My WebLink
|
Help
|
About
|
Sign Out
Home
2024-06-30 PL-INT-2024-008123 Stantec Category PL.13
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 24-25
>
PL - PLANNING
>
PL.13 - Fauna Survey
>
2024-06-30 PL-INT-2024-008123 Stantec Category PL.13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2024 1:48:40 PM
Creation date
7/1/2024 10:29:50 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/30/2024
Permit Number
PL-INT-2024-008123
Description
Stantec, Professional services for category PL.3, PL.4, PL.5, PL.10, PL.11, PL.13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County of Hawai'i <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Matsuyama Commercial Center on NELHA Land HRS 343, PROFESSIONAL CONSTRUCTION(If applicable) <br /> Environmental Assessment(Kailua-Kona, HI) SERVICES 2023 <br /> 2018 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Z Check if project performed with current firm <br /> c' <br /> Scope: Michele coordinated with the applicant(Mats4 LLC)and the approvinagency(Natural EnergyLaboratory of <br /> Hawaii Authority)to prepare the EA. Her responsibilities included working with the agency to identify issues, conduct <br /> public comments analysis, and write the Draft and Final EA. Michele helped to collect the traffic data and coordinated <br /> the preparation and completion of the TIAR for the project with a Stantec traffic engineer. Michele also coordinated <br /> the biological survey with a local sub-consultant and the assessment of cultural impacts with a local cultural resource <br /> firm. • Size: Hawaii Island • Cost: $44K • Role: Project Manager <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Fenway Development Project HEPA EA(South Kona, HI) PROFESSIONAL CONSTRUCTION(If applicable) <br /> SERVICES N/A <br /> 2023 <br /> d. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE El Check if project performed with current firm <br /> Scope: Michele prepared a HEPA EA for this multi-unit two-phase housing development in South Kona. Coordinating <br /> the update to the biological survey and conducting a traffic impact analysis for the project. Stantec will coordinate with <br /> the applicant and approving agency (Planning Department)through EA approval. • Size: N/A• Cost: $111K• Role: <br /> Project Manager/Biologist <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> HELCO Saddle Road Transmission Line Re-build Project— PROFESSIONAL CONSTRUCTION(If applicable) <br /> Baseline Surveys and Stakeholder Outreach (Hawai'i, HI) SERVICES N/A <br /> 2019 <br /> e. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> Scope: Michele coordinated with stakeholders (private landowners, local agencies, and Pohakuloa Training Area)to <br /> obtain permission for local subconsultants to conduct a biological survey and archaeological inventory for this cross- <br /> island transmission line. For this survey, Stantec also assisted HELCO with identifying alternative line alignments for <br /> the inventory to ensure baseline data would be available for the project's future NEPA and/or HRS 343 analysis. • <br /> Size: Hawaii Island • Cost: $269K • Role: Project Manager <br /> STANDARD FORM 330(REV.7/2021)PAGE <br />
The URL can be used to link to this page
Your browser does not support the video tag.