Laserfiche WebLink
AECOM I County of Hawaii,Planning Department,Fiscal Year 2024-2025 <br /> F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY NUMBER <br /> QUALIFICATIONS FOR THIS CONTRACT O <br /> (Present as many projects as requested by the agency, or 10 projects, if not specified. <br /> Complete one Section F for each project.) <br /> 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED <br /> Shipyard Infrastructure Optimization Program(STOP)Advanced Planning Studies and PROFESSIONAL CONSTRUCTION <br /> Area Development Plans (Pearl Harbor Naval Shipyard, Puget Sound Naval Shipyard, Norfolk Naval SERVICES (If applicable) <br /> Shipyard,and Portsmouth Naval Shipyard) 2023(est.) N/A <br /> „ u 23.PROJECT OWNER'S INFORMATION <br /> a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER <br /> (808)473-0471 -Office <br /> NAVFAC Pacific Curtis Lum, Facilities Planner (808)428-7408-Cell <br /> curtis.a.lum.civ@us.navy.mil <br /> 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS SERVICE CATEGORY(Include scope,size,and cost) <br /> Project Information <br /> Period of Performance:09/13/2019-04/26/2023(est.) <br /> �. _ _ Cost:$1.3M(Fee) <br /> Past Performance <br /> Quality Schedule Cost Management <br /> • <br /> Planning Studies <br /> AECOM is preparing 17 advanced planning studies at the four naval <br /> shipyards. <br /> AECOM conducted a two-week site visit to gather data, including visits <br /> Pearl Harbor Naval Shipyard(PHNSY)and IMF and interviews at each of the shipyards.The data gathered will be used <br /> to validate and confirm the finalized list of 17 studies. <br /> The Naval Sea Systems Command(NAUSEA)has instituted a program AECOM is developing full scopes of work, rough order of magnitude <br /> to modernize and optimize the Navy's four(4)public naval shipyards. (ROM)cost estimates,and schedules for all 17 studies based on the <br /> The program is currently conducting advanced planning necessary to site visit and data gathered.AECOM is also preparing a phasing and <br /> identify specific investments needed at each shipyard. execution plan to draft and obtain government concurrence on the <br /> scope of each study,identifying the critical path studies that must be <br /> This advanced planning is being conducted in three(3)phases. Phase completed to start the master planning effort and studies integral to <br /> I,completed in February 2018,studied the major product line industrial project development that are less time sensitive. <br /> processes and the associated facilities at the shipyards.This phase re- <br /> sulted in a notional layout of facilities configured to optimize current pro AECOM is completing all recommended studies within 9 months from <br /> cesses by reducing transportation and motion of workers,components, initiation.The 17 studies include: <br /> and materials between facilities.A Report to Congress was issued at the <br /> conclusion of Phase I. Phase II,Advanced Planning Studies will develop Flood Plain Study:AECOM is updating FEMA 100-year and 500-year <br /> new optimized production processes,conduct advanced planning/ floodplain mapping, including modeling and analysis.This includes a <br /> engineering studies and complete area development/installation master floodplain study report and survey-grade ArcGIS data development. <br /> plans for the four naval shipyards. <br /> Storm Water System Study:AECOM is conducting engineering in- <br /> AECOM is preparing advanced planning studies and area development spections,evaluation,and hydrologic modeling and watershed analysis <br /> plans at each of the four naval shipyards: of the existing storm water management systems. <br /> •Pearl Harbor Naval Shipyard(PHNSY)and IMF Land Ownership Real Estate Study:AECOM is conducting archival <br /> •Puget Sound Naval Shipyard(PSNS)and IMF research of historic maps,documents and aerial photos to create a <br /> • Norfolk Naval Shipyard(NNSY) complete <br /> •Portsmouth Naval Shipyard (PNSY) record of Government interest/ownership in land for the shipyard <br /> including grants, leases,and permits.The study will evaluate existing <br /> records and studies, including verification of existing land surveys and <br /> encroachment issues. <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021)PART I -PAGE 27 <br />