My WebLink
|
Help
|
About
|
Sign Out
Home
2024-06-30 PL-INT-2024-008123 Stantec Category PL.11
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 24-25
>
PL - PLANNING
>
PL.11 - Socio-Economic, Housing Studies
>
2024-06-30 PL-INT-2024-008123 Stantec Category PL.11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2024 1:48:40 PM
Creation date
7/10/2024 3:22:31 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/30/2024
Permit Number
PL-INT-2024-008123
Description
Stantec, Professional services for category PL.3, PL.4, PL.5, PL.10, PL.11, PL.13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County of Hawai'i <br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> "London 2100"Water Strategic Plan (London, United PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Kingdom) Ongoing N/A <br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Scope: John and the Stantec team helped Thames Water District facilitate the design of a community-based <br /> d. (year—2100)vision for water. London's water infrastructure, which is approaching 200-years old, is being <br /> revisited to identify strategies for meeting increased demand because of projected four-fold population growth. <br /> The vision includes separating storm and sanitary systems, harvesting rainwater, gray water industrial reuse <br /> supported by innovative, and sustainable funding strategies. • Size: N/A • Cost: $1.7M • Role: Resilience <br /> Global SME <br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Tottenville Beach Recovery and Restoration (Staten Island, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> NY) Ongoing N/A <br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Scope: This HUD sponsored Rebuild by Design project strives to stabilize shoreline, reduce coastal flood risk, <br /> e. and protect the local economy. John and the Stantec team's resilient solution currently under design includes <br /> integrated living shorelines, elevated walking trails, green infrastructure, ecosystem restoration and matrix of <br /> natural and reinforced sand dunes. Scope: Resiliency planning, Living shorelines/wetlands/shoreline <br /> protection, Civil engineering/stormwater management and modeling, Coastal berms/landscaping, Elevated <br /> roads and pathways, Community outreach, multi-federal agency coordination, HUD grant administration, and <br /> Flood risk reduction • Size: Staten Island • Cost: N/A• Role: Technical Advisor <br /> STANDARD FORM 330(REV.7/2021)PAGE <br />
The URL can be used to link to this page
Your browser does not support the video tag.