Laserfiche WebLink
Mr. Zendo Kern, II)irector <br />page 2 <br />July 19, 2024 <br />For the applicant's information, final subdivision approval will be subJect to compliance with the <br />following requirements: <br />Construct necessary water system improvements, which shall include, but not be limited to: <br />water mains capable of delivering water at adequate pressure and volume under <br />peak -flow and fire -flow conditions; minimum diameter of'mains shall be 6 Inches from <br />the end ofthe existing 8 -in waterline within Ohiohi Street, <br />b. service laterals that will accommodate 5/8 -inch sized meters, to each lot, <br />existing service laterals, must be cut and plugged at the rnain and relocated to the <br />appropriate lot, <br />d. fire hydrants spaced no more than 600 feet apart and within 300 feet of the driveway or <br />access for each lot. On dead-end streets, the last fire hydrant shall be located at one -hal I' <br />the distance from file last house, or -unit, fronting the property line, or to the driveway or <br />access for the property, and <br />sub pect to other agencies' requirements to construct improvements within the road <br />right-of-way fronting the property affected by the proposed development, the applicant <br />shall be responsible For the relocation and adJustment ofthe Department's, afltccted <br />water systcai facilities, should they be necessary. <br />Submit construction plans and design calculations prepared by a professional engineer, <br />registered in the State of Hawaii, f'or review and approval. <br />2. Remit the prevailing facilities charge, which is subject to change, as shown below: <br />FACILITIES CHARGI", (FC)� <br />2 existing services (3 equivalent units) $OX)o <br />20 additional units $6,095.00/unit <br />Total F'C S121,900.00 <br />This is due and payable upon completion of the installation of the required water system <br />improvements and prior to final subdivision approval being granted. <br />For your infortnation, water corm-nitment deposits are credited towards the final facilities <br />requirement for the development. Note that the amount of water commitment deposit may <br />exceed the prevailing Facilities charge arnount; for example, when requests for tirne extensions <br />continue and are approved. Until the development is finally completed, these are separate and <br />Unrelated itcnis. In the event that water commitment deposits exceed the facilities charge, no <br />refunds are applicable. <br />