My WebLink
|
Help
|
About
|
Sign Out
Home
PowerPoint Presentation Planning Director PL-PDI-2024-000008
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2024
>
2024-09-19 Leeward
>
Item #4 Initiator Planning Director (PL-PDI-2024-000008)
>
Info Given at LPC 9-19-24 Hearing
>
PowerPoint Presentation Planning Director PL-PDI-2024-000008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 8:35:16 AM
Creation date
9/19/2024 3:16:32 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
9/19/2024
Description
PD PowerPoint presentation LPC 9-19-24
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RelatingPOSED AMENDMENTS <br /> toStandards <br /> Reason for the Amendment: The Planning Director is encouraging co-location in an effort to <br /> improve coverage and capacity in high-demand areas while reducing the need for additional <br /> towers, and expediting the approval process. A new plan approval will be required if the co- <br /> location results in a "substantial" change as defined by the Federal Communications Commission \ <br /> (FCC) Section 6409(a) of the Spectrum Act. <br /> According to the FCC, a modification is deemed "substantial" if it involves a height increase of <br /> more than 10% or one additional antenna array (up to 20 feet) for towers outside public rights- <br /> of-way, or more than 10% or 10 feet for towers within public rights-of-way and base stations; a <br /> width increase of more than 20 feet or the width of the tower structure for towers outside public <br /> rights-of-way, or more than 6 feet for towers within public rights-of-way and base stations; <br /> installation of more than four new equipment cabinets, or one new cabinet if no pre-existing <br /> cabinets or ground cabinets increasing by more than 10% in size for towers within public rights- <br /> of-way and base stations; any excavation or deployment outside current property boundaries; <br /> modifications that defeat existing concealment elements; and non-compliance with prior <br /> conditions of approval unless due to specified changes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.