Laserfiche WebLink
County of Hawai'i <br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.ROLE IN SERVICE CATEGORY 14.YEARS EXPERIENCE <br /> Michele Lefebvre, Ph.D. Project Manager, a.TOTAL b.WITH CURRENT FIRM <br /> Environmental Scientist 21 14 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> Stantec GS Inc. (Honolulu, HI) <br /> Stantec GS Inc.is owned and operated by Stantec Consulting Services Inc.through an internal affiliated operations plan. <br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> Ph.D., Biology N/A <br /> BA, Biology <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> Certifications and Training: Adjunct lecturer at University of Hawaii, Hilo—Environmental Impact Assessment ENSC <br /> 441, Spring 2019; NEPA and 24 CFR Part 58 Environmental Review Procedures for Entities Assuming HUD <br /> Environmental Responsibilities, Hilo, HI; Vegetation of the Hawaiian Islands (audited course ENSC-457); NEPA <br /> Cumulative Effects Analysis & Documentation, San Francisco, CA <br /> Memberships: National Association of Environmental Professionals;American Exploration and Mining Association <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Kaloko Affordable Housing Project HRS 343 and HUD NEPA, PROFESSIONAL CONSTRUCTION(If applicable) <br /> Environmental Assessments (Kaloko, HI) SERVICES N/A <br /> 2018 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> a. Scope: Michele is coordinating with the applicant(Hawaii Island Community Development Corporation)and a local <br /> sub-consultant(Geometrician Associates LLC)to prepare the EAs. She helped to collect the traffic data and <br /> coordinated the preparation and completion of the Traffic Impact Assessment Report(TIAR)for the project with a <br /> Stantec traffic engineer. Michele also coordinated the water impact assessments with two local hydrologist sub- <br /> consultants and the assessment of cultural impacts with a local cultural resource firm. Scope: Environmental <br /> Assessments • Size: Hawaii Island • Cost: $146K• Role: Project Manager <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Puna Geothermal Venture HEPA EIS, Pahoa, HI PROFESSIONAL CONSTRUCTION(If applicable) <br /> SERVICES N/A <br /> 2023 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE El Check if project performed with current firm <br /> b Scope: Michele was responsible for preparing a HEPA EIS for the upgrade of equipment at Ormat Technologies <br /> operating geothermal power plant near the Kilauea Volcano on Hawaii Island. The upgrade of equipment would <br /> reduce the footprint, emissions, and noise compared to current operations. The need for the EIS has been identified <br /> by the Public Utilities Commission. Coordinating baseline surveys, coordinating with the approving agency(Planning <br /> Department), organizing public outreach, and preparing the impact analysis for the EIS. Public concerns about the <br /> project include air quality, water quality, geologic hazards, and noise. • Size: N/A• Cost: $462K• Role: Project <br /> Manager/Biologist <br /> STANDARD FORM 330(REV.7/2021)PAGE <br />