Laserfiche WebLink
AECOM I County of Hawaii,Planning Department,Fiscal Year 2024-2025 <br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12. NAME 13.ROLE IN SERVICE CATEGORY 14.YEARS EXPERIENCE <br /> A.TOTAL B.VV1TH CURRENT FIRM <br /> Mark Hofferbert,PE Senior Project Manager <br /> 39 31 <br /> 15.FIRM NAME AND LOCATION(City and State) AECOM Technical Services, Inc.(Honolulu, Hawaii) <br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> MS,Civil Engineering Professional Engineer:#PE-15964(Hawaii, Civil) <br /> BA,Anthropology Professional Engineer:#077870(New York, Civil) <br /> AA,Civil Engineering <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> Mark Hofferbert has 39 years of experience in environmental engineering and construction management. He has provided senior consulting <br /> services to multiple commercial, County, State,and Federal clients throughout North America and Southeast Asia. His areas of technical expertise <br /> include remedial investigations,feasibility studies, remedial designs,and remedial construction. Mark has specialized experience in solid and <br /> hazardous waste management, investigation and remediation of impacted sediments,brownfields cleanups,petroleum sector consulting,and <br /> management of former manufactured gas plant sites. <br /> Organizations-Member of the American Society of Civil Engineers and Western Dredging Association <br /> Training-OSHA HAZWOPER 40-Hour and 8-Hour Refresher and EPA Radon Mitigation Contractor <br /> 19.RELEVANT PROJECTS <br /> a. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> CCH,ENV,Kapaa Transfer Station Renovation PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> (Kailua, HI) 2022 2022 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm <br /> Project Manager on the transfer station renovation design that increased the Refuse Division's green waste handling efficiency at the Kapaa solid <br /> waste transfer station.AECOM managed environmental planning,and preparation of the design,specifications,and bid package for a new loadout <br /> structure. <br /> b. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> County of Kauai,DPW,Kekaha Landfill Cell 2 Expansion PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> (Kekaha, HI) 2020 2020 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm <br /> Project Manager on the design of the lateral expansion Cell 2 of the County's only operational solid waste landfill.AECOM was responsible for <br /> the planning,design,and permitting services for the project. <br /> c. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> County of Kauai,DPW, New Kauai Landfill and Resource Recovery Park PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> (Various Locations on Kauai, HI) 2019 N/A <br /> (3)BRIEF DESCRIPTION(Bnefscope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm <br /> Project Manager on the$2,643,860 project that involved the preparation of an Environmental Impact Statement for the County's potential <br /> municipal solid waste landfill and resource recovery park site.AECOM managed public outreach,agency consultation,a traffic feasibility study,a <br /> wildlife hazard mitigation plan,detailed conceptual designs,and identified potential environmental impacts and solutions. <br /> d. (1)TITLE AND LOCATION(City and State (2)YEAR COMPLETED <br /> County of Kauai,DPW, New Kauai Landfill and Resource Recovery PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> (Various Locations on Kauai,HI) 2019 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm <br /> Project Manager on the$2,643,860 project that involved the preparation of an Environmental Impact Statement for the County's potential <br /> municipal solid waste landfill and resource recovery park site.AECOM managed public outreach,agency consultation,a traffic feasibility study,a <br /> wildlife hazard mitigation plan,detailed conceptual designs,and identified potential environmental impacts and solutions. <br /> e. (1)TITLE AND LOCATION(City and State (2)YEAR COMPLETED <br /> County of Kauai,DPW,Storm Water Improvements at Four Refuse Transfer PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Stations (Various Locations on Kauai,HI) 2017 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm <br /> Project Manager for conceptual planning,design,permitting,and design improvements to the storm water and leachate management systems at <br /> the four Kauai refuse transfer stations. Evaluated site conditions,to determine compliance issues,and oversaw development of conceptual facility <br /> design improvements. <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021)PART I -PAGE 17 <br />