My WebLink
|
Help
|
About
|
Sign Out
Home
Powerpoint PDI Telecommunication PL-PDI-2024-000008
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2024
>
2024-09-05 Windward
>
Item #8 Planning Director Initiated (PL-PDI-2024-008) Re: Telecom Antennas and Towers
>
Info given at WPC 9/5/24
>
Powerpoint PDI Telecommunication PL-PDI-2024-000008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 8:34:12 AM
Creation date
10/15/2024 8:28:33 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
8/15/2024
Description
Powerpoint PDI Telecommunication PL-PDI-2024-000008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROPOSED AMENDMENTS conditions of approval unless due to specified changes.compliance with prior -modifications that defeat existing concealment elements; and nonway and base stations; <br /> any excavation or deployment outside current property boundaries; -of-cabinets or ground cabinets increasing by more than 10% in size for towers within public rightsexisting -installation <br /> of more than four new equipment cabinets, or one new cabinet if no preway and base stations; -of-way, or more than 6 feet for towers within public rights-of-rightswidth increase of <br /> more than 20 feet or the width of the tower structure for towers outside public way and base stations; a -of-way, or more than 10% or 10 feet for towers within public rights-of-more <br /> than 10% or one additional antenna array (up to 20 feet) for towers outside public rightsAccording to the FCC, a modification is deemed “substantial” if it involves a height increase <br /> of (FCC) Section 6409(a) of the Spectrum Act.location results in a “substantial” change as defined by the Federal Communications Commission -towers, and expediting the approval process. <br /> A new plan approval will be required if the codemand areas while reducing the need for additional -improve coverage and capacity in highlocation in an effort to -The Planning Director <br /> is encouraging co Reason for the Amendment: Relating to Standards <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.