|
County of Hawai'i
<br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12.NAME 13.ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br /> John Malueg, PE Vice President, Sustainability and a.TOTAL b.WITH CURRENT FIRM
<br /> Resiliency Planning 39 24
<br /> 15. FIRM NAME AND LOCATION(City and State)
<br /> Stantec Consulting Services Inc. (Winston-Salem, NC)
<br /> 16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION(State and Discipline)
<br /> BS, Water Biology Professional Engineer(Civil)#15642, KY
<br /> BS, Civil and Environmental Engineering
<br /> 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> Memberships: Water Environment Federation; Member, American Public Works Association; American Society of Civil
<br /> Engineers
<br /> 19. RELEVANT PROJECTS
<br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Ala Wai Watershed Resilience Master Plan Support PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> (Honolulu, HI) Ongoing N/A
<br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Scope: In 2018, Congress passed an emergency appropriations bill which included a$350 million allocation in
<br /> a. support of mitigating flooding in the Ala Wai Watershed. Stantec, in partnership with the Rockefeller
<br /> Foundation's 100 Resilient Cities, was selected to assist the local sponsor, the City/County of Honolulu,
<br /> negotiate the development of the partnering agreement with the USACE. Key project elements include
<br /> planning and design of series of high head dams, low flow diversion channel through local golf course, and
<br /> integration of proposed new canal floodwall and levee with community open space and complete streets
<br /> visions. • Size: N/A• Cost: N/A • Role: Technical Advisor
<br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> HUD National Disaster Resilience Completion (NDRC) Phase PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> 2 (Multiple Jurisdictions, Nationwide) 2016 2016
<br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> b. Scope: John served as lead and technical advisor for the development of seven NDRC Phase 2 grant
<br /> applications. Individual value of federal grant funding solicited ranged from $200,000 to $865,000,000. Clients
<br /> included states, counties, and districts. Hazards address ranged from sea-level rise, tornadoes, hurricanes,
<br /> riverine flooding, heat and subsidence. Resilient solutions offered focused on maximizing the triple bottom line
<br /> addressing social, economic, and environmental values. The value of grants awarded to our clients approached
<br /> $250 million. • Size: N/A• Cost: $2.1 M Role: Program Manager/Technical Advisor
<br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> "Strategic Financial Pathways", "Living with Water" Blue- PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Green Corridor Design (New Orleans, LA) Ongoing N/A
<br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Scope: In partnership with the City of New Orleans and Rockefeller Foundation (100RC), John completed
<br /> C. analyses and facilitated workshops that evaluated the right mix of green and grey infrastructure and financial
<br /> mechanisms to pay and maintain improvements.Analysis considered level of service, implementation period
<br /> and included evaluation of a blend of millage, stormwater user fees, fee-in-lieu-of, tourism taxes, and external
<br /> grant funding to pay for selected plan. The project has now evolved into detailed design of blue-green
<br /> infrastructure. • Size: N/A• Cost: $6.5M • Role: Resilience Technical SME
<br /> STANDARD FORM 330(REV.7/2021)PAGE
<br />
|