My WebLink
|
Help
|
About
|
Sign Out
Home
WPC Porposed FOF, COL, and D&O (PL-SMA-2024-060)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2024
>
2024-12-05 Windward
>
Item #2 Niel Jayasinghe (PL-SMA-2024-000060)
>
Info given WPC 12/5/24
>
WPC Porposed FOF, COL, and D&O (PL-SMA-2024-060)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2024 8:52:54 AM
Creation date
12/6/2024 8:52:53 AM
Metadata
Fields
Template:
Plan Doc Template
Description
WPC Porposed FOF, COL, and D&O (PL-SMA-2024-060)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
20. At the November 1, 2024 hearing,the Commission continued the matter to <br /> December 5, 2024. <br /> B. PROPOSED PROJECT <br /> 21. Applicant's Special Management Area Permit No. PL-SMA-2024-000060 <br /> proposed to construct a 4-story,41,600 square foot apartment building containing seventeen(17) <br /> rental units and related development on a 19,377 square-foot parcel within the Special <br /> Management Area. <br /> 22. The proposed building featured four(4)stories with two(2)parallel wings, <br /> ground-level parking,and a rooftop terrace. Sixteen(16)of the rental units are proposed to contain <br /> two(2)bedrooms and two(2)bathrooms and one(1)unit is proposed with three(3)bedrooms and <br /> three(3)bathrooms. <br /> 23. The ground floor is proposed to be 11,360 square feet containing a total of <br /> twenty-two (22)parking stalls, including two (2)ADA-accessible stalls. A water service <br /> room, an electrical room, and a trash disposal area are also proposed on this floor. Water is <br /> available through the Hawaii County Department of Water Supply. Water capacity will be <br /> determined in consultation with DWS based on water calculations for the proposed use. <br /> Wastewater will be handled through the county sewer system. <br /> 24. A drainage study completed by Engineering Partners Inc., concluded that two <br /> (2) drywells will be more than adequate to capture and infiltrate the site runoff. Electricity is <br /> available through Hawaiian Electric Light Company. <br /> 25. The proposed purpose of the project is to address the increasing demand for <br /> housing rentals in Hilo. <br /> 26. Project improvements are intended to be completed by mid-2026 with an <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.