. Heskett, III Senior Chemist ZDZ ❑ ❑ ❑ ❑ ❑ ® ❑ Candace K.Yamauchi Senior Environmental Engineer ZOO ❑ 11111101110111 Lindsay B. Mason Senior Environmental Engineer 11111101110111000111 Angela K. Peltier Senior Geologist ® Z ❑ Z ❑ Z Z Z ❑ Jodie C.A.Tsubone Civil Engineer ZDZ ® 000000 27. EXAMPLE PROJECTS KEY NO. TITLE OF EXAMPLE PROJECT(FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT(FROM SECTION F) Phase I and Phase II Environmental Site 1 Assessments, and Removal Action- Remediation of 6 Phase I Environmental Site Assessment 5 Acres, Former Voice of America Site, Maili, Oahu, 360 California Avenue,Wahiawa, Oahu, Hawaii Hawaii National Environmental Policy Act Compliance for Environmental Services for Kekaha Residential 2 Construction of a new Helipad at Kaena Point 7 Satellite Tracking Station, Oahu, Hawaii Lots, Unit 4 Subdivision Phase I and Phase II Environmental Site Assessments Phase I Environmental Site Assessment, 230 3 Mauna Kupu Station,Waianae Mountain Range, 8 Waianae, Oahu, Hawaii Mahiai Street, Hilo, Hawaii Island, Hawaii Assessment of the Wahiawa Irrigation System, Preliminary Environmental Assessment and 4 9 Site Inspection,USCG Air Station Barbers Point, Wahiawa to Waialua, Oahu, Hawaii Kapolei, Oahu, Hawaii Limited Hazardous Materials Survey, Building 1756, Phase I and II Environmental Site Assessments, 5 10 Honouliuli Wastewater Treatment Plant, Ewa 91-1071 Yorktown Street, Kalaeloa, Oahu, Hawaii Beach, Oahu, Hawaii ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025—PAGE 39 H.ADDITIONAL INFORMATION 28.PROVIDE ANY ADDITIONAL INFORMATION AT YOUR DISCRETION.ATTACH ADDITIONAL SHEETS AS NEEDED Element Environmental, LLC (E2) Element Environmental, LLC (E2) has been in business since October 2005. E2 offers a wide ELEMENT ENVIRONMENTAL.LLC range of environmental consulting, environmental engineering ➢ Established in 2005 ➢ Operating for 19 years design,and water resource evaluation services. ➢ Small Business E2 offers the personal attention and flexible decision-making ➢ 39 Personnel capabilities of a small business while providing the breadth of (Professional Engineers,Scientists, Chemists,Hydrologists,and Technical expertise and experience of a large firm. E2 personnel work closely Staff) with a wide range of clients. E2 provides innovative, cost-effective solutions using the latest PROFESSIONAL SERVICES PL.S)COMMUNITY PLANNING technology to obtain client objectives while complying with (ENVIRONMENTAL PLANNING, pertinent environmental regulations. E2 completed projects ENVIRONMENTAL ASSESSMENTS, throughout the State of Hawaii and the Pacific Rim for both the ENVIRONMENTAL IMPACT STATEMENTS) private sector and government clients. Name of Principal, Firm, and Principal Place of Business Ryan Yamauchi,P.E.,Principal-In-Charge Element Environmental,LLC 98-030 Hekaha Street, Unit 9,Aiea, Hawaii 96701 (Oahu) Office Phone: (808) 488-1200, Mobile: (808) 864-3952 Email: ryamauchi@e2hi.com Website: www.e2hi.com Education, Training & Qualifications of Key Personnel E2's personnel of thirty-nine (39) professionals have over 500 years of combined professional experience in environmental and AT-A-GLANCE PERSONNEL engineering services with seven (7) licensed professional engineers ➢ 7 Licensed P.E. (6 Hawaii-Civil) and one (1) licensed geologist.They are either life-long residents of ➢ 1 Licensed Geologist the State of Hawaii or have resided in the state for over 26 years.As ➢ 2 Ph.D. a result, the staff is intimately familiar with the local environment, BREAKDOWN(39 PERSONNEL) regulations, and community concerns. E2 personnel is comprised of ➢ 5 Civil Engineers engineers, hydrologists, geologists, environmental scientists, and ➢ 7 Environmental Engineers chemists. Most all individuals are college graduates with 21% ➢ 3 Geologists earning advanced degrees, five (5) master's degrees, and two (2) ➢ 1 Hydrogeologist/Hydrologist doctorate degrees received from prestigious universities including ➢ 8 Environmental Scientists Berkeley, Columbia University, Jacksonville University, ➢ 1 Chemist Massachusetts Institute of Technology, Michigan Technical ➢ 1 Chemical Engineer University, Mount Royal University, Purdue University, The ➢ 9 Technicians California Polytechnical University at San Luis Obispo, The ➢ 4 Administrative Staff University of Vermont, University of California at Los Angeles, UC Santa Cruz, University of Colorado at Boulder, University of Notre Dame, Vanderbilt University, Willamette University, and the STATE OF HAWAII DOH CERTIFIED University of Hawaii at Manoa. ➢ 22 Asbestos Inspectors ➢ 1 Asbestos Project Designer E2 is registered with the State of Hawaii, Department of Health ➢ 16 Lead Risk Assessors (DOH) as an Asbestos Entity (A-0120) pursuant to Hawaii ➢ 5 Lead Inspectors Administrative Rules, Chapter 11-504, and is also a certified Lead- ➢ 1 Lead Project Designer Based Paint Activities Firm (PBF-0032) pursuant to Hawaii _ Administrative Rules, Chapter 11-41.Attachment 3 provides E2's staff licenses and asbestos and lead certifications. ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025—PAGE 40 E2 has an asbestos project designer and inspectors, as well as a lead project designer, risk assessors, and inspectors. E2 has demonstrated its ability to manage and execute complex, multi-disciplinary, and concurrent task orders for various clients. E2's principals and Senior Project Managers each have over 26 years of experience in contracting, fee proposal preparation, project management, and subcontractor management E2's key senior personnel assignments include Program Manager, Ryan Yamauchi, P.E.,Technical Director/Quality Assurance Manager, Roger Aoki, P.E., Health and Safety Manager, Matthew Neal and Eric Lau, P.E.,Technical Manager(GIS/CAD). PROGRAM MANAGER Program Manager, Mr. Ryan Yamauchi, P.E., Principal-in-charge Mr.Ryan Yamauchi,P.E. will be responsible for contractual matters, fee proposal preparation ➢ Contractual Matters and negotiations for task orders, invoicing, and ensuring adequate ➢ Negotiations resources are provided for each task order. Mr.Yamauchi will be the ➢ Invoicing primary point of contact with the contracting officer. ➢ Ensure the project has adequate resources Technical Director/Quality Assurance Manager, Mr. Roger Aoki, ➢ Project Manager P.E., will be responsible for assigning the project managers and technical resources for each task order and tracking and ensuring TECHNICAL DIRECTOR compliance with project schedules and the technical aspects of the Mr.Roger Aoki,P.E. contract. Mr.Yamauchi and Mr.Aoki will have the authority to assign ➢ Assign Technical Staff additional resources, stop work, and institute changes to ensure ➢ Assure Project has Technical projects are completed safely, on time, and in compliance with the Resources contract requirements. Mr. Aoki will also oversee the Quality ➢ Contract Compliance Assurance (QA) of data and technical review of project deliverables. ➢ Quality Assurance He will oversee the project chemists assigned to each task order to ➢ Project Manager ensure laboratory data quality objectives are met and laboratory data are properly validated. HEALTH&SAFETY MANAGER Health and Safety Manager, Mr. Matthew Neal, will manage and Mr.Matthew Neal execute the Health and Safety Program for the contract. Mr. Neal will ➢ Execute Safety for Staff and oversee site-specific Health and Safety Plan preparation, assign Site Subcontractors Health and Safety Officers for each task order, conduct health and ➢ Health and Safety Plans ➢ Authority to Stop Work safety audits, verify personnel has the appropriate health and safety ➢ Project Manager training for the duties that they are assigned, and ensure subcontractor compliance with the contract's health and safety requirements and E2's Health and Safety Program. Mr. Neal will have PROJECT MANAGERS the authority to immediately stop work for safety reasons and ➢ Ms.Arlene Campbell,L.G. institute changes to the work procedures. ➢ Mr.Eric Lau,P.E. ➢ Ms.Bernice Balete,P.E. Depending on the nature of the task orders, Mr. Yamauchi, Mr. Aoki, ➢ Mr.Marvin Heskett,III and Mr. Neal may also serve as Project Managers on select task ➢ Ms.Angela Peltier orders. Senior Project Managers, Ms. Arlene Campbell, L.G., Mr. Eric ➢ Ms.Lindsay Mason,P.E. Lau, P.E., Mr. Marvin Heskett, Ms. Bernice Balete, P.E., and Ms.Angela Peltier may also be responsible for managing the technical staff assigned to the task order, managing, and coordinating team subconsultants working on the task order,and coordination and execution of all project tasks. Please refer to the following for additional information. Attachment 1 - Organization Chart Attachment 2 - Qualifications of Key Personnel - education,years of experience,certifications, and training Attachment 3 - Professional Licenses and Certifications Attachment 4-State of Hawaii Procurement Office, Certificate of Vendor Compliance and Good Standing Attachment 5 - Certificate of Liability Insurance ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 41 CLIENT REFERENCES E2 provides the following client references. Mr. Glenn Okamoto, P.E. Mr.John E. Sato, P.E. Project Manager Project Manager State of Hawaii Naval Facilities Engineering Systems Department of Agriculture Command 1428 South King Street (NAVFAC) Pacific Honolulu, Hawaii 96814 258 Makalapa Drive, Suite 100 Phone Number: (808) 973-9436 Honolulu, Hawaii 96860 Email: glenn.m.okamoto@hawaii.gov Phone Number: (808) 472-1394 Email: john.e.sato.civ@us.navy.mil Ms. Lureen Komoda, P.E. Mr. Carty Chang, P.E. Project Manager Chief Engineer City and County of Honolulu Department of Land and Natural Resources Department of Design and Construction Engineering Division 650 South King Street, 14th Floor 1151 Punchbowl Street, Room 221 Honolulu, Hawaii 96813 Honolulu, Hawaii 96813 Phone Number: (808) 768-8758 Phone Number: (808) 587-0230 Email: lkomoda@honolulu.gov Email: carty.s.chang@hawaii.gov Mr. Steve Joseph General Manager PVT Land Company Ltd. 87-2020 Farrington Highway Waianae, Hawaii 96792 Phone Number: (808) 668-4561 Email: steve@pvtland.com ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 42 Professional Services E2 has a history of completing projects throughout the State of Hawaii and Pacific Rim for both private and government clients for a variety of environmental, engineering, and water resources services. Over the last eighteen years, E2 has provided services to government agencies and private clients including the State of Hawaii, County of Hawaii, County of Kauai, County of Maui, and the City and County of Honolulu, NAVFAC Pacific, the U.S. Army Corps of Engineers;the U.S.Army Garrison Hawaii;the U.S. Coast Guard, Kamehameha Schools Bishop Estate, the Shell Oil Company, Getty Oil, Ball Corporation, and the Samsung Corporation. The large majority of E2's ongoing projects have been awarded by repeat clients who were satisfied with E2's abilities to control costs, provide high-quality work, and maintain and meet schedules. The following is a list of the professional services that E2 provides. Environmental Services • Environmental Compliance Audits and Pollution Prevention Planning • Phase I, II, and III Environmental Site Assessments (ESAs) • Environmental Site Investigations (SIs), Remedial Investigations (RIs), Remedial Designs (CERCLA and Resource Conservation Recovery Act [RCRA]) • Hazardous Materials Surveys including Asbestos and Lead-Based Paint(LBP) • Hazardous Waste Management and Corrective Action Studies • Soil and Groundwater Remediation • Landfill/Solid Waste: Permitting; Gas and Groundwater Monitoring, Reporting, and SIs; Fire Management; and Global Positioning System (GPS) Services • Integrated Solid Waste Management Planning • Underground Storage Tank(UST) Closures and Remedial Investigations • Dredged Material Testing and Evaluation • Water Quality Studies (including National Pollutant Discharge Elimination System [NPDES] Permitting and Monitoring) • Storm Water and Non-Point Source Pollutant Discharges • Environmental Assessments (EAs) and Environmental Impact Statements (EISs) • Environmental Permitting • Environmental Baseline Surveys (EBSs) • Risk Assessments • Biosolids Treatment and Composting • Phytoremediation and Mycoremediation • Geographic Information System (GIS)-based Mapping and Databases for Environmental Data Utilities Services • Design of Water Distribution,Transmission,and Treatment Systems • Design of Wastewater Collection,Treatment, and Disposal Systems • Design of Storm Drainage Collection and Disposal Systems Water Resources Services • Water Resource Planning • Well Site Selection • Hydrologic and Hydrogeologic Studies • Well Design and Permitting • Well Installation, Cleaning,Testing, Inspection, and Closure • Groundwater Monitoring • Groundwater Modeling ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 43 COUNTY OF HAWAII - PROJECT EXAMPLES Below is a summary table of professional services provided to the County of Hawaii. Project Year Contract Description Completed Amount County of Hawaii -Solid Waste Division E2 is currently gathering data,conducting interviews, developing recommendations,collaborating with stakeholders,and preparing a Feasibility Study report for the County of Hawaii Solid Waste Division. Future options to be considered: Solid Waste Operational • Curbside Recyclable Collection Analysis Study of the • Municipal Solid Waste(MSW)Landfill for west County of Hawaii (beside expanding WHSL)and east sides Department of Ongoing $499,782 • Construction and Demolition (C&D)Landfill for Environmental Big Island Management, Solid Waste • WTE, all forms and technologies Division • Barging MSW To H-POWER, or elsewhere. Residual ash back to Big Island if H-POWER • Materials Recovery Facility(MRF), both clean and dirty options • Expand WHSL • Separate Recycling Division to include Abandoned Vehicle Project mj Year Contract Description Completed Amount County of Hawaii - Wastewater Treatment Plants Kealakehe Wastewater E2 is currently preparing a Feasibility Study for the Treatment Plant Ongoing $394,800 Kealakehe Wastewater Treatment Plant to support the Feasibility Study, Kona United States Bureau of Reclamation Title XVI Program funding. Kealakehe Wastewater E2 collected 30 bulk samples for asbestos and 15 paint Treatment Plant 2022 $20,391 chip samples for lead,conducted a field investigation, and Headworks Upgrade, reviewed as-built plans and other available previous survey Kona reports. Prepared report. E2 conducted historical research,reviewed records, and conducted a site inspection of the Kealakehe Wastewater Pua Pump Station at Hilo Treatment Plan. E2 also prepared a Summary Letter and Wastewater Treatment 2022 $19,420 a Limited Asbestos and Lead Paint Survey Report Plant Hazardous Materials summarizing field sampling. E2 will prepare construction plans,specifications,and construction cost estimates to address closure of the UST and existing fuel lines if needed. ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 44 Project Year Contract Description Completed Amount County of Hawaii - Landfills E2 provided various consulting services at two closed landfills,including performing a geophysical survey, infra-red photography, and mapping to determine landfill boundaries and fire characterization,and preparing a landfill fire Closed Kona Landfill management plan. Prepared a Fire Monitoring landfill alternatives plan to evaluate fire control/extinction,waste mining, and other alternatives. Assisted with an U.S. 2016 $389,000 Environmental Protection Agency(EPA)-supported fire control pilot test to evaluate the efficacy of using waste excavation and the application of foam/water as a method to extinguish fire in landfill hot spots.Tasks included quarterly monitoring of landfill gas Closed Waimea Landfill and subsurface fire conditions, preparation of quarterly Fire Monitoring and annual monitoring reports, and periodic fire management activities (e.g., carbon dioxide [CO2] injection,landfill cover maintenance,and landfill fire response,etc.). E2 provided fire monitoring and control services for the Closed Kona Landfill closed Kona/Waimea/Waimea Landfills.The services Subsurface Landfill Fire included:landfill cover maintenance;bi-annual Monitoring and 2015 $260,000 inspections/quarterly monitoring,which includes Maintenance landfill gas sampling and reporting; semi-annual vegetation control; installation of new gas sampling probes; and fire control and response activities. E2 conducted quarterly or semiannual monitoring of all functioning probes at the Waimea Landfill. Monitoring activities was conducted in general accordance with the Landfill Management Plan and at the interval specified in the previous monitoring report. Monitoring included Closed Waimea Landfill collecting temperature and gas-composition data from Subsurface Landfill Fire 2015 $440,000 the gas probes,sinkholes,cracks,and other designated areas at the landfill, evaluation of the landfill surface and Monitoring soil cover maintenance, and evaluation of storm water runoff. Conducted an Infrared Survey and the results of the survey were included in the monitoring report. E2 will prepare monitoring reports with an annual summary included in the fourth quarter report. Summarized all monitoring activities at the site. E2 reviewed historical documents and project files for the Kona Landfill available from the County of Hawaii and the State regulatory agencies to help identify Closed Waimea and potential measures that could be taken to control and Closed Kailua-Kona 2015 $300,000 minimize burning/smoldering areas at the landfill. E2 Landfills prepared a written summary of historical and Fire Management environmental activities and provided a basis for recommendations for fire management options. E2 conducted an annual Infrared Survey to compare with landfill gas monitoring data to evaluate the subsurface ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 45 condition at the landfills. E2 conducted bi-monthly site visits to inspect the Kona landfill surface for new depressions, fissures, sinkholes, odor,smoke,and dead vegetation; and to document the overall conditions at the landfill. E2 conducted quarterly landfill cover maintenance at the landfills,which includes providing suitable cover material and backfilling sinkholes and/or cracks observed in the landfill. E2 conducted quarterly monitoring at the landfills,which includes collecting temperature and gas-composition data from the gas probes,sinkholes,cracks,and other designated areas at the landfill; evaluation of the landfill surface and soil cover maintenance; and evaluation of storm water runoff. Gas data and probe locations are entered into the Surfer® contouring and 3D surface mapping program to illustrate gas concentrations. Problematic areas are delineated based on the resultant gas contours and carbon dioxide is injected into the probes in and around those areas in order to suffocate the fire. E2 prepared quarterly monitoring reports to submit to the County summarizing landfill maintenance and monitoring activities. E2 facilitated the closure of portions of the landfill's dilapidated landfill gas extraction system in 2014 in hopes of reducing the amount of oxygen available to smoldering areas in the landfill. ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 46 ENVIRONMENTAL ENGINEERING - PROJECT EXAMPLES E2 staff can provide the County of Hawaii with the knowledge and technical expertise related to engineering as below. Sewage/Wastewater and Industrial Waste Collection Treatment, and Disposal Systems Investigations and Assessments ➢ Slug Prevention Plan for Commander Fleet Activities Sasebo. Japan. E2 evaluated facilities and activities with the potential to discharge or spill pollutants that could cause a slug load, which would impact the operation,maintenance, or management of domestic wastewater treatment systems. ➢ Non-Domestic Wastewater Management Plan for NAVFAC Hawaii. Joint Base Pearl Harbor-Hickam. Oahu. Hawaii. E2 initially screened over 8,000 facilities to determine if the facility discharges or could potentially discharge non-domestic wastewater to the collection system. After the initial screening, E2 inspected approximately 800 facilities to determine if non-domestic discharges were occurring and whether proper pretreatment is being completed. Site inspections and interviews with facility managers were completed for those facilities that were confirmed to have non-domestic discharges.The management plan included a list of the inspection findings along with design recommendations to eliminate, divert, and/or pretreat the discharges. Cost estimates to implement the recommendations were provided. E2 determined the maximum allowable headworks loading (MAHL) for the NAVFAC Hawaii Wastewater Treatment Plant (WWTP). E2 performed an assessment of the impacts of the non-domestic discharges on the NAVFAC Hawaii WWTP,the fate of non-domestic waste streams,sludge impacts (including disposal and potential reuse considerations), whole effluent toxicity impacts and WWTP removal efficiencies. Considering these assessments as well as outfall dilution, water quality standards in the Hawaii Water Quality Standards, and pertinent regulations specified in the National Pollutant Discharge Elimination System (NPDES) Permit, E2 will develop the MAHLs for chemical and biological pollutants of concern and provide recommended revisions to indirect discharge limitations. ➢ Waimanalo Wastewater Treatment Plant R-1 Reuse Feasibility Study. Waimanalo, Oahu. Hawaii. A Feasibility Study (FS) was completed for the United States of America Army Corps of Engineers and City and County of Honolulu to assess the technical, environmental, and economic feasibility of producing R-1 water at the Waimanalo Wastewater Treatment Plant for reuse in the Waimanalo community. The first component of the FS was a market survey that was completed to identify potential users in the community. The survey identified available potable and irrigation water sources; gauged interest from the potential users; gathered user concerns with R-1 water use; and identified potential R-1 water demands. The results of the market survey indicated strong interest in R-1 water reuse from the Olomana Golf Links, Waimanalo District Park, Waimanalo Beach Park, Honolulu Polo Club, and Waimanalo Wastewater Treatment Plant (WWTP).A conceptual design for the first phase of improvements was completed and identified the WWTP improvements,the distribution system improvements,and the end user improvements. ➢ Large Capacity Cesspool Closure. Hickam Field. Oahu. Hawaii. E2 completed the closure design for five Large Capacity Cesspools (LCCs) located within the former Hickam AFB portion of JBPHH. These active LCCs are located at Buildings 2115, 3510, 3220, 3004, and 3435. The design services included determining the closure requirements for the LCC, determining the alternative disposal method (i.e., replacement with septic tank/leach field, or connection to existing wastewater collection system, development of construction drawings, specifications, and detailed cost estimates for the closure of the LCCs as well as completion of draft LCC closure applications for the State of Hawaii Department of Health. The project included historical document review, topographic surveys, geotechnical investigations, and engineering services. E2 interviewed building tenants regarding their operations to determine the average and peak design flows for the new wastewater facilities. Percolation tests were completed at the three LCC sites that were ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 47 determined to require leach fields. One of the challenges for the project is the shallow groundwater table that is present at several of the sites located near the shoreline. The shallow groundwater requires the use of packaged pump stations to pump effluent from the septic tank to an elevated leach field. The relatively low flows (about 15 gallons per minute [gpm]) also required the design of packaged low flow progressive cavity pump stations. Waianae Agricultural Park Drainage Improvements. E2 completed the design of miscellaneous improvements to the drainage system at the Waianae Agricultural Park. The improvements included slope stabilization of drainage ways, diversion of runoff into an infiltration basin, design of overflow protection drainage intakes for the infiltration basin, and repairs to existing concrete drainage swales. During large rain events, debris being carried by stormwater has caused the primary drainageway intake to clog and flows to overtop the drainage system causing washout of the access road and drainageway slopes. To mitigate the blockage of the drainage intake, E2 designed diversion structures that will route stormwater into an infiltration basin.The diversion structures will allow for stormwater to enter the infiltration basin even with heavy debris build-up. An elevated backup drainage intake was also designed in the infiltration basin that will collect stormwater overflow and prevent overtopping of the drainageway. Other improvements included riprap stabilization of drainageway slopes. ➢ Pier 21 WWPS. Honolulu Harbor. Oahu. Hawaii. E2 prepared construction documents for the replacement of the existing packaged pump system at the Pier 21 WWPS with a new aboveground pumping system. The Pier 21 WWPS provides wastewater service to industrial facilities located along Pier 21 in Honolulu Harbor. The design included installation of new pumps and related appurtenances while allowing continued use of the existing influent wet well manhole present at the site. The design also included the replacement of the existing force main from the WWPS to the wye connection, which connects the force main to another existing force main. The total length of the designed replacement was approximately 500 feet. ➢ Kalewa Street WWPS. Oahu. Hawaii. E2 designed a new packaged WWPS and new dual relief force main for the Kalewa Street WWPS. E2 was responsible for evaluating present and future wastewater flows from the tributary, sizing and selecting the new packaged pump station, and completing construction documents for the new packaged WWPS and new dual relief force main (1,300 feet). Integral to the design was planning the phasing of construction, which would allow continued and uninterrupted use of the airport facilities by the tenants while the new WWPS and new dual relief force main is constructed. ➢ Lihue WWTP, Lihue, Maui. Hawaii. E2 compiled and analyzed data to quantify the amount of Inflow and Infiltration that is associated with rainfall events at the site. Predictive equations based on rainfall and flow-monitoring data were developed using multiple linear regression methods. The analysis was used to evaluate whether the sewer system had the necessary capacity for potential future development. The objective of this project was to determine if reserve or additional capacity still exists within Lihue's Wastewater Collection System for future developments within the Hanamaulu Triangle development. SewerCAD was used to model the Lihue wastewater collection system. ➢ Honouliuli WWTP Phase IC - R3 Water Reuse Pump Station Design. Ewa Beach. Oahu. Hawaii. E2 evaluated the R3 water system demands provided by the client and select an appropriate pumping system to meet demands. The design will include the selection and sizing of pumps; section of process control equipment, and pump station configuration. E2 will provide design calculations and text for the Basis of Design. E2 will also assist with construction cost estimates for the pump station. ➢ He`eia WWPS Improvements, Kaneohe, Oahu, Hawaii. E2 assisted in providing edits to the section for "Closure of Underground Storage Tanks" for required demolition work. E2 also provided a rough abatement cost estimate. E2 be provided services during bidding and construction Solid Waste Planning and Management ➢ Hazardous Waste Management Plan, Commander Fleet Activities Yokosuka. Japan. E2 developed a Hazardous Waste Management Plan (HWMP) in accordance with all the applicable regulations and requirements and conducted a Closure Plan for the HWSA and PCB Storage area for Commander Fleet ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 48 Activities Yokosuka. Field work associated with a detailed review of existing Hazardous Waste Documents; (i.e., HWMP, Polychlorinated Biphenyl (PCB) Management Plan, Spill Prevention and Response Plan, and existing pertinent documentation, and any other Hazardous Waste plans/reports/assessments (i.e., Hazardous Waste profile sheets [HWPSs], Hazardous Waste shipment logs, Hazardous Waste Accumulation Points [HWAPs] summary sheets, etc.). Field work associated with a detailed survey of all Hazardous Waste generation points, HWAPs, and HWSAs; and field work associated with an on-site review of existing Hazardous Waste procedures for characterization and verification testing. ➢ Hazardous Waste Management Plan, Marine Corps Base Camp Butler.Okinawa,Japan. E2 prepared a Hazardous Waste Management Plan (HWMP), Waste Analysis Plan (WAP), and Hazardous Waste Storage Area Closure Plan. The HWMP and WAP provide guidance on implementing a comprehensive plan for managing hazardous waste generated at Marine Corps Base Camp (MCB) Butler for each of the camps, tenants, and contractors in the Camp Butler area of responsibility. The plan assigns responsibility and provides guidance on waste management procedures to ensure proper management of Hazardous Waste and conformance with applicable hazardous waste regulations. The HWMP also establishes hazardous waste management procedures applicable to all military, civilian, and contractor employees at MCB Camp Butler. E2 toured each major tenant command to evaluate hazardous waste generating activities and hazardous waste accumulation points to assess proper management and characterization of waste streams. The plan provides recommendations on pollution prevention and hazardous waste minimization as well as recommendations to improve the overall Hazardous Waste Management program. ➢ Integrated Solid Waste Management Plan for U.S. Fleet Activities Sasebo. Japan. E2 developed an Integrated Solid Waste Management Plan (ISWMP) for Commander Fleet Activities (CFA) Sasebo. The CFA Sasebo existing ISWMP was updated including solid waste management programs (including source reduction, recycling, and composting) by optimizing their design and operation through an integrated analysis of all comprehensive, cost-effective alternatives. The ISWMP will aid CFA Sasebo in maximizing its non-hazardous solid waste diversion. Documenting, quantifying, and providing options for diverting food waste (food service (galley), restaurants, food courts, and commissary), wood, organics, and other recyclable material and maximizing the amount for revenue generated from the installation of Qualified Recycling Program (QRP). The plan will include estimated costs and timeframes for the implementation of installation-approved recommendations. The plan also provided ship off-load guidance criteria to control waste offloaded from homeport and to also provide a feasibility study of the QRP recyclables. The plan incorporated current Final Governing Standards, local, Department of Defense, Navy, and Federal laws, regulations, instructions, orders, and directives as well as innovative information about recycling, waste diversion,waste reduction awareness,composting,and affirmative procurement. ➢ Integrated Solid Waste Management Plan for Hawaii Army National Guard. Oahu. Molokai. Maui. Hawaii. E2 updated the existing Integrated Solid Waste Management Plan (ISWMP) dated October 2012 for Hawaii Army National Guard (HIARNG). E2 completed the Work Plan and Health and Safety Plans before conducting site visits. E2 conducted site visits to HIARNG Sites on Oahu, Molokai, Hawaii, and Maui. E2 updated the ISWMP with a contemporary and systematic approach to solid waste management at all HIARNG sites. IWSMP identified how to reduce, reuse, recycle, and manage waste that is protective of human health and the environment in local conditions. ➢ Integrated Solid Waste Management Plan Marine Corps Air Station Iwakuni, Japan. E2 prepared an Integrated Solid Waste Management Plan (ISWMP) that defined and documented the installation's current ISWMP, established goals for improving solid waste management, identified specific actions required to achieve the plan goals, promoted compliance with applicable Federal, Department of Defense, Marine Corps, and local solid waste management regulations and policies, and evaluated alternative designs for future solid waste management. Conducted field work that included a waste stream assessment, data collection, and evaluation to prepare the final ISWMP. ➢ Integrated Solid Waste Management Plan. Joint Base Pearl Harbor-Hickam. Oahu, Hawaii. E2 prepared an Integrated Solid Waste Management Plan (ISWMP) to define and document the installation's current ISWMP, establish goals for improving solid waste management, identify specific actions required to achieve the plan goals, promote compliance with applicable Federal, Department of Defense, and local solid ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 49 waste management regulations and policies, and evaluate alternative designs for future solid waste management. The ISWMP will aid Joint Base Pearl Harbor-Hickam in maximizing its non-hazardous solid waste diversion. E2 prepared a Work Plan and a Health and Safety Plan prior to the field work. The field work included waste stream assessment, data collection,and evaluation used to prepare the final ISWMP. Spill Prevention and Countermeasures Plans ➢ Spill Prevention.Control and Countermeasure Plan.Pier 2 Cruise Terminal.Honolulu. Oahu.Hawaii. E2 completed a Spill Prevention, Control and Countermeasure Plan (SPCC) for Pier 2 Cruise Terminal for the State of Hawaii, Department of Transportation, Harbors Division. E2 conducted a site visit for the location,prepared a site plan figure,and prepared the SPCC plan update. ➢ Spill Prevention and Response Plan for 12 Sites in Okinawa. Japan. E2 completed a Spill Prevention and Response Plan for Marine Corps Base Camp Butler, Okinawa, Japan. E2 inspected 324 aboveground storage tanks (ASTs), 29 underground storage tanks, 23 Chemical Storage Tanks, and 681 Electrical Transformers at 12 sites in Okinawa. E2 is currently preparing the reports. ➢ Annual Spill Prevention Control and Countermeasures Plan Inspections of NAVFAC Hawaii Aboveground Storage Tanks and Oil Drum Storage Areas. Joint Base Pearl Harbor-Hickam. Oahu. Hawaii (2013. 2015-Ongoing). E2 completed the inspection of 170 ASTs and oil drum facilities annually since 2015 and has prepared a report which included locations, conditions, and recommendations for each tank. ➢ Spill Prevention. Control and Countermeasure Plans for three Honolulu Board of Water Supply Sites. Kalihi Corporation Yard. Halawa Shaft, and Kunia Wells 1. Oahu. Hawaii. E2 conducted site visits and documented the capacity, type, contents, and condition of each ASTs/drums at three City and County of Honolulu Board of Water Supply sites; Kalihi Corporation Yard, Halwa Shaft, and Kunia Wells I. E2 prepared a separate SPCC plan for each of the three sites meeting the requirements of Federal Clean Water Act and Oil Pollution Act. ➢ Spill Prevention. Control and Countermeasure Plan Update. Joint Base Pearl Harbor-Hickam, Oahu. Hawaii. E2 completed a five-year update of the Navy SPCC plan for ASTs at all Navy facilities on Oahu, including Joint Base Pearl Harbor-Hickam (JBPHH)-Hickam Field and NAVFAC Hawaii facilities. A total of 456 ASTs were inspected and assessed by E2. An updated SPCC plan was developed for use by the Naval Supply Systems Command Fleet Logistics Center Pearl Harbor (NAVSUP FLCPH), NAVFAC Hawaii, JBPHH- Hickam Field, JBPHH-Naval Station, JBPHH-Wahiawa Annex, JBPHH-Lualualei Annex, Radio Transmitter Facility (RTF) Lualualei Annex, West Loch Annex, Beckoning Point, Kalaeloa, Pearl City Peninsula (PCP), and Manana Fire Station. E2 inspected and assessed 40 additional ASTs and integrated several more rounds of historical data into the SPCC Plan Update document that were not included in the Scope of Work, all at no additional cost to the Navy. E2 worked closely with NAVFAC Hawaii personnel to tailor the SPCC plan to specific Navy operations and to ensure the document could be easily used as a guide for Navy technical personnel and aid in spill prevention/response planning and management. Hazardous Materials, Asbestos, Lead Paint Surveys ➢ Asbestos and Lead-Based Paint Survey. Singapore Area Coordinator. Sembawang, Singapore. E2 is conducting Asbestos and Lead Based Paint Surveys of Family Housing (FH), Unaccompanied Housing (UH), and Navy Gateway Inns and Suites (NGIS). Lead dust wipe samples were collected from 80 NGIS units. Asbestos and lead paint sampling were conducted at 12 UH units. Asbestos and lead risk assessment/paint sampling or X-ray fluorescence (XRF) testing will be conducted for 188 wall panels in 61 FH units.Asbestos and lead risk assessment/paint sampling or XRF testing will be conducted at 113 FH units (76 buildings). Asbestos bulk and lead paint sampling or XRF testing, and a lead risk assessment will be conducted at 80 NGIS units. E2 prepared a Work Plan and Health and Safety Plan for the work, and has completed a portion of the field work. Detailed survey reports will be submitted upon completion of field work and laboratory analysis. ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 50 ➢ Asbestos Survey. Naval Base Guam. Guam. E2 completed an asbestos survey of 109 buildings with a total area of 1,014,904 square feet at Naval Base Guam. The work was completed in general accordance with applicable federal, Guam, and Navy laws, rules, regulations, orders, instructions, and industry- standard practice. E2 prepared a Work Plan and Health and Safety Plan prior to conducting field work.The field survey included the identification of Homogeneous Area (HAs), collection of survey information onto data sheets and building floor plans, collection of representative building material samples for each HA identified; collection of closeup and panoramic photographs of sample locations and assumed asbestos- containing material; and repair of sample locations. A total of 7,134 bulk samples were collected for laboratory analysis. For each building surveyed, E2 prepared a Draft and Final Survey Report, which included the findings in a summary data table, floor plans with approximate locations of samples taken, the extent of most HAs,a closeup and panoramic photo log of samples,and laboratory reports. ➢ Hazardous Materials Survey. Former Sears Store Unit. Windward Mall. Kaneohe. Oahu. Hawaii. E2 conducted a comprehensive demolition-level hazardous materials survey for the former Sears store unit. Suspect asbestos-containing material, lead paint, and arsenic-containing canec panels were sampled and submitted for laboratory analysis. The survey also included visual inventories of fluorescent light fixtures for PCB-containing ballasts, mercury-containing lamps, thermostats, and light switches. E2 prepared a report, including a review of as-built drawings, summary data tables, sample location figures, and sample photographs. ➢ Hazardous Materials Surveys. Honouliuli Wastewater Treatment Plant Secondary Treatment Project. Ewa. Oahu. Hawaii. E2 completed a hazardous material survey of over 30 buildings/structures that will undergo whole or partial demolition or renovation. Suspect asbestos-containing material, lead paint, and arsenic-containing canec panels were sampled and submitted for laboratory analysis.The survey also included visual inventories of fluorescent light fixtures for PCB-containing ballasts and mercury- containing lamps. E2 prepared a survey report,including summary data tables, sample location figures, and sample photographs. E2 also prepared hazardous materials specifications and construction cost estimates for the bid package, responded to requests for information,and reviewed pertinent contractor submittals. Hazardous Materials/Substances Site Investigations and Testing ➢ Phase I and II Environmental Site Assessments for Kaunakakai Harbor. Molokai. Hawaii. E2 completed a Phase I Environmental Site Assessment (ESA) of the State of Hawaii, Department of Transportation, Harbors Division owned portion of Kaunakakai Harbor to identify Recognized Environmental Conditions (RECS) based on historic and current land uses. A Phase II ESA was also completed to investigate the RECs. The Phase II ESA consisted of the collection of surface and subsurface MULTI INCREMENT® soil samples from four decision units across the pier area, and installation of eight groundwater monitoring wells and the collection of groundwater samples. The soil and groundwater samples were analyzed for petroleum-related contaminants, heavy metals, polychlorinated biphenyls (PCBs), and pesticides.A Phase II ESA report was prepared to summarize the sampling results. Prepared an Environmental Hazard Evaluation and Environmental Hazardous Management Plan to manage potential risks posed by contaminated soil to human health and the environment. ➢ Site Investigation at Former Molokai Electric Company and Galierher-Ono Parcels. Kaunakakai, Molokai. Hawaii. E2 conducted a site investigation (SI) of the former Molokai Electric Company (MOECO) site in downtown Kaunakakai. The SI included a comprehensive study of residual near and subsurface contamination from previous MOECO activities, primarily from chemicals of concern polychlorinated biphenyls (PCBs), and petroleum and heavy metals. E2 collected over 700 discrete soil samples as well as 88 MULTI INCREMENT® soil samples, soil-gas, concrete, and groundwater samples. In addition, E2 conducted a synoptic water level study in order to help determine the potential migration of subsurface contaminants. Prior to the completion of the field portion of the project, E2 completed two Special Management Area permit applications for the County of Maui for the project. The results of the SI will be used to determine the most appropriate remedial action for the site. ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 51 ➢ Puna Agricultural Park Phase I Environmental Site Assessment. Puna. Island of Hawaii. Hawaii. E2 completed a Phase I Environmental Site Assessment (ESA) for Puna Agriculture Park located in Puna, Hawaii Island, Hawaii for the DOA. The Phase I ESA was to identify environmental issues as part of a Puna Agricultural Park Feasibility Study of undeveloped land. E2 also drafted a Feasibility Study to determine the suitability of proposed parcels for agricultural use. E2 provided additional data collection from three parcels totaling 5,845 acres to support this Feasibility Study. E2 reviewed the existing conditions and conducted a market survey to determine public interest in developing the agricultural park. ➢ Navy Environmental Hazard Evaluation/Environmental Hazard Management Plans for Ford Island Fuel Farm and UST NS-29. Oahu. Hawaii. E2 completed an Environmental Hazard Evaluation (EHE)/Environmental Hazard Management Plan (EHMP) to identify and evaluate potential hazards to human health and sensitive ecological receptors posed by residual gasoline-impacted groundwater and/or soil identified at the Ford Island Fuel Farm and Underground Storage Tank(UST) NS-29 sites under current and potential future site conditions. The EHE/EHMPs were conducted in general accordance with the State of Hawaii Department of Health guidance and included a review of historic land use and environmental investigations conducted at the site, evaluation of the nature, magnitude, and extent of contaminants of potential concern, evaluation of potential negative impacts on human health and the environment posed by allowing contaminated media to remain in place, and a discussion of impacted media management and disposal of to prevent unmitigated exposure to human and ecological receptors. Based on the EHEs, a "No Further Action with Restrictions"status was recommended for both sites. Hydrographic Surveys/Dredged Material Evaluations ➢ Hydrographic Survey and Dredged Material Evaluation for Maintenance Dredging at the Inner Apra Harbor Entrance Channel.Alpha-Bravo Turning Basin. Finger Piers.And Lima. Mike, and November Wharves. Apra Harbor. Guam. E2 conducted a characterization of dredge-sediment at three Confined Disposal Facilities (CDFs); Orote Point, Field 5, and the Ship Repair Facility, to determine the suitability of the sediment for reuse/disposal. About 30 acres of vegetation were cleared or transects cut and surveyed. Over 30 MULTI INCREMENT® soil samples were collected from about 280,000 cubic yards of sediment material in the three CDF units.Unexploded ordinance clearance was required at each of the sites during all field operations. E2 managed multiple crews of both subcontractors and E2 personnel simultaneously. A Dredge Material Management Plan was completed detailing the results with possible reuse alternatives for the sediment. ➢ Apra Harbor Sediment Sampling and Hydrographic Survey Naval Base Guam. Apra Harbor. Guam. E2 completed a dredge material evaluation of the Northern Inner Apra Harbor area at Naval Base Guam. Four composite samples were collected from four project sub-areas; Alpha/Bravo Wharves, Entrance Channel, and Turning Basin area; Finger Piers; Lima/Mike Wharves; and November Wharf. A total of 20 locations were sampled to comprise the four composite samples. The composite samples were subjected to chemical and biological testing to determine if the sediment was suitable for ocean disposal at the designated Guam Deep Ocean Disposal site. Environmental Permitting and Environmental Compliance ➢ National Pollutant Discharge Elimination System Stormwater Permitting and Compliance. Various Locations. Statewide. Hawaii. E2 processed National Pollutant Discharge Elimination System (NPDES) permits for industrial facilities in Campbell Industrial Park, PVT Construction and Demolition Landfill on Oahu, and Princeville Landfill on Kauai. E2 has also processed NPDES permits for a private land owner in Kahala for the discharge of water and wastewater from decorative ponds and water features and for hydrotesting reservoir systems for the Honolulu Board of Water Supply. E2 also completed an industrial discharge connection permit to the City and County of Honolulu's municipal separate storm sewer system (MS4) for an industrial complex in Kalihi. ➢ 401 and 404 Water Quality Certifications (WQCs) for improvements and embankment repairs to the Barbers Point Kalaeloa Harbor. Oahu. Hawaii. State of Hawaii Department of Transportation Harbors ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 52 Division. E2 has experience with environmental permitting and certifications for compliance with Clean Water Act Sections 401 and 404. E2 has processed The 401 WQC was completed in coordination with the USACE Nationwide Permit 13 (NWP-13). ➢ 401 Water Quality Applicable Monitoring and Assessment Plan for Nuuanu Reservoir, Honolulu, Oahu,Hawaii. The Honolulu Board of Water Supply repaired the Nuuanu Reservoir No. 4.The reservoir is in Nuuanu Valley adjacent to the Pali Highway, State Route 61, approximately 4 miles northeast of downtown Honolulu. The Nuuanu Reservoir repair project consisted of four primary tasks which required water quality monitoring, reservoir dredging, repairs to the intake tower and gangway, an outlet pipe extension, and roadway and embankment repairs. The Water Quality Applicable Monitoring and Assessment Plan (AMAP) was designed to address monitoring for pollutants in the adjacent stream environment during construction activities and to ensure Best Management Practices are working to minimize potential impacts. Water Quality Studies/Storm Water Monitoring and Planning E2 has completed storm water monitoring for Total Maximum Daily Load (TMDL) compliance and for industrial site runoff compliance in accordance with Navy Region Hawaii's municipal separate storm sewer system (MS4) National Pollutant Discharge Elimination System (NP DES) permit annually since 2015. E2 has also completed or is completing several storm water investigations, assessments, and management projects for NAVFAC Hawaii as follows. ➢ Storm Water Management Plan for Commander Navy Region Hawaii, Joint Base Pearl Harbor- Hickam, Oahu, Hawaii. E2 prepared a Storm Water Management Plan (SWMP) for Commander Navy Region Hawaii in accordance with their National Pollutant Discharge Elimination System (NPDES) permit. The SWMP contained several program components including public education and outreach, illicit discharge detection and elimination, construction site runoff control, post construction storm water management, P2 and good housekeeping, storm water monitoring, and reporting. Storm Water Pollution Control Plans were developed for over 100 industrial facilities as part of the SWMP. ➢ Storm Water Management Plan for Marine Corps Base Hawaii Kaneohe Bay, Oahu, Hawaii. E2 prepared a Storm Water Management Plan (SWMP) for Marine Corps Base Hawaii Kaneohe Bay in accordance with their National Pollutant Discharge Elimination System (NPDES) permit. The SWMP contained several program components including,public education and outreach, illicit discharge detection and elimination, construction site runoff control, post construction storm water management, P2 and good housekeeping, storm water monitoring, and reporting. Storm Water Pollution Control Plans were developed for 25 industrial facilities as part of the SWMP. ➢ Illicit Discharge Survey for Commander Navy Region Hawaii,Joint Base Pearl Harbor-Hickam,Oahu, Hawaii. E2 completed an illicit discharge survey for non-storm water discharges to the Commander Navy Region Hawaii (CNRH) municipal separate storm sewer system (MS4) and waters of the United States of America. The survey was completed in accordance with the National Pollutant Discharge Elimination System (NPDES) permit issued to CNRH. The scope included the inspection of over 1,300 facilities located throughout Joint Base Pearl Harbor-Hickam. The inspections included an assessment of facility operations and work practices that may result in illicit discharges as well as inspections of the storm drain system during dry weather to determine if illicit connections are present. E2 completed the inspections and developed recommended corrective actions and associated preliminary cost estimates based on the survey findings. ➢ Hickam Field Industrial Facility Inspections for Storm Water Compliance, Oahu, Hawaii. E2 completed annual inspections of 38 industrial facilities located within 54 buildings at Hickam Field to determine if facility operations were in compliance with NPDES permit requirements. Facility managers were interviewed and facility inspections were completed in order to identify good housekeeping and best management practices (BMPs), the availability of spill response procedures and spill kits, existing erosion control measures, hazardous materials and hazardous wastes stored on site, material inventory, condition ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 53 and types of storage lockers and containers for hazardous materials and hazardous wastes, current industrial work activities and work practices, evidence of spills and/or leaks, evidence of dry weather flows and illicit connections, and condition of existing storm drain inlets. Deficiencies were noted and recommended corrective actions including additional BMPs were identified. ➢ Total Maximum Daily Load Study Wahiawa Annex. Oahu. Hawaii. E2 served as the principal investigator for a Total Maximum Daily Load (TMDL) study for Joint Base Pearl Harbor-Hickam (JBPHH)- Wahiawa Annex. This monitoring work was conducted to comply with the terms of National Pollutant Discharge Elimination System (NPDES) Permit for the Navy's municipal separate storm sewer system (MS4). Cutthroat flumes were installed at three areas where runoff exits the facility and flows towards Kaukonahua Stream to allow quantification of the volume of flow exiting the installation. Water quality monitoring of the runoff has been conducted for 2.5 years for Total Nitrogen and its components (ammonia, Kjeldahl nitrogen, and Nitrate/Nitrite as N), turbidity and Total Suspended Solids (TSS)). A predictive analytical model was developed for JBPHH-Wahiawa Annex that allows calculation of the daily nitrogen & turbidity loads exiting the facility towards Kaukonahua Stream using continuous rainfall data collected at the installation. This model will save the Navy money complying with the terms of their NPDES permit. Potable Water Source, Treatment, and Distribution Assessments ➢ Lead in Drinking Water Testing at Priority Areas Joint Base Pearl Harbor-Hickam and Naval Computer and Telecommunications Area Master Station Pacific JBPHH and NCTAMS Pacific. Wahiawa. Oahu. Hawaii. E2 conducted drinking water testing for lead as a protective measure at several priority areas and various schools and childcare facilities on Navy Installations. Quick turnaround times were required for sampling, laboratory analysis, and notifications. Initial site investigations were conducted to develop a comprehensive two-step sampling plan, in accordance with updated Navy directives and Environmental Protection Agency guidance. Field work involved multiple visits to each facility to prepare and sample over 700 drinking water outlets, conducted during evenings and weekends to minimize the impact on facility operations. Upon completion of the two-step sampling process, corrective actions were immediately developed and provided to the Navy. A Project Summary Report documented the work and findings. ➢ Potable Water Master Plan for Commander Fleet Activities Okinawa for NAVFAC Pacific. Okinawa. japan. The Potable Water Master Plan (PWMP) consisted of an engineering evaluation of the condition, reliability, and quality of the installation's utility system, and the system's capability to meet present and future requirements. The Commander Fleet Activities Okinawa areas evaluated under this study included Camp Shields, White Beach, Awase Transmitter Site, and Tengan Pier. Field investigations were conducted at the facilities to verify water system components, review drawings, obtain water meter readings, and interview facility personnel. Pressure recorders were installed on select fire hydrants in the distribution system and fire hydrant flow tests were completed to obtain pressures at various locations in the distribution system to aid with the calibration of a computer model. ➢ Water Efficiency Survey for the United States Army Corps of Engineers Honolulu Engineer District. Oahu.Hawaii. The Water Efficiency Survey assessed 29 facilities within Fort Shafter and Fort Shafter Flats with the purpose of identifying water uses and potential water conservation options to meet the U.S. Army Garrison (USAG) Hawaii's sustainability goals. The surveyed facilities included office and industrial buildings, various community and activity centers, barracks, housing, the Hale 'Ikena restaurant, and the golf course. In addition to indoor fixtures,the scope of work included a landscape survey at Palm Circle and the golf course. The collected data were used to identify potential water savings, and repair and capital improvement projects that merit further consideration and exploration by USAG Hawaii. If implemented, the repair and capital improvement projects identified during the survey would result in water savings of approximately 9%annually or 16 million gallons per year with a resultant payback period of one year. ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 54 Air Quality and Monitoring Studies Ozone-Depleting Substances Inventory and Management Plan for Naval Air Facility Atsugi, Japan. E2 updated the air source inventory to include all Ozone-Depleting Substances (ODS) containing units regulated or potentially regulated by the Japan Environmental Governing Standard (JEGS) and air emission sources (except ODS) that are regulated by the JEGS. Field work for the project was completed in 2017 and included verification of over 2,400 refrigerant and air emission sources at almost 230 facilities (70 additional facilities from the initial scope of work). Based on the results of the field work, E2 and HDR prepared an updated air source inventory database and maps of survey results, which were included in a Field work Summary Report. The field work findings were then used to update the ODS Management Plan (title changed to "Refrigerant Management Plan (RMP)") to reflect revisions to applicable regulations. Responsibilities included preparation of the Work Plan, completion of field inspections, preparation of the updated air source inventory database and maps, Field work Summary Report, and quality assurance review of the RMP. ➢ Long-Term Groundwater and Soil Vapor Monitoring Red Hill Bulk Fuel Storage Facility. Joint Base Pearl Harbor-Hickam. Oahu. Hawaii. E2 completed groundwater monitoring and soil vapor monitoring at the Red Hill Bulk Fuel Storage Facility. E2 conducted quarterly LTM groundwater monitoring and sampling of ten wells located inside and in the vicinity of the Red Hill Bulk Fuel Storage Facility tunnels. E2 worked closely with the Navy to streamline the quarterly reports and conducted several informational meetings for the Navy regarding the interpretation of analytical data. E2 is currently conducting monthly soil vapor monitoring of 48 soil vapor probes within the tunnel and has conducted maintenance and upgrades to the system at no additional cost to the Navy. Quarterly groundwater monitoring reports were completed during the groundwater long term monitoring and monthly soil vapor reports are completed following each field event. ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 55 CIVIL ENGINEERING - PROJECT EXAMPLES E2's civil engineering design experience includes the Design of Water Distribution, Transmission, and Treatment Systems, Design of Wastewater Collection, Treatment, and Disposal Systems, Design of Storm Drainage Collection and Disposal Systems. Example projects include the following. ➢ Construction of the Pier 29 Container Yard. Honolulu. Oahu. Hawaii. Construction improvements which included a new pavement structure were completed at Pier 29 to accommodate a new container yard. As a subconsultant to RMTC, E2 prepared design specifications for the handling of contaminated soil and groundwater to be encountered during the construction. Historic releases of petroleum products have led to contamination in both the soil and groundwater including the presence of free-floating products on the groundwater surface. E2 also prepared design specifications to address air monitoring during construction and the removal of abandoned fuel pipelines that may be encountered. E2 participated in coordination meetings with the Harbors Division and the IDPP. The project design team received a commendation letter from HDOT Harbors after the construction was completed. *COMMENDATION LETTER- EXCELLENT PERFORMANCE* ➢ Reconstruction/Replacement of Sewers. Ho`omaluhia Botanical Gardens, Kaneohe, Oahu, Hawaii. Completed planning, design, and preparation of construction documents for the reconstruction/replacement of existing sewer lines. Phase I included the cleaning and inspection of CCTV in accordance with the Pipeline Assessment Certification Program. Phase II assessed the sewer line deficiencies from the CCTV data, developed rehabilitation/replacement alternatives for the system, prepared schematic, and concept drawings for the recommended alternatives, and prepared a cost estimate for the recommended improvements. Phase III, E2 is preparing construction documents. ➢ Sand Island Wastewater Treatment Plant Site Assessment and Remedial Design. City and County of Honolulu. E2 conducted a site investigation and Toxic Substances Control Act (TSCA) cleanup of contaminated soil. Responsibilities included overall project management, coordination of subconsultants, development of the technical approach for all environmental investigations and the remedial design and negotiating with the USEPA Region 9 and the State Department of Health (DOH) for all investigative and remedial activities. Supervised the preparation of the Phase I Environmental Site Assessment (ESA). Conducted and prepared the Phase II ESA, the Human Health Risk Assessment, the TSCA Notification Remediation Report, and the Soil Management Plan. Prepared construction plans and specifications and a construction cost estimate for the TSCA remediation. Performed services during construction including oversight and review of the TSCA cleanup. Coordinated the investigation and cleanup work for the two ongoing construction projects. Negotiated with the USEPA Region 9 and the State DOH throughout the duration of the project to allow construction to proceed concurrently with the investigation and cleanup. A follow- on remedial design including the completion of construction documents for the reuse of remaining low level PCB contaminated soil was completed for 76,000 cubic yards of stockpiled soil. Mr. Yamauchi served as the senior design engineer and designed a geofabric retaining wall system to contain the contaminated soil,which allowed for immediate future use of the site as a construction staging area. ➢ Waianae Agriculture Park Drainage Improvements.Waianae, Oahu. Hawaii. E2 completed the design of miscellaneous improvements to the drainage system at the Waianae Agricultural Park. The improvements included slope stabilization of drainage ways, diversion of runoff into an infiltration basin, design of overflow protection drainage intakes for the infiltration basin, and repairs to existing concrete drainage swales. Responsible for preparation of construction documents (i.e., plans and specifications) and services during bidding and construction. The construction plans were completed on an accelerated schedule to meet the funding requirements for construction. ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 56 HYDROLOGY/GROUNDWATER MODELING - PROJECT EXAMPLES E2 has conducted hydrogeological studies involving groundwater availability assessments for potable water systems and contaminant fate and transport within groundwater aquifers over the past years. Some of these projects are listed below. ➢ Hydrogeological Study to Determine Impact of MILCON P-184 Reject Water. Diego Garcia. British Ocean Territory. E2 conducted a hydrogeologic study to evaluate the potentially harmful impact to the water supply aquifer in the Cantonment Area on Diego Garcia resulting from the disposal of reject water created by the recently constructed nanofiltration plant. ➢ Makua Valley Numerical Modeling Study. Makua, Oahu. Hawaii. A surface water and groundwater modeling study was performed for the live firing range at Makua Valley. The simulation results were used to estimate future environmental impacts resulting from releases of munitions-related chemicals during live fire training exercises conducted by the Army within the range. Streamflow and groundwater data collected from wells and monitoring devices were used to calibrate the numerical groundwater (MODFLOW/MT3D/SEAWAT) and watershed runoff (GSSHA/WMS) models used. The simulation results were integrated into an EIS prepared for the firing range. ➢ Numerical Modeling Study for Proposed Field Optimization Phase Injections. E2 conducted a series of modeling simulations to evaluate the effects resulting from the injection of an oxidant (sodium persulfate) into a contaminated, shallow unconfined aquifer. The oxidant was being injected in order to induce the chemical breakdown of the dissolved phase contamination (predominately benzene) present at a former industrial property. The 2-D, finite difference BIOPLUME III model was used to simulate the degradation of benzene resulting from the injection of the oxidant compound into four injection wells screened in the shallow aquifer on the property over a one-week treatment period. The model was used to simulate the change in benzene concentration in the shallow aquifer over a six-month period after the oxidant was injected.The numerical simulation results were used to allay the concerns of surrounding property owners about the effect of the proposed remediation approach on the groundwater quality on adjacent properties. ➢ Hoakalei Lagoon Groundwater Modeling Project.Ewa Plain.Oahu. Hawaii. E2 conducted a hydrologic study to estimate the flux of groundwater entering a recently constructed lagoon located in the Ewa Plain of the island of Oahu. A density-dependent, numerical groundwater model (SEAWAT) was created for the area to estimate the groundwater influx rate into the lagoon.The model was calibrated using average water levels and recent vertical chloride concentration profile data measured in monitoring wells located in the vicinity of the lagoon. The model-derived groundwater flux data was combined with groundwater nutrient data to develop a maintenance program to limit the spread of an algal species, Chara spp. (muskgrass), within the lagoon while maintaining sufficient biomass of algae to maintain the good clarity and low overall nutrient levels present in the lagoon water. ➢ Additional scientific projects related to hydrology that E2 has previously conducted related to the movement, distribution, and management of water including the water cycle, water resources, and drainage basin sustainability are described below. ➢ Investigation of Central Maui Landfill.Maui. Hawaii. The purpose of the project involved analyzing the existing groundwater monitoring well network at the County of Maui Landfill (CML) and designing an improved monitoring network that is approved by the regulators at the State of Hawaii Department of Health (DOH). To accurately locate additional compliance monitoring wells at the facility, a two-month duration synoptic water level study was conducted on the existing network of monitoring wells as well as at the new water supply well. The tops of the existing compliance monitoring wells were resurveyed to allow delineation of the subtle gradient of the deep basal groundwater aquifer(-300 feet to water from the landfill surface) that underlies the CML. The overall direction and magnitude of the groundwater system underlying the landfill determined during the synoptic study were then used to design a compliance well ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 57 network for CML that effectively monitors potential landfill impact on the basal groundwater aquifer beneath the CML. ➢ Hydrogeologic and Condition Assessment for Kokee and Kekaha Ditch Systems. Waimea. Kauai. Hawaii. E2 collected physical inventory information and stream flow measurements for both ditch systems to assist the Commission on Water Resource Management (CWRM). Assisted the CWRM in the matter of the Complaint for Dispute Resolution and Complaint for Declaratory Order Against Waste in the Waimea River and its Tributaries filed by Earthjustice on behalf of Poai Wai Ola and the West Kauai Water shed alliance. E2 investigated and conducted fact-gathering work that included meetings with the parties pertaining to the complaint, conducting an inventory and assessment of the existing infrastructure of the Kokee and Kekaha Ditch Irrigation Systems, measuring and monitoring streamflow throughout both systems, assessing the existing uses of water from both systems and preparation of a comprehensive report describing the findings from these assessments to the Commission. ➢ Waimanalo Wastewater Treatment Plant R-1 Reuse Feasibility Study. Waimanalo, Oahu. Hawaii. A Feasibility Study was completed for the US Army Corps of Engineers and City and County of Honolulu to assess the technical, environmental, and economic feasibility of producing R-1 water at the Waimanalo WWTP for reuse in the Waimanalo community.The first component of the FS was a market survey that was completed to identify potential users in the community. The survey identified available potable and irrigation water sources; gauged interest from the potential users; gathered user concerns with R-1 water use; and identified potential R-1 water demands.The results of the market survey indicated strong interest in R-1 water reuse from the Olomana Golf Links, Waimanalo District Park, Waimanalo Beach Park, Honolulu Polo Club, and Waimanalo WWTP. A conceptual design for the first phase of improvements was completed and identified the WWTP improvements, the distribution system improvements, and the end user improvements. ➢ Water Supply and Numerical Analysis of the Mahukona Aquifer System in Kohala. Hawaii. A potable water source assessment was completed for the Mahukona aquifer system. A detailed, GIS-based water budget recharge analysis was performed for this aquifer system, located in an area undergoing rapid development. A 3-D, density-dependent numerical flow model (SEAWAT) was used to predict the increase in salinity within the aquifer that will result from the projected future increases in groundwater withdrawal from the aquifer system. ➢ Groundwater Availability Assessment. Kawailoa, Oahu. Hawaii. A potable water source assessment was completed for the 40.75-square mile Kawailoa property owned by Kamehameha Schools on the North Shore of Oahu. The groundwater availability for the area was determined by creating a GIS-based model that accounted for spatial variation in rainfall, evapotranspiration, irrigation, crop, and soil type, as well as the temporal variation in rainfall and evapotranspiration across the property. ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 58 COMMUNITY PLANNING — PROJECT EXAMPLES E2 provides comprehensive services for planning studies and master plans. E2 has prepared environmental documents under NEPA, compliance with federal and state environmental laws and regulations, and has an understanding of Section 7 of the Endangered Species Act and Section 106 of the National Historic Preservation Act,Air Quality,Water Quality/Water Quality Permits, Benthic Communities, Biological Assessments, Essential Fish Habitat, Land Use, and Infrastructure. E2 has direct significant experience in completing NEPA documentation and processes for Federal and State interests in Hawaii. E2 engineers and environmental professionals, along with specialty team members, provide substantial expertise in supporting natural and cultural resources assessments and consultations, with successful completion of agency/stakeholder interactions and detailed technical investigations, documentation, and formal clearance. The E2 team can also provide expertise in water resources planning and application of a systems approach,with representative project experience in Hawaii,Japan,and the United States. ➢ Site Investigation at Former Molokai Electric Company and Galierher-Ono Parcels. Kaunakakai, Molokai. Hawaii. E2 conducted a Site Investigation (SI) of the former Molokai Electric Company (MOECO) site in downtown Kaunakakai. The SI included a comprehensive study of residual near and subsurface contamination from previous MOECO activities, primarily from chemicals of concern polychlorinated biphenyls (PCBs), and petroleum and heavy metals. E2 collected over 700 discrete soil samples as well as 88 MULTI INCREMENT® (MI) soil samples, soil-gas, concrete and groundwater samples. In addition, E2 conducted a synoptic water level study in order to help determine potential migration of subsurface contaminants. Prior to completion of the field portion of the project, E2 completed two Special Management Area (SMA) permit applications for the County of Maui for the project. The results of the SI will be used to determine the most appropriate remedial action for the site. Responsibilities included Project Management, completion of the SMA permits, field oversight and coordination, drafting of the WP/SAP and a final report. ➢ Puna Agricultural Park Feasibility Study and Phase I Environmental Site Assessment. Puna. Island of Hawaii. Hawaii. E2 completed an Environmental Site Assessment (ESA) and prepared a Feasibility Study (FS) for the development of an agricultural park in Puna, Island of Hawaii. The three parcels at the site encompass a total land area of 5,845 acres. E2 reviewed the existing conditions and conducted a market survey to determine public interest in developing the agricultural park. ➢ Remedial Investigation/Feasibility Study for Quarry Pit Landfill. Marine Corps Base Hawaii. Kaneohe. Oahu. Hawaii. This project involved landfill and soil cover characterization using geophysical survey and intrusive verification methods; soil, groundwater, soil gas, and sediment investigation and sampling; and site assessment and characterization using discrete and MULTI INCREMENT® sampling as part of the Remedial Investigation/Feasibility Study process to evaluate future remedial alternatives. Identified historic land use, reviewed previous construction and environmental work, project design and planning,data management and evaluation, and prepared report ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 59 Ability to Meet Schedules Not all E2 personnel are currently being utilized full-time. E2 is actively pursuing new work and has the capacity to provide Environmental Engineering consulting services to the County of Hawaii. In addition, E2 has extensive partnering experience with several independent consultants (engineers, geologists, and field technicians) and subcontractors whom we can rely on to assist as needed with periodic work overloads, producing high-quality deliverables while under E2 management. E2 has an excellent history of meeting schedules within the allotted project constraints by submitting deliverables on time or in advance of client deadlines. jimm DISCIPLINES I NAME OF FIRM Civil Engineering and Surveying R.M. Towill Corporation Surveying ControlPoint Surveying, Inc. Drilling Services GeoTek Hawaii, Inc. Civil Engineering HDR, Inc. Environmental Planning HHF Planners Waste Management, Environmental Construction Pacific Commercial Services Analytical Services Eurofins,TestAmerica Laboratories,APPL, Inc.,Torrent Laboratory, Inc., Enthalpy Analytical Asbestos and Lead Paint Analytical Services SGS Forensic Laboratories Data Valuation Laboratory Data Consultants, Inc. ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 60 Cost Control E2 is conscious of our role as stewards of our client's funds and is committed as partners to meeting the challenge of"doing the best with less". We control project costs through realistic cost estimating, competitive procurement of materials and services, developing and implementing innovative methods and design, and using cost accounting tools. Every project is approached in the following manner. Cost Estimating. E2 cost estimating is done by senior staff with years of relevant experience. An accurate and realistic project cost estimate is a key component to controlling project budgets. Competitive Procurement. E2 seeks competitive bids for procuring goods and services for subcontracted work. Whenever possible preferential consideration is given to small, small disadvantaged or women-owned small businesses. Cost Accounting Tools. E2 is committed to a disciplined approach to controlling project costs and schedules using our fully automated, interactive, Intaact Project Management Information System (PMIS). PMIS integrates planning, scheduling,cost control,budgeting, and cost accounting. Value Engineering. E2 approaches each project as a value engineering project, whether the value engineering is done informally with our in-house staff or formally utilizing the third-party process. Clients are assured that when alternatives are recommended, the recommendation is based on the collective wisdom of a team of experienced professionals. Quality of Work E2 is committed to providing clients with quality service and work products. This is achieved through the implementation of a Quality Assurance/Quality Control (QA/QC) system by the Senior Management of the firm. E2's project planning process calls for the development of detailed project schedules that identify task and milestone completion dates and strict adherence to quality and cost control programs. Schedules are discussed and agreed upon by all parties involved with the project. Once schedules are in place, monitoring becomes the key responsibility of the project manager. Deviations from the schedule are assessed by the project manager and brought immediately to the client's attention. The repeat work received from clients of E2 is the best indicator of success at controlling the quality of our projects. E2's QA/QC program consists of a series of reviews for every project within the firm. Mr. Aoki is responsible for overseeing this program and ensuring that the independent review is unbiased and utilizes Value Engineering techniques. These independent reviews are conducted at every submittal stage from concept to final design. The following is a checklist utilized by our QA/QC managers: Compliance: Assuring the design is in accordance with all applicable design standards, codes, environmental regulations, etc. Feasibility: Assuring the investigation/design is feasible in accordance with the client's budget Errors and Omissions: Assuring the elimination of errors and omissions that could result in change orders and possible liability. Correctness and Clarity: Assuring that plans and reports are clear and correct. Appearance: Assuring that the plans and GIS maps are prepared in accordance with the drafting standards of the client and comply with their profession's standards. Comments generated through our QA/QC program are discussed with the design team and incorporated into the plans and specifications and/or reports prior to submission to the client. E2 has also established a QA/QC Manual for its contracts. The QA/QC Manual establishes the quality systems to be used on contracts. It also establishes the positions and personnel responsible for the implementation of the quality systems. The QA/QC Manual defines the lines of authority and the QA/QC personnel responsibilities. The QA/QC Manual outlines the QA/QC tasks to be implemented, provides QA/QC checklists and forms to be completed, and provides procedures for the implementation of corrective actions. The QA/QC Manual includes the following sections that identify the quality systems to be used: 1.) Introduction; 2.) Organization and Responsibilities; 3.) Quality Control Program Scope; 4.) Personnel Training and Qualifications; 5.) Procurement Control and Supplier- ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 61 Subcontractor Evaluation; 6.) Procedures, Instructions, Drawings and Technical Documents; 7.) Document Control; 8.) Chemical Sampling and Analysis Controls; 9.)Waste Management; 10.) Identification, Control, and Correction of Nonconforming Conditions; 11.) Records Management; 12.) Quality Audits and Surveillances Examples of quality systems that will be implemented include: • Fee Proposal Preparation - As mentioned in the key personnel section, fee proposals will be prepared by the Program Manager with assistance from the Technical Director, Senior Scientist, and other key Senior Project Managers who have the requisite project experience and technical knowledge to understand the various project complexities and develop a technical approach that will meet the project objectives and contract requirements. All fee proposals will be reviewed by the Technical Director or a Senior Project Manager who was not involved in the initial proposal preparation to provide an objective review. The Program Manager will then complete a second back-check prior to submittal. • Planning Documents and Reports - All planning documents and report submittals will go through a three- phase review process. The first review will be by a Technical Editor.The second review will be by a Senior Project Manager not involved in the document preparation to provide an objective review.The third review will be by the Project Manager. • Field Audits - Field audits may include Health and Safety audits by the Health and Safety Manager, and audits of field sampling procedures and field notes documentation by the Project Chemist, Senior Scientist, or QA Manager. • Laboratory Analytical Data - E2 will utilize third-party data validation of laboratory analytical data when appropriate. • Communications - Regular staff meetings will be conducted to discuss and improve the project procedures and communicate new procedures to be implemented and changes to contract requirements and regulations. The QA Manager will be responsible for ensuring that the quality systems and procedures provided in the QA/QC Manual are followed. The Program Manager will assist the QA Manager by providing the necessary resources and staff to implement the QA/QC Program and providing the project staff with the resources and training required to accomplish their assigned duties. Innovative Technologies E2 personnel have applied a wide array of innovative technologies and characterization tools to facilitate the cost- effective characterization and remediation of sites containing hazardous materials. E2 personnel used portable XRFs to delineate areas of elevated heavy metals contamination in a cost-effective manner in backyards of homes in agricultural areas on Kauai,in public parks and preschools on the Big Island, at a former military site in leeward Oahu, and at a high school in Central Oahu. E2 chemists have used immunoassay techniques to test soils and surfaces for PCB content at contaminated sites on the island of Oahu and in remote locations, including landfill sites on Kure Atoll and the island of Guam. The use of XRFs and immunoassay methods saved significant amounts of time and money during characterization and remediation work at multiple contaminated sites since the determination of the extent of contaminated soils can be determined instantaneously (in the case of metals contamination (XRF)) or within one day (in the case of PCB or pesticide contamination (immunoassay methods)). This rapid turn-around time in receiving information on the contamination levels at the site expedited the remediation work conducted at these sites. At Kure Atoll, E2 personnel developed a novel remediation approach for landfill soils that involved the introduction of native saprophytic fungi capable of degrading PCBs in soils. This technology was later used to in-situ remediate the interior of decommissioned military vessels that are currently mothballed in West Loch on the island of Oahu. E2 has also used a combination of abiotic and biological amendments to degrade PCBs in situ at landfill sites. At project sites contaminated with petroleum products, E2 has experience using bio-stimulation agents (RegenOx and PersulfOxTM) to accelerate the degradation of fuel- related contamination in site soils and groundwater. Most recently at Cocos Island in Guam, E2 is using Clean Sediment Technology with ecoSPEARS (Sorbent Polymer Extraction and Remediation System) technology. This is a transformative in-situ green cleanup system for polychlorinated biphenyls (PCBs), dioxins, PAHs, DDT, and other persistent toxins from contaminated sediment. ecoSPEARS is a truly sustainable approach using less water, energy, and emissions than traditional cleanup methods. ecoSPEARS is a plastic mat technology that is filled with their solvent and then inserted into a scalable ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 62 geosynthetic mat liner. The mat liners are then deployed down into the contaminated sediment where they act like a"sponge", passively absorbing PCBs from the sediment around it. E2 personnel have worked with the State of Hawaii Department of Health (HDOH) Office of Hazard Evaluation and Emergency Response (HEER) to augment a new laboratory soil sub-sampling strategy (MULTI INCREMENT®sub- sampling) and have worked with HEER staff in the effort to utilize field instruments to obtain real-time defensible data. As a result of this collaboration, E2 personnel authored multiple papers (often with co-authors from the Hawaii Department of Health) on the use of increment sampling to characterize contaminated properties, to comply with 401/404 permitting requirements in offshore harbor waters, and for Applicable Monitoring and Assessment Plan (AMAP) monitoring of streams and waterbodies impacted by construction activities. E2 personnel also pioneered innovative incremental sampling methodology techniques for the characterization of contamination in sediments present in streams and harbors. E2 recently hosted a webinar on contaminated sediment characterization for personnel from the EPA Office of Research and Development's Office of Science Policy and for consultants from around the nation. ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 63 ENDORSEMENTS N TS E2 completed a study of the Wahiawa Irrigation Another example project that demonstrates E2's System for the State of Hawaii Agribusiness ability to deliver a quality work product on-time and Development Corporation (ADC). E2 was able to within budget is the design of the Pier 29 Container successfully coordinate with multiple government Yard for the HDOT Harbors, Harbors Division. As a agencies and private stakeholders involved in the subconsultant to RMTC, E2 prepared design use of Lake Wilson and the irrigation system to specifications for the handling of contaminated soil investigate and identify the financial, legal, and and groundwater to be encountered during the environmental liabilities and responsibilities construction of the new container yard. Historic should ADC take ownership of the system. The releases of petroleum product have led to study was completed within nine months and in contamination in both the soil and groundwater at time for ADC's board to evaluate their options the site including the presence of free-floating before the next meeting of the State Legislature in product on the groundwater surface. In addition, E2 2008. A comprehensive presentation of the study prepared specifications to address the removal of was completed by E2 to the ADC board members. abandoned fuel pipelines and air monitoring during The presentation was covered by three of the four construction. E2 participated in coordination major local television stations. A few hours after meetings with HDOT Harbors and the Iwilei District the presentation, E2 received an Participating Partners (IDPP), a stakeholder for the acknowledgment email from Mr. Alfredo Lee, soil and groundwater contamination, to ensure Executive Director of ADC. The email stated effective communication and project acceptance by "The board members really liked your all parties involved. E2 also addressed comments by presentation.Thanks for the good work." HDOH who reviewed the construction documents. The project team was able to meet the one year accelerated design schedule required to receive Two other projects that exemplify E2's excellent stimulus funds from the Federal government. The past performance was the Integrated Solid Waste design team received a commendation letter from Management Plan and Pollution Prevention Plan HDOT Harbors Division for "excellent performance" developed for the Commander Fleet Activities on the project including"going beyond the contract Sasebo (CFAS) through NAVFAC Pacific. Review with extensive coordination that was done for the comments received from the CFAS Project Lead, Mr. handling of petroleum contaminated soils at the Frank Floros, on the two plans included: "The plan project site with the IDPP." (Integrated Solid Waste Management Plan) is excellent, concise and provides great attainable recommendations to improve the CFAS SW and Recycling Programs. CFAS appreciates your effort." I.AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. 30.DATE June 28,2024 29.SIGNATURE 31.NAME AND TITLE Ryan S.W.Yamauchi,P.E.,President ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 64 PROFESSIONAL SERVICE PROVIDER 1.PROJECT CATEGORY OF INTEREST QUALIFICATIONS PL.5) Community Planning(Environmental Planning, Environmental Assessments,Environmental Impact Statements) PART II - GENERAL QUALIFICATIONS (If a firm has branch offices,complete for each specific branch office seeking work) 2a.FIRM(OR BRANCH OFFICE)NAME 3.YEAR ESTABLISHED 4.UNIQUE ENTITY CODE Element Environmental,LLC 2005 CGL8P3GH6JW3 2b.STREET 5.OWNERSHIP a.TYPE 98-030 Hekaha Street,Unit 9 Limited Liability Company 2c.CITY 2d.STATE 2e.ZIP CODE b.SMALL BUSINESS STATUS Aiea Hawaii 96701 Small Business 6a. POINT OF CONTACT NAME AND TITLE Ryan S.W.Yamauchi,P.E.,President 7.NAME OF FIRM (If block 2a is a branch office) 6b.TELEPHONE NUMBER 6c. E-MAIL ADDRESS (808) 488-1200 ryamauchi@e2hi.com 8a.FORMER FIRM NAME(S) (If any) 8b.YR.ESTABLISHED 9.EMPLOYEES BY DISCIPLINE 10.PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a.Function c.No.of Employees a. c. Revenue Index Code b.Discipline Profile b.Experience Number(see below) (1)Firm (2)Branch Code 12 Civil Engineer 4 C15 Construction Management 3 23 Environmental 8 D04 Design Build-Preparation of 1 Engineer Requests and Proposals 24 Environmental 9 E09 Environmental Impact Studies, 2 Scientist Assessments or Statements 30 Geologist 3 E11 Environmental Planning 2 34 Hydrogeologist 1 E12 Environmental Remediation 3 11 Chemist 1 E13 Environmental Testing and 6 Analysis 10 Chemical Engineer 1 G04 GIS Services 1 02 Administrative 4 SO4 Sewage Collection Treatment and 2 Disposal 58 Technician/Analyst 8 S07 Solid Wastes; Incineration; Landfill 3 S13 Storm Water Handling and 4 Facilities W02 Water Resources, Hydrology, 3 Groundwater Total 39 W03 Water Supply, Treatment,and 2 Distribution 11.ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR PROFESSIONAL SERVICES REVENUE INDEX NUMBER LAST 3 YEARS (insert revenue index number shown atright) 1.Less than$100,000 6.$2 million to less than$5 million a. County 2.$100,00 to less than$250,000 7.$5 million to less than$10 million Work3 3.$250,000 to less than$500,000 8.$10 million to less than$25 million b. Non-County Work 7 4.$500,000 to less than$1 million 9.$25 million to less than$50 million 5.$1 million to less than$2 million 10.$50 million or greater C. Total Work 7 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a.SIGNATURE b.DATE c.NAME AND TITLE: June 28, 2024 Ryan S.W.Yamauchi,President ..---.4.v.-,9....A-1. ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025—PAGE 65 County of Hawaii Fiscal Year 2025 ATTACHMENT 1 ELEMENT ENVIRONMENTAL, LLC ORGANIZATIONAL CHART -10011. element environmental uc KEY PERSONNEL PRINCIPAL-IN-CHARGE ASSOCIATE ASSOCIATE ASSOCIATE SENIOR VICE PRESIDENT IE iii 4 ill 1 RyanS.W.Yamauchi,P.E. Roger C.Aoki,P.E. Matthew J.Neal Arlene H.Campbell,L.G. Eric M.Lau,P.E. President Technical Program Manager Environmental Investigation Manager Environmental Compliance Manager Technical Manager Program Manager Quality Assurance Manager Health and Safety Officer Project Manager Project Manager Principal Civil/Environmental Engineer Senior Environmental Engineer Senior Environmental Scientist Senior Geologist Senior Environmental Engineer Years of Experience: 32 Years of Experience: 28 Years of Experience: 26 Years of Experience: 35 Years of Experience: 20 Years with Finn: 19 Years with Finn: 1: Years with Finn: 18 Years with Finn: 18 Years with Finn: 15 iiimm KEY PERSONNEL-TECHNICAL SUPPORT STAFF Bernice M.Balete,P.E. Steven R.Spenger,Ph.D. Marvin D.Heskett,III Candace K Yamauchi,P.E. Noa R.Nobrega Robin K Matsuda Senior Environmental Engineer Senior Hydrogeologist/Hydrologist Senior Chemist Senior Environmental Engineer Staff Engineer Environmental Technician 30 Years of Experience 36 Years of Experience 35 Years of Experience 19 Years of Experience 2 Years of Experience 14 Years with Firm 18 Years with Firm 10 Years with Firm 13 Years with Firm Logan N.Yamamoto 2 Years with Firm Staff Environmental Scientist Angela K Peltier Lindsay B.Mason,P.E. Jodie C.A.Tsubone,P.E. Austin A.Lutey,E.I.T. Shane Mizukami Senior Geologist Senior Environmental Engineer Senior Civil Engineer Environmental Engineer Erica E.Adamczyk Field Technician 20 Years of Experience 22 Years of Experience 12 Years of Experience 16 Years of Experience Staff Geologist 8 Years of Experience 18 Years with Firm 15 Years with Firm 9 Years with Firm 16 Years with Firm 8 Years with Firm Johnathan P.Valencia Danny C.Liu Katie L.Kilway Daniel W.Amato,Ph.D. Arnold David West Staff Environmental Technician Kelton Y.Otsuka Senior Chemical Engineer Environmental Scientist Environmental Scientist Staff Environmental Scientist IT Technician Field Technician 36 Years of Experience 17 Years of Experience 8 Years of Experience 7 Years of Experience 5 Years of Experience 9 Years with Firm 14 Years with Firm 6 Years with Firm 7 Years with Firm Brandon Dela Cruz 5 Years with Firm Staff Environmental Technician Joshua B.Agpaoa,E.I.T. Leslie Robinson,E.I.T. James D.Tsubone Theodore N.Uekawa,E.I.T. Mark A.Miguel Staff Civil Engineer Project Civil Engineer Environmental Scientist Staff Civil Engineer Brenton Sasaoka Field Technician 6 Years of Experience 17 Years of Experience 8 Years of Experience 3 Years of Experience Staff Civil Engineer 8 Years of Experience 6 Years with Firm 3 Years with Firm 8 Years with Firm 3 Years with Firm 8 Years with Firm Maya Matsuoka John A.Ellis Garrett M.Ito Lauren G.Hunter Staff Environmental Scientist Field Technician Environmental Technician Field Technician 3 Years of Experience 9 Years of Experience 2 Years of Experience 8 Years of Experience 3 Years with Firm 9 Years with Firm 2 Years with Firm 8 Years with Firm ATTACHMENT I County of Hawaii Fiscal Year 2025 ATTACHMENT 2 ELEMENT ENVIRONMENTAL, LLC QUALIFICATIONS OF KEY PERSONNEL KEY PERSONNEL QUALIFICATIONS RYAN S.W. Professional Title: Years of Experience: 32 YAMAUCHI,P.E. Program Manager Years with Current Firm: 19 Principal Engineer REGISTERED PROFESSIONAL r'NGINEER,HAWAII CIVIL No.9566 Certified Asbestos Inspector,Hawaii No.HIASB-2905 Certified Lead Risk Assessor, Hawaii No.PB-0117 Education: • M.S.,Civil/Environmental Engineering,UC Berkeley • B.S.,Civil Engineering,University of Hawaii at Manoa Training: • OSHA 40-HR Initial HAZWOPER and Current 8-HR Refresher Training • OSHA 30-HR Construction Safety and Health Training • 40-HR Construction Safety Hazard Awareness Training for Contractors • Hazardous Waste Site Supervisor Training • Confined Space Training • Bloodborne Pathogens,First Aid,CPR,and AED Training ROGER C. Professional Title: Years of Experience: 28 AOKI, P.E. Senior Environmental Engineer Years with Current Firm: 18 REGISTERED PROFESSIONAL ENGINEER, HAWAII CIVIL No. 10019 Education: • M.S., Civil and Environmental Engineering, Purdue University • B.S., Civil Engineering,University of Hawaii at Manoa Training: • OSHA 40-HR Initial HAZWOPER and Current 8-HR Refresher Training • OSHA 30-HR Construction Safety and Health Training • 40-HR Construction Safety Hazard Awareness Training for Contractors • Hazardous Waste Site Supervisor Training • Confined Space Training • Bloodborne Pathogens, First Aid, CPR, and AED Training MATTHEW Professional Title: Years of Experience: 26 J.NEAL Senior Environmental Scientist Years with Current Firm: 18 Education: • B.S., Environmental Science and Geology,Willamette University Training: • OSHA 40-HR Initial HAZWOPER and Current 8-HR Refresher Training • OSHA 30-HR Construction Safety and Health Training • 40-HR Construction Safety Hazard Awareness Training for Contractors • Hazardous Waste Site Supervisor Training • Maritime Security (MARSEC) • Confined Space Training • Bloodborne Pathogens, First Aid, CPR, and AED Training ATTACHMENT 2 KEY PERSONNEL QUALIFICATIONS ARLENE H. Professional Title: Years of Experience: 35 CAMPBELL,L.G. Senior Geologist Years with Current Firm: 18 LICENSED GEOLOGIST,WASHINGTON No. 1664 Education: • Graduate Work, Geology,Vanderbilt University • B.A., Geology, Minor Hydrogeology,Austin Peay University Training: • OSHA 40-HR Initial HAZWOPER and Current 8-HR Refresher Training • OSHA 30-HR Construction Safety and Health Training • 40-HR Construction Safety Hazard Awareness Training for Contractors • Hazardous Waste Site Supervisor Training • Maritime Security (MARSEC) • Confined Space Training • Bloodborne Pathogens, First Aid, CPR, and AED Training ERIC M. LAU,P.E. Professional Title: Years of Experience: 20 Senior Environmental Engineer Years with Current Firm: 15 REGISTERED PROFESSIONAL ENGINEER,HAWAII CIVIL No. 12977 Certified Asbestos Inspector,Hawaii No.HISAB-3198 Certified Lead Risk Assessor,Hawaii No.PB-0439 Education: • M.S., Civil and Environmental Engineering, Massachusetts Institute of Technology (MIT) • B.S., Civil and Environmental Engineering, MIT • B.S., Biology, MIT Training: • OSHA 40-HR Initial HAZWOPER and Current 8-HR Refresher Training • OSHA 30-HR Construction Safety and Health Training • 40-HR Construction Safety Hazard Awareness Training for Contractors • Hazardous Waste Site Supervisor Training • Confined Space Training • Bloodborne Pathogens, First Aid, CPR, and AED Training BERNICE M. Professional Title: Years of Experience: 30 BALETE,P.E. Senior Environmental Engineer Years with Current Firm: 14 REGISTERED PROFESSIONAL ENGINEER,HAWAII CIVIL No. 10186 Certified Asbestos Project Designer/Inspector,Hawaii No.HISAB-0449 Certified Lead Project Designer/Risk Assessor,Hawaii No. PB-0449 Education: • B.S., Civil Engineering,University of Hawaii at Manoa Training: • OSHA 40-HR Initial HAZWOPER and Current 8-HR Refresher Training • OSHA 30-HR Construction Safety and Health Training • 40-HR Construction Safety Hazard Awareness Training for Contractors • DOT Hazardous Materials 49CFR 172 Subpart H • Maritime Security Awareness Training(MARSEC) • Hazardous Waste Site Supervisor Training • Confined Space Training • Bloodborne Pathogens, First Aid, CPR, and AED Training ATTACHMENT 2 KEY PERSONNEL QUALIFICATIONS STEVEN R. Professional Title: Years of Experience: 36 SPENGLER. PH.D. Senior Hydrologist/Hydrogeologist Years with Current Firm: 18 Education: • Ph.D., Hydrology, University of Hawaii at Manoa • M.S., Geology,University of Hawaii at Manoa • B.S., Geochemistry,UC Santa Cruz • B.S., Chemistry, UC Riverside Training: • OSHA 40-HR Initial HAZWOPER and Current 8-HR Refresher Training • OSHA 30-HR Construction Safety and Health Training • 40-HR Construction Safety Hazard Awareness Training for Contractors • Hazardous Waste Site Supervisor Training • Confined Space Training • Bloodborne Pathogens, First Aid, CPR, and AED Training MARVIN D. Professional Title: Years of Experience: 35 HESKETT Senior Chemist Years with Current Firm: 10 Certified Asbestos Inspector,Hawaii No.HISAB-34631 Certified Lead Risk Assessor,Hawaii No.PB-1150 Education: • B.S., Biochemistry, California Polytechnic University at San Luis Obispo Training: • OSHA 40-HR Initial HAZWOPER and Current 8-HR Refresher Training • OSHA 30-HR Construction Safety and Health Training • 40-HR Construction Safety Hazard Awareness Training for Contractors • Hazardous Waste Site Supervisor Training • Sampling for Defensible Environmental Decisions, QE3C • Data Quality Objectives,Shipley Group NEPA Training • 40-HR QA/QC Course • Maritime Security (MARSEC) • Confined Space Training • Bloodborne Pathogens, First Aid, CPR, and AED Training CANDACE K. Professional Title: Years of Experience: 19 YAMAUCHI, P.E. Senior Environmental Engineer Years with Current Firm: 13 REGISTERED PROFESSIONAL ENGINEER,HAWAII CIVIL No. 16320 Certified Asbestos Inspector,Hawaii No. HISAB-3840 Certified Lead Risk Assessor, Hawaii No. PB-1135 Education: • B.S., Earth and Environmental Engineering, Columbia University Training: • OSHA 40-HR Initial HAZWOPER and Current 8-HR Refresher Training • OSHA 30-HR Construction Safety and Health Training • 40-HR Construction Safety Hazard Awareness Training for Contractors • Hazardous Waste Site Supervisor Training • Qualified Stormwater Compliance Manager • Confined Space Training • Bloodborne Pathogens, First Aid, CPR, and AED Training ATTACHMENT 2 KEY PERSONNEL QUALIFICATIONS ANGELA K. Professional Title: Years of Experience: 20 PELTIER Senior Geologist Years with Current Firm: 18 Education: • B.S., Geology and Geophysics,University of Hawaii at Manoa Training: • OSHA 40-HR Initial HAZWOPER and Current 8-HR Refresher Training • 40-HR Construction Safety Hazard Awareness Training for Contractors • ASTM E1527 Standard Practice for Environmental Site Assessment: Phase I Environmental Site Assessment Process Certification, • First Aid and CPR Training LINDSAY B. Professional Title: Years of Experience: 22 MASON,P.E. Senior Environmental Engineer Years with Current Firm: 15 REGISTERED PROFESSIONAL ENGINEER, MICHIGAN CIVIL No. 6201059411 Education: • B.S., Environmental Engineering, Michigan Technological University Training: • OSHA 40-HR Initial HAZWOPER and Current 8-HR Refresher Training • DOT HM-181 Hazardous Materials Training RCRA S30 Certification • Hazardous/Toxic Materials Management • Hazardous Waste Site Supervisor Training • Bloodborne Pathogens, First Aid, CPR, and AED Training JODIE C.A. Professional Title: Years of Experience: 12 TSUBONE,P.E. Senior Civil Engineer Years with Current Firm: 09 REGISTERED PROFESSIONAL ENGINEER, HAWAII CIVIL No. 17048 Certified Asbestos Inspector,Hawaii No.HISAB-4629 Certified Risk Assessor,Hawaii No. PB-1151 Education: • B.S., Civil Engineering,University of Hawaii at Manoa Training: • OSHA 40-HR Initial HAZWOPER and Current 8-HR Refresher Training • OSHA 30-HR Construction Safety and Health Training • Erosion and Sediment Control Plan Coordinator (ESCP), Department of Planning& Permitting (CCH) • 40-HR Construction Safety Hazard Awareness Training for Contractors • Maritime Security (MARSEC) • Confined Space Training • Bloodborne Pathogens, First Aid, CPR, and AED Training ATTACHMENT 2 KEY PERSONNEL QUALIFICATIONS AUSTIN A. Professional Title: Years of Experience: 16 LUTEY, E.I.T. Environmental Engineer Years with Current Firm: 16 Engineer-in-Training(E.I.T.) Certified Asbestos Inspector,Hawaii No. HISAB-3199 Certified Lead Risk Assessor/Inspector No.PB-0440 Education: • B.S., Civil Engineering,University of California Los Angeles (UCLA) Training: • OSHA 40-HR Initial HAZWOPER and Current 8-HR Refresher Training • OSHA 30-HR Construction Safety and Health Training • 40-HR Construction Safety Hazard Awareness Training for Contractors • Hazardous Waste Site Supervisor Training • Maritime Security (MARSEC) • Confined Space Training • Bloodborne Pathogens, First Aid, CPR, and AED Training DANNY C. LIU Professional Title: Years of Experience: 36 Senior Chemical Engineer Years with Current Firm: 09 Education: • B.S., Chemical Engineering,University of Colorado at Boulder Training: • OSHA 40-HR Initial HAZWOPER and Current 8-HR Refresher Training • OSHA 30-HR Construction Safety and Health Training • Hazardous Waste Site Supervisor Training • Bloodborne Pathogens, First Aid, CPR, and AED Training DANIEL W. Professional Title: Years of Experience: 08 AMATO,PH.D. Environmental Scientist Years with Current Firm: 06 Certified Asbestos Inspector,Hawaii No.HISAB-4628 Certified Lead Risk Assessor,Hawaii No.PB-1148 Education: • Ph.D.,and M.S., Botany,University of Hawaii at Manoa • B.S., Biology,University of Vermont Training: • OSHA 40-HR Initial HAZWOPER and Current 8-HR Refresher Training • 40-HR Construction Safety Hazard Awareness Training for Contractors • Maritime Security (MARSEC) • Scientific SCUBA Diver, Rescue Diver, Master Diver, Nitrox Certified Diver • Bloodborne Pathogens, First Aid, CPR, and AED Training ATTACHMENT 2 KEY PERSONNEL QUALIFICATIONS ARNOLD DAVID Professional Title: Years of Experience: 07 WEST Staff Environmental Scientist Years with Current Firm: 07 Certified Asbestos Inspector,Hawaii No.HISAB-4625 Certified Lead Risk Assessor/Inspector,Michigan No. P-08520 Education: • B.S.,Applied Physics,Jacksonville University of Florida Training: • OSHA 40-HR Initial HAZWOPER and Current 8-HR Refresher Training • 40-hour Construction Safety Hazard Awareness Training for Contractors • Bloodborne Pathogens, First Aid, CPR, and AED Training JOSHUA B. Professional Title: Years of Experience: 06 AGPAOA,E.I.T. Staff Civil Engineer Years with Current Firm: 06 Certified Asbestos Inspector,Hawaii No.HISAB-4791 Certified Lead Risk Assessor,Hawaii No.PB-1137 Education: • B.S., Civil Engineering,University of Hawaii at Manoa Training: • OSHA 40-HR Initial HAZWOPER and Current 8-HR Refresher Training • 40-HR Construction Safety Hazard Awareness Training for Contractors • Bloodborne Pathogens, First Aid, CPR, and AED Training LESLIE A. Professional Title: Years of Experience: 17 ROBINSON, E.I.T. Project Civil Engineer Years with Current Firm: 03 Engineer-in-Training(E.I.T.) Radon Measurement Professional -NRPP 114210-RMP Certified Asbestos Inspector,CHC Training,No. 58808275 Education: • M.S., Civil Engineering, Massachusetts Institute of Technology(MIT) • B.S., Civil Engineering, MIT Training: • OSHA 40-HR Initial HAZWOPER and Current 8-HR Refresher Training • 40-HR Construction Safety Hazard Awareness Training for Contractors • Cross Connection Control and Hydraulic Research Specialist Training,University of Southern California • How to Conduct a Sanitary Survey of Surface Water and Ground Water System Course,U.S. Environmental Protection Agency • Confined Space Training • Bloodborne Pathogens, First Aid, CPR, and AED Training ATTACHMENT 2 KEY PERSONNEL QUALIFICATIONS JAMES D. TSUBONE Professional Title: Years of Experience: 08 Environmental Scientist Years with Current Firm: 08 Radon Measurement Professional,NRPP ID 114350-RMP Certified Asbestos Inspector,Hawaii No. HISAB-4118 Certified Lead Risk Assessor,Hawaii No. PB-0827 Education: • B.S., Geology, Mount Royal University Canada Training: • OSHA 40-HR Initial HAZWOPER and Current 8-HR Refresher Training • OSHA 30-HR Construction Safety and Health Training • 40-HR Construction Safety Hazardous Awareness Training for Contractors • Maritime Security Awareness Training(MARSEC) • Confined Space Training • Bloodborne Pathogens, First Aid, CPR, and AED Training THEODORE Professional Title: Years of Experience: 03 N. UEKAWA, E.I.T. Staff Civil Engineer Years with Current Firm: 03 Engineer-in-Training(E.I.T.) Radon Measurement Professional-NRPP 114230-RMP Certified Asbestos Inspector,Hawaii No.HISAB-5084 Certified Lead Risk Assessor/Inspector,Hawaii No.PB-1257 Education: • M.S., Civil Engineering,University of Hawaii at Manoa • B.S., Civil Engineering,University of Hawaii at Manoa Training: • OSHA 40-HR Initial HAZWOPER and Current 8-HR Refresher Training • 40-HR Construction Safety Hazardous Awareness Training for Contractors • OSHA 30-hour Construction Safety and Health Training • Confined Space Training • Bloodborne Pathogens, First Aid, CPR, and AED Training MAYA Professional Title: Years of Experience: 03 MATSUOKA Staff Environmental Scientist Years with Current Firm: 03 Certified Asbestos Inspector,Hawaii No.HISAB-5085 Certified Lead Inspector,Hawaii No.PB-1254 Education: • B.A., Environmental Studies and Economics, University of California at Santa Cruz Training: • OSHA 40-HR Initial HAZWOPER and Current 8-HR Refresher Training • 40-HR Construction Safety Hazardous Awareness Training for Contractors • Confined Space Training • Bloodborne Pathogens, First Aid, CPR, and AED Training ATTACHMENT 2 County of Hawaii Fiscal Year 2025 ATTACHMENT 3 ELEMENT ENVIRONMENTAL, LLC PROFESSIONAL LICENSES AND CERTIFICATIONS Element Environmental, LLC Personnel Registered Professional Licenses NAME LICENSE NUMBER EXPIRATION DATE RYAN P.E. - No. 9566, HAWAII Expires: 4/30/2026 S.W. YAMAUCHI STATE OF HAWAII LicenseNuniaer Ex "date `� PE5566 47302024 y >R useAa Nst uca. .acs rumca,uAwa.FFrr,e ' . PROFESSIONAL ENGINEER fin,. CLASS(ES):CE CML ❑ •C'p'l • BOARD OF PROFESSIONAL ENGINEERS,ARCHITECTS,SURVEYORS RYAN S W YAMAUCHI AND LANDSCAPE ARCHITECTS PROFESSIONAL ENGINEER nt..,,.,,ore,o..,In,9�..,,n�W r,,�.�, ,<.m4n,uc..m,nemro. SIF CENSEE ROGER P.E.- No. 10019, HAWAII Expires: 4/30/2026 C. STATE F `I AOKI -o.v,..6,o. ,.—.o.,....,..„ LIsceee NiaN(a,. EMpcanan date El.---,:,.E PE-1OOIS a.S0u2I24 cx,,,rxwum.veyns `` BOARD OF PROCESSIONAL ENGINEER r1A PROFESSIONAL ENGINEERS, ARCHITECTS, GLASS(ES):CE CIVIL 0 SURVEYORS AND LANDSCAPE ARCHITECTS .-assrONA.,wsOrxeaa ,,,,,sl A x.0 -..wy.xo-,w.w ab ri s,«.. wi-1-S sc,.9F'*ae,i..,✓—... ,,,_, - OF 1',. Pe'.y %GNATU LI . CENSEEitan BERNICE P.E. - No. 10186, HAWAII Expires: 4/30/2026 M. BALETE STATE OF HAWAII DErnATVE117 Of Cen•EMI..APFAMS ..-.ense Number Expiration PE 9{!18Q 4/301•2026U26 BOARD OF ,J=E,5II;51,111 FN[;INFFH PROFESSIONAL ENGINEERS, ARCHITECTS, SURVEYORS AND LANDSCAPE ARCHITECTS BERNi.,F M o44 ETE ,'!'''="'''' ...f.- MHELM'S A. wee br/ Cd .r mf G.es .. s NAL 8N IN48'A ((II ` hY +fir( —s Pd-SL y..e..4-4✓.r Air...... �II�4 76°4 ,..- .4s.. u',,,,,,...Wfa.wK,�✓dt..x yp L.m de ad my dM.«'M✓S3'x,.a,re2'.ds,, .e S4N4T'SPE Of I_{LE , ERIC P.E. - No. 12977, HAWAII Expires: 4/30/2026 M. LAU STATE OF HAWAII DEN.AntEir CF n License Number Expratton date ale❑ PE-12977 4/30/2026 -41 SPA.OF I Mend DEPARTMENT OF w.wucoxsumw. AIRs PROFESSIONAL ENGINEER rP . CLASS(ES)CE CIVIL — PROFESSIONAL ENGINEER ERIC N LAU +o`^aY�oc 9E-030 HEKAHA STREET UNIT 9 iiirIAAIEA,HI 96701 PROFESSION U.ENCRYS_ER Ark /�, SIGNATURE OF LICENSEE ,,v ✓ [.w�iyeiann ATTACHMENT 3 Element Environmental, LLC Personnel Registered Professional Licenses NAME LICENSE NUMBER EXPIRATION DATE CANDACE P.E.- No. 16320, HAWAII Expires: 4/30/2026 K. K. H. STATE OF HANNAH _t vL.HER EXPIRATION DATE Ell!� 0 BORGES NF.IG MGIr RGI,..,.> PE 16320 04.302022 , 7N I 1 YAMAU C H IPROFE SS IONALNENG INEERIcr.cr.ca.�,�mcR>rre R GLASS(ES)GE ■ BOARD OF PROFESSIONAL ENOINEERB,ARCHITECTS.SURVEYORS CANDACE K K H BORGES ^ AND LANDSCAPE ARCHITECTS I CANDACE I, N BONZES PR0FE55,0NAL ENGINEER SIGNATURE OF LICENSEE M.,w,.,,,.n...,9,M,l.......b,n...,,, ,r..n rn,,, ..r.M..,w.rR,.:w,,:.I• _. r.W.:a,a f!n..,m-.G rl:nr,d 1ra.T.n.lM.,r monjR��[' JODIE P.E.- No. 17048, HAWAII Expires: 4/30/2026 C. STATE OF HAWAII TSUBONE R, MrR,l,4II, '— - License Number Expiration date ©� PE-17048 4/30/2028 BOARD OF PROFESSIONAL ENGINEERS,ARCH3TECTS,SURVEYORS PROFESSIONAL ENGINEER AND LANDSCAPE ARCHITECTS CLASS(ES).CE CIVIL O EC R JODIE C TSUBONE JMord 411111.1111. PROPERRIOHAL ENGINEER r nh'kIr zri n !r V rAu n i:ord.4 lN.G:nV,Nrlir Ha,NAT,ed Aerr..,. yy j `1 POdefOrg&kx.F.P•--' ATURE O LIC • LINDSAY BETH P.E.-No. 6201059411, MICHIGAN Expires: 8/21/2024 MASON STATE OF n_,_,N-DEPOIND,of L_1EN,3.,AN,REILL,,IR AFFAIRS BUREAU OF PROFESSIONAL LICENSING PROFESSIONAL ENGINEER LICENSE LINDSAY BETH MASON LICENSE NO E%PIR4170I NEE 6201059411 C18/21/2B24 21299131815 ARLENE L.G.-No. 1664,WASHINGTON Expires: 3/10/2025 HELEN TE OF WASHINGTON OltPAR MAI OF$TA CAMPBELLTRIS CERTIFIESTIIF MRS. OR DI IRKS MED REI OPROFEM IS AUTHORIZED AS SSIONS'DIN Box. �LrCE$i G IJ ARLENE X } GEOLOGIST dME.E ATTACHMENT 3 Element Environmental, LLC Asbestos Certifications State of Hawai'i State of Hawai'i Asbestos Certification Asbestos Certification L Training Course Exp Dates ElTraining Course Exp_Dates r,,, W n'a MP r e W rile MP rile w+" CS n/a PO pia CS rda PD Na INS 08!14124 PM ria Ilk INS 04)19124 PM rte WW=Worker =Worker Agpaoa CS=Cont./Sup E Adamczyk CSS Cont/Sup. Joshua B. INS=Inspector Erica Erica E. INS.Inspector ct Designer Element Environmental.LLC PD=Project Designer Element Environmental,LLC PD=Pro e g HIASB-4791 MP=Mgmt.Planner HIASB-5331 MP=Mgmt Planner State Exp.Date PM=Project Monitor State Exp. Date PM=Protect Monitor State of Hawaii Jw State of Hawaii Asbestos Certification Asbestos Certification Training Course Exp.Dates Training Course Exn n r W nia MP nia W ria MP n/a t, CS nia PO nfa //p. CS:' rife PD 09106/24 INS 08!14124 PM rile INS 08/14/24 PM rule ti / i W=Worker , �/ "- W=Worker Amato cs=Cont./Sup. Balete cs=Cont./Sup Daniel W. INS=Inspector Bernice M. INS=Inspector Element Environmental LLC PD=Project Designer Element Environmental,LLC PD=Project Designer H ASB-4628 MP=Mgmt.Planner HIASB-0449 MP=Mgmt.Planner State Exp. Date PM=Project Monitor State Exp. Date --- PM=Project Monitor State of Hawaii State of Hawaii Asbestos Certification Asbestos Certification Training Course Exp.Dates .; i 'raining Course Exp Dates W n;a MP ora .1 -a� W nfa MP n o M CS ora PD rile . 'e j CS nia PD rile INS 10/18/24 PM rile «a INS 01(05125 PM nia W=Worker Dela Cruz CS=Cont./Sup. W=Worker Brandon N_ INS=Inspector Ellis CS=Cont.ISup. Element Environmental PD=Project Designer John A. INS=inspector HIASB-5430 MP=Mgmt Planner Element Environmental, LLC PD=Project Designer State Exp.Date PM=Project Monitor HIASB3117 MP=Mgmt.Planner State Exp. Date PM=Project Monitor State of Hawaii State of Hawaii Asbestos Certification Asbestos Certification �'+ , Training Course ExpDates / ... ^ ,„ Training Course Exp Dates , � W n%a MP nia ` W nia MP nia �° nit CS n!a PD nfa '4 CS nia PO nia INS 08/09124 PM n/a '+_, ,.'° INS 01102125 PM Na '' W=Worker W=Worker Hesketh cs=contusup. Ito cs=Cont./Sup. Marvin D. INS=Inspector Garrett M. INS=Inspector Element Environmental.LLC PD=Project Designer Element Environmental,LLC PD=Project Designer HIASB-4631 MP=Mgmt.Planner HIASB-5159 MP=Mgmt.Planner State Exp.Date PM=Protect Monitor State Exp.Date PM=Project Monitor State of Hawai'i State of Hawai'i Asbestos Certification Asbestos Certification f-1111- raTiningCourseFxp.Dates Training Course Fxp Dates W n.'a MP n.ra W n!a MP Na .( CS rile PD n/a CS n/a PD nia ff INS 03/14/25 PM nia INS 10/04/24 PM nfa W=Worker W=Worker Lau CS=Cant!sup Lutey CS=Cont./Sup. Eric M. INS=Inspector Austin A. INS-inspector Element Environmental,LLC PD=Project Designer Element Environmental, LLC PD=Project Designer HIASB-3198 MP=Mgmt,Planner HIASB-3199 MP=Mgmt.Planner State Exp. Date PM=Project Monitor State Exp.Date PM=Project Monitor ATTACHMENT 3 Element Environmental, LLC Asbestos Certifications State of Hawaii State of Hawaii Asbestos CertificationIltill11111). Asbestos Certification Training Course rkr' DatesTraining Course Exp Dat -a' WMa MP n;a a ..,► • W -�a MP r:.:v CS n/a PD rife r CS rid PD Hilt — INS 06/95/24 PM nfa llIP INS 051 :!3 PM ria ( r W=Worker a t-Milker Matsuoka C5=ContlSup_ Mat Ma Robin to C Gant 1.". t ector Element Environmental PD=Project Desi ner Robin INS-:ns.ector HIASBS085 MP=Mgmt Planner Element Environmental LLC 'D-I jJojec.t Design i.' State Exp.Date PM=Project Monitor HIASB-6717 Mi'-Mgrm P.iit:••.er State Exp.Date i -. PM r'u,cc:`:9_nrIm State r He P • IrgtiOrl r'-.nr,r i 8,, 't a MMP to ty.' CERTIFICATE OF ACHIEVEMENT s4. . i 4, \.61;, LESLIE AROBINSON 1' i r 1 r Al,1, Ve ' ; nUoowc INsoec-.OR Nobrega ,N.-1--zit:.:.' �'4. " '' 2022 Noa RM � ti � , SEPTEMBER,21323 Element Environmental t,t: =F •1 r er HIASB-5385 ,mac 0'r J. Willner ❑ ❑. State Exp.Date - • :124 PM.Project Monitor ❑ o State of Hawaii State of Hawaii Asbestos Certification Asbestos Certification Tra�nina Course Fxp Dares /r41). Training Course Exp Dates w n,a MP na W Na MP na iriyCS nia PD nia ‘,1 CS nfa PD Na INS 08/14/24 PM nfa INS 03174125 PM nia W=Worker Tsubone CS=Cont/Sup W=Worker Jodie C. INS=Inspector Tsubone CS=Cont!Sup. Element Environmental,LLC PD=Project Designer James D. INS=Inspector HIASB-4629 MP=Mgmt.Planner Element Environmental,LLC PD=Project Designer State Exp.Date PM=Project Monitor HIASB-4118 MP=Mgmt Planner State Exp. Date PM=Project Monitor State of Hawai'i State of Hawaii Asbestos Certificationitogh Asbestos Certification Training errs. up.Dates 'Tra1n1 CoLlrse_FY tes, W n/a MP Na 14 , n'a MP r,a CS n/a PD Nscs .Tit;"a D' INS 06/15124 PM n/a .111W=Worker : .IN '.„'it Lr y , '�, Uekawa G5=ContJSup. � t 7,iayyr^ r `�".. Theodore N. INS-Inspector Valencia . up• Element Environmental,LLC PD=Project Designer ll P.HIASB-5084 MP=Mgmt Planner Jonalha . f State Exp.Date PM=Project Monitor Element Environmental U.C.^ - P t•P.c,„4 eet De$01.CI HIASB•5339 IAP=Mew.Pis-1 a Stale Exp. Date DE."4 -=:4 PM=oro)rctay.,tar • State of Hawai'i State of Hawaii Asbestos Certification Asbestos Certification t Training Course Exn.Dates n Training Course Exp.aates_ " OF NI} W nra MP ma y W nia MP n a CS nia PD Ma - °t CS nra PD n,a INS 01105/25 PM nfa INS 06109124 PM PS W=Worker -. .+..- W=Worker West CS=Cont./Sup. Yamamoto CS=Cant lSup Arnold D. INS=Inspector ,..C//Jan N r,1 INS,Inspector Element Environmental, LLC PD=Project Designer E,i_rnen! Environmental LLC CI Project Desgner HIASB-4625 MP=Mgmt_Planner HIASB-5340 Mi' Mpmt r. State Exp. Date PM=Project Monitor State Exp. Date ATTACHMENT 3 Element Environmental, LLC Asbestos Certifications 6State of Hawaii State of Hawaii Asbestos Certification Asbestos Certification Training Course Exp Dates Training Course Exp.Dates W nra MP Na W n;a MP na CS n/a PD nla irf , CS nta PD nla INS 01/22)25 PM nra iNS 01122125 PM nla , ' �1, W=Worker _ W=Worker Yamauchi CS=Cont./Sup, Yamauchi CS=Conti-Sup Ryan S W_ INS=Inspector Candace K.K.H_ INS=Inspector Element Environmental, LLC PD=Project Designer Element Environmental, LLC PD=Project Designer HIASB-2905 MP Mgmt.Planner HIASB-3840 MP=Mgmt Planner State Exp.Date PM=Project Monitor State Exp. Date PM=Project Monitor ATTACHMENT 3 Element Environmental, LLC Lead Based Paint Activities Certifications State of Hawai'i State of Hawai'i Lead Based Paint Activities Certification Lead Based Paint Activities Certification Expiration Mates: Expiration Dates' Inrspecto'- rl'a Instrector- C10•70.76 Supervisor- n'a Supero r n a Risk Assessor- 12.942025 Assessor ma Project Designer- Wit . Project Designer. n.'a A 'A* Wirmicer. rt'a , . Worker- ima Adamczyk , 1 Joshua B. , 7 Erica E. Certification* PB-1137 Certification # PB-1359 State of Hawaii State of Hawaii Lead Based Paint Activities Certification Lead Based Paint Activities Certification Expiration Dates: Expiration Dates: inspector- n a Inspector- ma Supervisor- n a Supervisoi. na Risk Assessor- 07,21 Risk Assessor- 12742025 Project Designer- 10/29::024 Pct Designer- ma Worker- n a .1. dime ',Nark e r- ma 'too"- Balete , Amato Daniel Bernice Certification# PB-1148 1' , , 4 Certification # PB-0449 — — State of Hawai'i State of Hawaii Lead Based Paint Activities Certification Lead Based Paint Activities Certification Expiration Dates: E xpiratton Delos: Inspector- n/a 'nspector- ma Supervisor- n/a SJpenrisor. ma Risk Assessor- 11/2012026 Risk Assessoi- 011O2028 Project Designer- n/a Protect Deargrker- rim Worker- n/a Worker. n'a V All ' Dela Cruz ....--,q Ellis Brandon N. John A. Certification# PB-1413 Certification# PB-0828 State of Hawai'i State of Hawai'i Lead Based Paint Activities Certification Lead Based Paint Activities Certification Expiration Dates: Expiration Dates Inspector- 01124'2025 inSpector n'a Supervisor- N/A Supervisor- n'a Risk Assessor- rife Risk Assessor- I 2'3a2025 Project Designer- n/a Worker- rile Project Designer. Rte . , 'Worker. n'a Ito Heskettit , ,.'' ' _ ,.,. . Garrett M. Marvin le Certification # PB-1272 IL, . Certification # PB-1 150 ATTACHMENT 3 Element Environmental, LLC Lead Based Paint Activities Certifications State of Hawaii Lead Based Paint Activities Certification State of Hawaii Expiration pates. Lead Based Paint Activities Certification Expiration Dates: Inspector- 057+4'y,0 Jrrspecicr r.a Supervisor- noa Super.isar- n.a Risk Assessor- 10,61/2025 ° .' itis:Assossor- 12.18.''7025 Prciect Designer- rt/a Project tesrgner- ma ' Wotimr• it a Wader- ma Lau Lutey _ r°r Austin Eric isk,. i Certification# P8-0440 Certification # P8-0439 State of Hawaii - Lead Based Paint Activities Certification State of Hawaii Expiration Dates: Lead Based Paint Activities Certification I9spector- 06,'06.2025 Expiration Dates: Sucr,'visar n.a nspectc 77,01,2o?a Risk Asses or• nia 5'uper.'isnr- n:a P'roject De irgner. nra ., °"`... Risk Assessor- na a <'Jork�er- n+a ;"< Protect Designer- nea ' Worker- n,a °s' Matsuda Matsuoka Robin Ken Maya Certification# P8-1291 Certification* P8-1254 State of Hawaii State of Hawai'i Lead Based Paint Activities Certification Lead Based Paint Activities Certification Expiration Dates: Expiration pates: Inspector- n/a Inspector- Iva Supervisor- nia 1p„r Supervisor- nes str Risk Assessor- 08/02': Risk Assessor- 12/17,2025 Project Designer- n/a Project Designer- ru'a W Worker- n/a m i Worker n'a ;' «, Nobrega : r Tsubone � . J ' Noa RMy4, �r James4 �' Certification # PB-1385 �_ 1 ` Certification# PB-0827 State of Hawaii State of Hawaii Lead Based Paint Activities Certification Lead Based Paint Activities Certification Expiration Dates: I pector• 01/07,02023Expiration Dates: Supervisor- n a Inspector- 07/19/2024 Risk Assessor- 074r_ 1r Supervisor- nla Project Designer- niiii 4:. Risk Assessor- 06/21/2026 Vitoriter= naProject Designer- nla 6�„ � 4 Worker- n/a or . Tsubion Uekawa Jodie C. ,,,.- r Certification # PB-1151 Theodore `"Teddy" Certification # PB-1257 Ilig ATTACHMENT 3 Element Environmental, LLC Lead Based Paint Activities Certifications MtirDHHS State of Hawar'i Lead Based Paint Activities Certification �..,� 4,14,RAN. CApiralaan(krrc.s: L 1� Ir p€ Ic.. 11'3 rpari:,nr n'a 4 Risk Assir[sc p?K ." ^N" Prarr(iu39r,( nwA ARNOLD WEST `N�Iorkkr• A'a {..o „� ItAL) INSPECTOR/RISK ASSESSOR ERE INVESTIGATOR Valencia ' ihr' ' c I IrP 008520- Jonathan P. CertltOCaln�n* PB-1381 ANNVAL FFE Q TRAINING OUE, i. EXAM DUE: 03/31/23 ❑AfP 03/31/25 LEAD EENTIFICAI ON.Ho COMPLIANCE A55VAANCE SFCIION State of Hawairi State of Hawaii Lead Based Paint Activities Certification Lead Based Paint Activities Certification Exprratton Dates- Expiration Dates: n Inspector- Na Insect _- .7 Supervisor- n/a Risk Assessor- 07)25/2026 Risk Assessur- 07,`071' 26 Project Designer- nla Prori_.`Designer- n.ia Worker- nfa v"dorkrr- n a Yamamoto INF I Yamauchi Logan N.M. Candace K.K.H. Certification* PB-1383 Certification * PB-1135 State of Hawaii Lead Based Paint Activities Certification Expiration pales: Inspector• 03)2 112022 Supervisor- nra Risk Assessor. IO+17)7+ .*" Proiecr Designer• r e Worker- ns Yamauchi Ryan Certification* PB-0117 ATTACHMENT 3 County of Hawaii Fiscal Year 2025 ATTACHMENT 4 ELEMENT ENVIRONMENTAL, LLC CERTIFICATE OF VENDOR COMPLIANCE CERTIFICATE OF GOOD STANDING "a 19 so �" ' a° STATE OF HAWAII STATE PROCUREMENT OFFICE CERTIFICATE OF VENDOR COMPLIANCE This document presents the compliance status of the vendor identified below on the issue date with respect to certificates required from the Hawaii Department of Taxation(DOTAX),the Internal Revenue Service,the Hawaii Department of Labor and Industrial Relations (DLIR),and the Hawaii Department of Commerce and Consumer Affairs (DCCA). Vendor Name: ELEMENT ENVIRONMENTAL, LLC DBA/Trade Name: ELEMENT ENVIRONMENTAL, LLC Issue Date: 06/04/2024 Status: Compliant Hawaii Tax#: 27137955-01 New Hawaii Tax#: GE-1660416000-01 FEIN/SSN#: XX-XXX4479 UI#: No record DCCA FILE#: 40203 Status of Compliance for this Vendor on issue date: Form Department(s) Status A-6 Hawaii Department of Taxation Compliant 8821 Internal Revenue Service Compliant COGS Hawaii Department of Commerce&Consumer Affairs Compliant LIR27 Hawaii Department of Labor&Industrial Relations Compliant Status Legend: Status Description Exempt The entity is exempt from this requirement Compliant The entity is compliant with this requirement or the entity is in agreement with agency and actively working towards compliance Pending A status determination has not yet been made Submitted The entity has applied for the certificate but it is awaiting approval Not Compliant The entity is not in compliance with the requirement and should contact the issuing agency for more information frr E O F N 19 59 ''''''''.01: vi ' . 4,t1, ? ;Ti1o r. so p , \V;00. N a -14, a° 0. 1., Department of Commerce and Consumer Affairs CERTIFICATE OF GOOD STANDING I, the undersigned Director of Commerce and Consumer Affairs of the State of Hawaii, do hereby certify that according to the records of this Department, ELEMENT ENVIRONMENTAL, LLC was organized under the laws of the State of Hawaii on 10/10/2005 ; that it is an existing limited liability company in good standing and is duly authorized to transact business. IN WITNESS WHEREOF, I have hereunto set �MERC E AN() my hand and affixed the seal of the G0 co Department of Commerce and Consumer o sG Affairs, at Honolulu, Hawaii. ti `; Dated: April 16, 2024 W r0 ;11> 6 d O STq 7-4- ° F VA P�P\` Director of Commerce and Consumer Affairs To check the authenticity of this certificate, please visit:http://hbe.ehawaii.gov/documents/authenticate.html Authentication Code:497183-COGS PDF-40203 C5 County of Hawaii Fiscal Year 2025 ATTACHMENT 5 ELEMENT ENVIRONMENTAL, LLC CERTIFICATE OF LIABILITY INSURANCE ACO o® CERTIFICATE OF LIABILITY INSURANCE DATE(MM/DD/YYYY) 11/03/2023 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Jim McAluney NAME: JHC Services Inc dba John Connors Insurance HONE Ext): (808)521-3663 SAA/ c,No): (808)521-5995 500 Ala Moana Blvd. E-MAIL ADDRESS: Ste.2-303 INSURER(S)AFFORDING COVERAGE NAIC# Honolulu HI 96813INSURERA: Admiral Insurance Company INSURED INSURER B: First Insurance Company of Hawaii Element Environmental,LLC. INSURER C: 98-030 Hekaha St.,Unit 9 INSURER D: INSURER E: Aiea HI 96701 INSURER F: COVERAGES CERTIFICATE NUMBER: CL2311308223 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADDL SUBR POLICY EFF POLICY EXP TYPE OF INSURANCE LTR INSD WVD POLICY NUMBER (MM/DD/YYYY) (MM/DD/YYYY) LIMITS X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCEDAMAGE TO RETED $ 2,000,000 CLAIMS-MADE X OCCUR PREMISES(Ea occurrence) $ 250,000 X Prof E&O LiabilityMED EXP(Any one person) $ 5,000 A X Contractors Pollution `FEIECC10978-12 11/05/2023 11/05/20242,000,000 PERSONAL INJURY $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 POLICY X PRO- POLICY LOC PRODUCTS-COMP/OPAGG $ 2,000,000 OTHER: $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ (Ea accident) ANY AUTO BODILY INJURY(Per person) $ 1,000,000 B OWNED )/ SCHEDULED CBA1000219406 11/05/2023 11/05/2024 BODILYINJURY(Peraccident) $ 1,000,000 AUTOS ONLY /• AUTOS HIRED NON-OWNED PROPERTY DAMAGE $ 1,000,000 X AUTOS ONLY X AUTOS ONLY (Per accident) $ UMBRELLA LIAB OCCUR EACH OCCURRENCE $ EXCESS LIAB CLAIMS-MADE AGGREGATE $ DED RETENTION $ $ WORKERS COMPENSATION PER OTH- AND EMPLOYERS'LIABILITY Y/N STATUTE ER ANY PROPRIETOR/PARTNER/EXECUTIVE N/A E.L.EACH ACCIDENT $ OFFICER/MEMBER EXCLUDED? (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $ If yes.describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) Proof of ins for vehicles: 2014 ford f150 PU vin ending with 70720 2014 ford E 350 van vin ending with 91123 2012 Toyota Tacoma vin ending with 132378, 2012 Toyota Tacoma vin ending with 134373, 2012 Toyota Tacoma yin ending with 099646 comp&collision deductibles are $500 per clai CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN proof of insurance ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD ACO D CERTIFICATE OF LIABILITY INSURANCE DATE(MM/DD/YYYY) 12/27/2023 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Scott LaRue NAME: Atlas Insurance Agency,Inc. A//O,NNo,Ext): (808)533-3222 Fa/c,No): (808)533-8777 201 Merchant Street E-MAIL ADDRESS: Suite 1100 INSURER(S)AFFORDING COVERAGE NAIC# Honolulu HI 96813INSURERA: Hawaii Employers'Mutual Ins Co Inc. 10781 INSURED INSURER B ProService Advantage Inc PEO for Element Environmental,LLC INSURER C: 6600 Kalanianaole Hwy Ste 200 INSURER D: INSURER E: Honolulu HI 96825 INSURER F: COVERAGES CERTIFICATE NUMBER: 24-25 CCG31 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADDL SUBR POLICY EFF POLICY EXP TYPE OF INSURANCE LTR INSD WVD POLICY NUMBER (MM/DD/YYYY) (MM/DD/YYYY) LIMITS COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ DAMAGE TO RENTED CLAIMS-MADE OCCUR PREMISES(Ea occurrence) $ MED EXP(Any one person) $ PERSONAL&ADV INJURY $ GE 'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ PRO- POLICY JECT LOC PRODUCTS-COMP/OPAGG $ OTHER: $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ (Ea accident) ANY AUTO BODILY INJURY(Per person) $ OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS ONLY AUTOS HIRED NON-OWNED PROPERTY DAMAGE $ AUTOS ONLY AUTOS ONLY (Per accident) UMBRELLA LIAB OCCUR EACH OCCURRENCE $ EXCESS LIAB CLAIMS-MADE AGGREGATE $ DED RETENTION $ $ WORKERS COMPENSATION X STATUTE EORH AND EMPLOYERS'LIABILITY Y/N 1,000,000 A ANY PROPRIETOR/PARTNER/EXECUTIVE N/A WC0057022 01/01/2024 01/01/2025 E.L.EACH ACCIDENT $ OFFICER/MEMBER EXCLUDED? (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $ 1,000,000 If yes.describe under 1,000,000 DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) Proof of insurance certificate provided for coverages indicated. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN Element Environmental, LLC ACCORDANCE WITH THE POLICY PROVISIONS. 98-030 Hekaha Street AUTHORIZED REPRESENTATIVE Unit 9 Aiea HI 96701 ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD