My WebLink
|
Help
|
About
|
Sign Out
Home
2024-10-29 Naomi Melamed Testimony Bill 194
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2024
>
2024-11-01 Windward
>
Item #8 County Council PL-CCI-2024-000009
>
Item #8 Bill 194 Testimony 10/28-10/31
>
2024-10-29 Naomi Melamed Testimony Bill 194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2024 4:08:08 PM
Creation date
10/29/2024 4:08:08 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
10/29/2024
Description
Email Testimony
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Comparison of Bill 194 and Planning’s Bill for Cell Tower Plan Approvals <br />Bill 194 Planning’s Bill <br />Section 25-2-74(1) requires a plot plan showing Section 25-2-74(1) requires a plot plan showing <br />the location of the proposed antenna or tower location on the building site of the proposed <br />and all buildings and uses within three hundred antenna or tower. <br />feet thereof. <br /> <br /> <br />Section 25-2-74(2) requires an elevation Has no such provision. <br />drawing of the building site showing height <br />comparisons of all existing structures on <br />building site <br /> <br />Section 25-2-74(3) requires building plans for Section 25-2-74(2) requires building plans for <br />the <br />engineer, stating the maximum load of the <br />towermiles per hour. <br />per hour, or the applicable standard set forth in <br />the current building code, whichever is greater. <br /> <br />Section 25-2-74(5) Removes a provision Section 25-2-74(3) Keeps the original provision <br />requiring a statement from the Federal requiring a statement from the Federal <br />Communications Commission that the Communications Commission that the <br />application complies with the regulations and application complies with the regulations and <br />that <br />replaces that with requiring a report prepared <br />Hawai‘i as a professional electrical engineer <br />all applicable standards and regulations, <br />emissions, of the Federal Communications <br />Commission and the State of Hawai‘i <br /> <br />Section 25-2-74(6) requires electrical drawings Has no such provision. <br />equipment, prepared, designed and stamped <br />the State of <br />Hawai‘i as a professional electrical engineer. <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.