|
11I 1101' " I tr• • ; I 'A 1' / IA 1 A • ` I ' •1
<br /> (Present no more than 10 projects,with emphasis on previous City projects.Complete one Section F for each project.)
<br /> 21.TITLE AND LOCATION(City and State) ° 22.YEAR COMPLETED
<br /> Boundary Studies and Surveys for Various Army PROFESSIONAL SERVICES CONSTRUCTION Ifappticabte)
<br /> Installations Oahu, and Island of Hawaii, Hawaii 2018 N/A
<br /> 23.PROJECT OWNER'S INFORMATION
<br /> a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER
<br /> US Army Corps of Engineers Honolulu Ms. Tammy Luke (808) 835-4078
<br /> District
<br /> 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost)
<br /> The Boundary Studies and Surveys for Various Army
<br /> Installations, Oahu, and Hawaii Island represents one of
<br /> the largest survey projects accomplished by any Hawaii
<br /> •m
<br /> survey firm, demonstrating that SOH, as a small business,
<br /> can successfully complete a large and complex boundary �;
<br /> and topographic survey project across various types of
<br /> terrain. Totaling 120,974 acres and 8 US Army facilities ."
<br /> the boundary and topographic survey services included .r ' ,, ,r 'A
<br /> title reports, recovery of boundary evidence, staking of , '% „ � , • •r
<br /> missing boundary corners, location of installation A ` - filo/ •
<br /> `
<br /> perimeter fence, and location of improvements 5 feet •� �� °
<br /> beyond the property boundary. Cadastral survey grade ,~
<br /> ArcGIS geodatabase development including collection of �� . � M , ,..
<br /> hard copies, validation of existing survey and title
<br /> information and creation of parcel /boundary data and monumentation.
<br /> Work included new aerial surveys, identification of adjacent properties, internal boundaries within the
<br /> installation for ACTUS/IPC property, HECO easements, installation or replacement of missing monuments, and
<br /> field verification of encroachments and conflicts. In addition, new title reports for each installation were
<br /> included.
<br /> Surveys also included the installation and location of ground control points for reference by the aerial survey.
<br /> Project deliverables included ArcGIS Geodatabase and metadata for boundaries, survey controls, and
<br /> monumentation.
<br /> Installations surveyed were Aliamanu Military Reservation, Kipapa Gulch, Mokuleia(Old Nike Site), Schofield
<br /> Barracks, Pohakuloa Training Area, Fort Shafter and Shafter Flats, Tripler Army Medical Center, Wheeler
<br /> Army Air Field, East Range and Fort DeRussy Military Reservation.
<br /> "Although the description of the project appears to be straight forward and easily accomplished, this project
<br /> has turned out to be very complicated.... Although standard boundary documents were used, Army unrecorded
<br /> documents and easement discovery was very time consuming, and SOH committed overtime efforts to remain on
<br /> schedule.
<br /> With all of the hurdles that SOH had and continues to overcome, they remain professional, courteous and
<br /> responsive. SOH does not seek modifications readily; they work with us to provide the best quality submittals.
<br /> They are always available to meet with us, and they are very helpful in situations where solutions are required.”
<br /> 25.FIRMS INVOLVED WITH THIS PROJECT
<br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE
<br /> a. Sam O. Hirota Honolulu, Hawaii Prime-Boundary Surveying and Mapping
<br /> STANDARD FORM 330 (REV.7/2021)
<br />
|