My WebLink
|
Help
|
About
|
Sign Out
Home
2024-11-20 Noah Walin, Pacific Rim Land, Inc.
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2024
>
2024-11-21 Leeward Special General Plan Meeting
>
LPC Testimony 10/1- 11/20
>
2024-11-20 Noah Walin, Pacific Rim Land, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 1:47:25 PM
Creation date
11/20/2024 1:46:52 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit A <br /> SidneyFuke, Planning Consultant <br /> 100 Pauahi Street,Suite 212•Hilo,Hawaii 96720 •Planning•Variance•Zoning <br /> Telephone:(808)969-1522 Cell:(808)989-0640 •Subdivision•Land Use Permits <br /> E-mail:sidfuke@hawaiiantel.net •Environmental Reports <br /> April 8, 2019 <br /> Mr. Michael Yee,Director <br /> Planning Department <br /> COUNTY OF HAWAII <br /> 101 Pauahi Street <br /> Hilo, HI 96720 <br /> Dear Mr. Yee: <br /> Subject: General Plan Update Request-WQJ2008 Investment, LLC and <br /> Ukumehame Quarry Limited Partner <br /> Waikoloa, South Kohala,Hawaii. TMK: 6-8-001: 066 <br /> Beginning February 6, 2015, the Department officially commenced its mandatory 10-year <br /> comprehensive update of the County General Plan. At that time,your website noted that the <br /> public had an opportunity to provide initial comments on this by June 6, 2015. The Department <br /> would then review these comments and internal and/or consulted studies from June 6 to April <br /> 2017. Preliminary recommendations would then be formulated by the Department which would <br /> then serve as a basis for public workshops. Subsequently, an official draft of the Plan would <br /> then be forwarded to the Leeward and Windward Planning Commissions for public hearings; <br /> revisions would then be made before final recommendatory action is taken by the Commissions. <br /> The County Council,based on the recommended draft of the Plan would then conduct its review <br /> and take appropriate action between August 2017 to January 2018. During the course of this <br /> process,there will understandably be ample opportunity for further public input. <br /> It is our understanding that the proposed schedule noted above has been pushed back due, <br /> in large measure,to other demands placed on the Department. Accordingly and inasmuch as the <br /> Department is still in the throes of preparing the first document that would be used as a basis for <br /> public workshops, on behalf of the landowners (WQJ2008 Investment, LLC and Ukumehame <br /> Quarry Limited Partner(hereinafter referred to collectively as"Applicant")where the major <br /> tenant is Goodfellow Brothers, LLC, we respectfully request your favorable consideration in <br /> having the subject property, identified by TMK: 6-8-001: 006,re-designated on the General Plan <br /> Land Use Pattern Allocation Guide ("LUPAG")map from Extensive Agriculture/Urban <br /> ExpansiontolndustriaL A copy of the letter of authorization from the landowner is attached. <br /> The subject property, consisting of 245+acres, is situated on the south or"Kona" side of <br /> Waikoloa road, midway between Waikoloa Village and the Queen Ka'ahumanu Highway in <br /> Waikoloa, South Kohala,Hawaii. Currently,the site has a quarry with related activities and a <br /> base yard. (Figures 1 and 2) <br />
The URL can be used to link to this page
Your browser does not support the video tag.