Laserfiche WebLink
AECOM I County of Hawaii,Planning Department,Fiscal Year 2024-2025 <br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12. NAM 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> A.TOTAL B.VV1TH CURRENT FIRM <br /> Melia Waring Environmental Planner I 2 1 <br /> 15.FIRM NAME AND LOCATION(City and State) AECOM Technical Services, Inc.(Honolulu, Hawaii) <br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> BS,Science Management N/A <br /> Certification, Hazardous Waste Operations and Emergency Response <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> Melia Waring is an Environmental Planner at AECOM,based in Honolulu, Hawaii.She recently graduated with honors from Pitzer College with <br /> a degree in science management and a concentration in environmental science. Her background includes work with data/statistical analysis in <br /> Microsoft Excel and projects related to climate change mitigation and ecology. She also has experience with the bioproduction industry from her <br /> work in Keck Graduate Institute's Amgen Bioprocessing Center Lab. Her fieldwork experience has allowed her to gain familiarity with soil and water <br /> sampling. <br /> 19.RELEVANT PROJECTS <br /> a. (1)TITLE AND LOCATION(City and State) See Project#2 in Section F (2)YEAR COMPLETED <br /> Inventory of the Oahu Railway and Land Company Right-of-Way PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> (Honolulu, HI) 2024 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm <br /> Field Survey Team. Inventory of historic,extant character-defining features of the OR&L ROW for the National Register of Historic Places. <br /> Compile historical data and archival data,execute field work and data monitoring. <br /> b. (1)TITLE AND LOCATION(City and State) See Project#3 in Section F (2)YEAR COMPLETED <br /> Hawaii State Park System-wide Design Guidelines with Concepts and PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Construction Drawings for Accessible Campsite Improvements (Statewide, HI) 2023-Ongoing 2025(est.) <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm <br /> Environmental Planner.System-wide design guidelines and standards for Hawaii State Parks campgrounds. Support guidelines,site visits,and <br /> project coordination.This multi-phase project will develop concept designs for ADA access and related improvements for campsites and develop <br /> design guidelines and standards for future implementation across Hawaii State Parks campgrounds. <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021)PART I -PAGE 15 <br />