Laserfiche WebLink
PROPOSED AMENDMENTS conditions of approval unless due to specified changes.compliance with prior -modifications that defeat existing concealment elements; and nonway and base stations; <br /> any excavation or deployment outside current property boundaries; -of-cabinets or ground cabinets increasing by more than 10% in size for towers within public rightsexisting -installation <br /> of more than four new equipment cabinets, or one new cabinet if no preway and base stations; -of-way, or more than 6 feet for towers within public rights-of-rightswidth increase of <br /> more than 20 feet or the width of the tower structure for towers outside public way and base stations; a -of-way, or more than 10% or 10 feet for towers within public rights-of-more <br /> than 10% or one additional antenna array (up to 20 feet) for towers outside public rightsAccording to the FCC, a modification is deemed “substantial” if it involves a height increase <br /> of (FCC) Section 6409(a) of the Spectrum Act.location results in a “substantial” change as defined by the Federal Communications Commission -towers, and expediting the approval process. <br /> A new plan approval will be required if the codemand areas while reducing the need for additional -improve coverage and capacity in highlocation in an effort to -The Planning Director <br /> is encouraging co Reason for the Amendment: Relating to Standards <br /> <br />