My WebLink
|
Help
|
About
|
Sign Out
Home
2024-11-18 Lisa Hall
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2024
>
2024-11-21 Leeward
>
Item #1 Jekaterina Mysin SMA-2021-000078
>
Testimonies 2024-11-16 to 2024-11-18
>
2024-11-18 Lisa Hall
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2024 6:35:20 PM
Creation date
11/18/2024 6:35:17 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
11/18/2024
Description
2024-11-18 Lisa Hall testimony
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Planning Department. The current report was based on preliminary <br /> proposals and fails to account for the significant and drastic changes in <br /> nature and scope that have since been made to the project, including the <br /> addition of an underground parking garage and major excavation work. <br /> Originally, the plan involved minimal grading at ground level, but the <br /> revised proposal involves digging 9 feet into lava rock. This drastic change <br /> in scope renders the original background report irrelevant, inaccurate and <br /> obsolete. Given how important this report is to the public's understanding <br /> and participation, it cannot serve as a valid reference for any decision- <br /> making or public comment. It is essential that the report be updated to <br /> reflect the current plans before it is presented to the Leeward Planning <br /> Commission. <br /> Currently, the record reflects 346 Signatures OPPOSING THIS PERMIT, and <br /> 67 Written Letters AGAINST THIS PERMIT and 0, none, not a single one, <br /> zero, for issuing this permit as requested. This high level of community <br /> concern cannot be ignored. The Planning Commission must take the time to <br /> carefully review the reasons behind this opposition before making any <br /> decisions and allowing an already unilaterally opposed permit request to <br /> move forward with the conflicting and confusing record presented to the <br /> public. The community deserves accurate records and documents to review, <br /> particularly given the scale of the project and the deep concerns it has <br /> raised. <br /> In conclusion, I respectfully urge the Commission to postpone the Leeward <br /> Planning Commission Meeting on November 21, 2024 to a later date to <br /> maintain the integrity of the public record and ensure that clear and <br /> accurate information is being presented to the public in a clear, transparent <br /> and easily understandable way. <br /> This is essential to preserving public confidence in the planning process and <br /> maintain the collaborative relationship with county officials and the public. <br /> Mahalo for your immediate attention to this confusing and unclear matter of <br /> record. I trust you will prioritize the public's interest and need for <br /> transparency by granting this continuance request, so that the necessary <br /> corrections and clarifications can be made to ensure an accurate public <br /> record is presented to both the public and the Leeward Planning <br /> Commission for comprehensive review. <br /> Lastly, please make sure that this letter is forwarded to Jeff Darrow in the <br /> planning department, that I had the pleasure to speak with last week. <br />
The URL can be used to link to this page
Your browser does not support the video tag.