My WebLink
|
Help
|
About
|
Sign Out
Home
2024-12-02 Naomi Melamed
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2024
>
2024-12-05 Windward
>
Item #4 County Council (PL-CCI-2024-000009)
>
Individual (37) Testimonies 2024-12-02 Adele Henkel to Zain Yamani
>
2024-12-02 Naomi Melamed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2024 7:56:52 PM
Creation date
12/2/2024 7:56:30 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
12/2/2024
Description
2024-12-02 Naomi Melamed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
or claims pertaining to RF exposure <br /> 6. Existence of appeals process (de novo hearing in front of Planning Board) <br /> Copake New York <br /> (Link to Copake NY code) <br /> Pretesting and post testing by RF engineer <br /> Annual monitoring of RF emissions by the independent RF engineer using actual <br /> field measurements <br /> Hempstead, New York <br /> Wireless Communications Facilities <br /> • Requires a special use permit for cell towers that encourages location of new <br /> wireless facilities so as to minimize their impact on historically sensitive areas <br /> around residences, schools, houses of worship, day-care centers. Seven <br /> consideration factors are listed in order from more to least preferred, with <br /> existing towers being most preferred and new towers in residential zones <br /> least preferred. <br /> • Prohibits towers from exceeding a height that permits it to operate without <br /> artificial lighting <br /> • Allows the town to hire consultants and do inspections <br /> • Set a fee schedule of $500 per pole <br /> • Requires a 4 foot warning sign on the pole <br /> • Utilities at wireless installations should be underground when possible <br /> • Hempstead, New York: Wireless Communications Facilities Ordinance <br /> eCodeChapter 142 <br /> • Other Links <br /> • https://mdsafetech.org/cell-tower-and-city-ordinances/ <br /> • https://hempsteadny.gov/permits-and-applications/wireless-telecom- <br /> ordinance <br />
The URL can be used to link to this page
Your browser does not support the video tag.