My WebLink
|
Help
|
About
|
Sign Out
Home
2024-06-28 PL-INT-2024-008092 AECOM Technical Services, Inc. Category PL.6
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 24-25
>
PL - PLANNING
>
PL.06 - Land Use Codes, Studies, Form Based Codes
>
2024-06-28 PL-INT-2024-008092 AECOM Technical Services, Inc. Category PL.6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2024 12:17:21 PM
Creation date
7/10/2024 3:03:31 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/28/2024
Permit Number
PL-INT-2024-008092
Description
AECOM Technical Services, Inc., Professional services for category PL.3, PL.4, PL.5, PL.6, PL.9
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AECOM I County of Hawaii,Planning Department,Fiscal Year 2024-2025 <br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> Adriane Truluck 19.RELEVANT PROJECTS(continued) <br /> e. (1)TITLE AND LOCATION(City and State) See Project#9 in Section F (2)YEAR COMPLETED <br /> Shipyard Infrastructure Optimization Program(STOP)Advanced Planning Studies PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> and Area Development Plans(Pearl Harbor Naval Shipyard, Puget Sound Naval 2023 N/A <br /> Shipyard, Norfolk Naval Shipyard,and Portsmouth Naval Shipyard) <br /> or.icr uc5L.nir Ilulu i acuN a uL)64. Q Check if project performed with current firm <br /> Shipyard Task Lead and Cultural Landscapes Lead on this nationwide program, intended to address modernization requirements at the <br /> four main U.S. Navy shipyards,supporting resource identification and stewardship as part of a long-range planning process for necessary <br /> modernization activities.This role focused on leading efforts to conduct multiple cultural and historic resource studies,completing Cultural <br /> Landscapes study task as part of the Cultural Resources study at Puget Sound,and supervising the Cultural Landscapes study task at Norfolk. <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021)PART I -PAGE 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.