|
HHF PLANNERS
<br /> PLANNING DEPARTMENT,COUNTY OF HAWAII 400places for people
<br /> E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> 12. NAME 13. ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE
<br /> rot--.yy
<br /> tina.TOTAL b.WITH CURRENT FIRM
<br /> .• Dane Sjoblom Principal-in-Charge
<br /> AICP 16 14
<br /> 15. FIRM NAME AND LOCATION(City and State)
<br /> Helber Hastert&Fee,Planners,Inc.DBA HHF Planners,Honolulu,Hawaii
<br /> 16. EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline)
<br /> MA/Urban and Regional Planning
<br /> BA/Cultural Anthropology
<br /> 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> American Institute of Certified Planners
<br /> American Planning Association
<br /> RELEVANT EXPERTISE
<br /> • 16 years of experience managing facilities assessment/management,master planning,and NEPA
<br /> environmental projects for State,County,and Federal clients in Hawaii and the US Territories
<br /> • Award-winning climate change vulnerability assessment and hazard mitigation and resilience
<br /> planning expertise
<br /> 19.RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> City and County of Honolulu Long-Term Disaster Recovery Plan PROFESSIONAL SERVICES CONSTRUCTION
<br /> Islandwide,0`ahu 2024 ICRP
<br /> a. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE X Check if project performed with current firm
<br /> Principal-in-Charge of community engagement for the Civix-led effort to develop the City's first Long-Term Disaster Recovery Plan.
<br /> The plan will provide a framework for smart and inclusive recovery related to the rebuilding of housing,businesses,health and social
<br /> services,economy,natural and cultural resources after a disaster event.Project Cost:$164K
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Medical Facility Maintenance Root Cause Analysis PROFESSIONAL SERVICES CONSTRUCTION
<br /> American Samoa,Federated States of Micronesia,Guam,Palau,and the Republic of 2023
<br /> the Marshall Islands n/a
<br /> b. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE X Check if project performed with current firm
<br /> Project Manager for a Root Cause Analysis of maintenance challenges faced by nine hospitals in the U.S.Pacific Territories and the
<br /> Freely Associated States.Mr.Sjoblom created site reports for each hospital with recommendations for improvements to facility
<br /> maintenance programs,designs,and construction methods and management practices.The reports also identified overarching
<br /> actions needed to sustain long-term improvements.Project Cost:$855K
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Office of Insular Affairs Insular ABCs Initiative Phase 3 PROFESSIONAL SERVICES CONSTRUCTION
<br /> American Samoa,CNMI,Guam,and the U.S.Virgin Islands 2022 n/a
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE X Check if project performed with current firm
<br /> c. Project Manager for development of comprehensive facility inventory and condition database,condition assessment,cost estimates,
<br /> and execution of$20M in improvement projects at the 115 public schools in four U.S.territories.Mr.Sjoblom analyzed asset
<br /> management practices and made recommendations for improvements.Facility Master Plans were created for two of the territories
<br /> that opted in for additional asset management support.NEPA-compliant environmental reviews were conducted,with extensive
<br /> local and federal agency consultation to ensure compliance with natural,cultural,and historical resource requirements in the
<br /> execution of projects with the use of federal funds.Project Cost:$5.3M
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Climate Related Vulnerability Assessment for Transportation Infrastructure: PROFESSIONAL SERVICES CONSTRUCTION
<br /> American Samoa 2020
<br /> American Samoa n/a
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE X Check if project performed with current firm
<br /> Principal-in-Charge of a study to assess the vulnerability of American Samoa's transportation assets to climate related hazards and,
<br /> d in addition to environmental factors,assessing social characteristics that influence community resilience to climate related hazards
<br /> to inform mitigation project considerations.Effort involved broad research on potential climate-related impacts,the creation of
<br /> vulnerability indices and adaption strategies for public transportation systems,interviews with American Samoa stakeholders and
<br /> regional subject matter experts,and two onsite stakeholder workshops held in June and October 2019.Project Cost:$97K
<br /> AUTHORIZED FOR LOCAL REPRODUCTION 3 STANDARD FORM 330 (7/2021)
<br />
|