Laserfiche WebLink
or claims pertaining to RF exposure <br /> 6. Existence of appeals process (de novo hearing in front of Planning Board) <br /> Copake New York <br /> (Link to Copake NY code) <br /> Pretesting and post testing by RF engineer <br /> Annual monitoring of RF emissions by the independent RF engineer using actual <br /> field measurements <br /> Hempstead, New York <br /> Wireless Communications Facilities <br /> • Requires a special use permit for cell towers that encourages location of new <br /> wireless facilities so as to minimize their impact on historically sensitive areas <br /> around residences, schools, houses of worship, day-care centers. Seven <br /> consideration factors are listed in order from more to least preferred, with <br /> existing towers being most preferred and new towers in residential zones <br /> least preferred. <br /> • Prohibits towers from exceeding a height that permits it to operate without <br /> artificial lighting <br /> • Allows the town to hire consultants and do inspections <br /> • Set a fee schedule of $500 per pole <br /> • Requires a 4 foot warning sign on the pole <br /> • Utilities at wireless installations should be underground when possible <br /> • Hempstead, New York: Wireless Communications Facilities Ordinance <br /> eCodeChapter 142 <br /> • Other Links <br /> • https://mdsafetech.org/cell-tower-and-city-ordinances/ <br /> • https://hempsteadny.gov/permits-and-applications/wireless-telecom- <br /> ordinance <br />