My WebLink
|
Help
|
About
|
Sign Out
Home
2024-06-28 PL-INT-2024-008096 Bowers + Kubota Consulting Category PL.10
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 24-25
>
PL - PLANNING
>
PL.10 - Writer, Grant Writer
>
2024-06-28 PL-INT-2024-008096 Bowers + Kubota Consulting Category PL.10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2024 12:36:31 PM
Creation date
7/1/2024 10:15:37 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/28/2024
Permit Number
PL-INT-2024-008096
Description
Bowers + Kubota Consulting, Professional services for category PL.3, PL.4, PL.5. PL.10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY <br /> QUALIFICATIONS FOR THIS CONTRACT NUMBER <br /> (Present as many projects as requested by the agency,or 10 projects,if not specified. 5 <br /> Complete one Section F for each project.) <br /> 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED <br /> City and County of Honolulu,Department of Design and Construction PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Ala Moana Regional Park Master Plan and Final Environmental Impact Statement 2019 N/A <br /> Honolulu,HI <br /> 23.PROJECT OWNER'S INFORMATION <br /> a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER <br /> Biederman Redevelopment Ventures <br /> (Prime Consultant)for City and County Benjamin Donsky(Biederman) (212)390-1122 <br /> of Honolulu,Department of Design and Elaine Morisato(C&CH) (808)768-8406 <br /> Construction <br /> 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) <br /> SCOPE:Bowers+Kubota Consulting supported the City in developing portions of the Preferred Concept Master Plan for Ala Moana <br /> Regional Park(Ala Moana)and preparing its corresponding Environmental Impact Statement(EIS). The goal of the master plan was <br /> to provide a planning framework allowing Ala Moana to become a multi-faceted beach park and even greater asset to the community. <br /> The master plan evaluated the park's existing conditions and identified areas of improvement including landscape features, <br /> infrastructure,parking and pathways,and the park's iconic beach front.The 17 proposed improvement projects focused on addressing <br /> deferred maintenance to elevate the park's existing facilities and address coastal erosion issues while respecting and celebrating the <br /> established character. As part of the master planning process,the B+K Planning Group prepared and published a final EIS analyzing <br /> the proposed improvements established in the master plan. <br /> As part of the environmental review process, the B+K Planning group investigated the project's potential effects on the built and <br /> natural environments and provided mitigation measures to help minimize impacts pursuant to Hawaii Revised Statues, Chapter 343. <br /> This analysis included analyzing the need for beach nourishment and drainage canal improvements to address impacts from natural <br /> and climate change hazards like sea level rise. The EIS also analyzed the project's compliance with relevant federal, state,and county <br /> land uses regulations and policies. <br /> To develop the alternatives in the master plan and EIS,a strong community engagement and outreach program was conducted to better <br /> understand the multi-generational impact of Ala Moana on the community.Multiple public,in-person informational meetings were held <br /> between 2015 and 2018 and a project website titled"Our Ala Moana Park"was launched to garner community feedback.Incorporating <br /> input from over 30,000 visitor interactions at the website,feedback from the in-person community meetings and consultation responses <br /> from the EIS resulted in the design alternatives presented in the master plan and EIS.Additionally,during the community engagement <br /> process the master planning team was informed of more urgent actions needed at Ala Moana. This prompted the City to enact a nine- <br /> point plan to address these issues in parallel with the long-term master plan creating a holistic approach to improving the park long- <br /> term. <br /> PROJECT VALUE: $367,000 <br /> Elso-.o P 2 O uirrat Fre t:rvaFion .Er lc! <br /> ...t <br /> • <br /> E;0tJP'.=lARY �a iaoo 4 va <br /> 1 i <br /> 31111 <br /> IC PrecFI1Gt <br /> �, t •: .ik,ik�fipcc.a l iJslnci: <br /> 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> Planner,Civil Engineer,Landscape <br /> a. , Bowers+Kubota Consulting,Inc. Waipahu,HI Architect <br /> STANDARD FORM 330(7/2021)Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.