My WebLink
|
Help
|
About
|
Sign Out
Home
2025-02-05 Jim McMahon Testimony
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2025
>
2025-02-06 - Windward
>
Item #2 Teppy Mountain, LLC (PL-SPP-2024-000075)
>
Info given WPC 2-6-25 meeting
>
2025-02-05 Jim McMahon Testimony
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2025 10:10:47 AM
Creation date
2/6/2025 10:10:36 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Doesn't appear to have met conditions -base yard <br /> use still appears to be active today <br /> 05- yes Aug- Contractor's <br /> 0009 2005 yard Planning director recommended denial <br /> Approved based on re typed to "an agricultural <br /> trucking baseyard" because 61% of trucking <br /> business is agricultural related including hauling <br /> livestock, ranch and farm supplies <br /> On main highway H-19 <br /> 4 trucks-permit max of 6 <br /> Applicant has addressed the adverse negative visual <br /> impacts by moving all of the heavy equipment into an <br /> area that is not visible from the highway or from <br /> neighboring properties <br /> Conditions: <br /> 0 <br /> Fuel storage, fueling and oil changes shall be <br /> conducted on a paved area <br /> 0 <br /> A description of the 1-acre permit area in map <br /> and written form by metes and bounds as <br /> certified by a registered surveyor shall be <br /> submitted to the Planning Department. All <br /> vehicles and equipment storage shall be <br /> limited to the specified I-acre area. <br /> 02- yes Dec- Base yard <br /> 0031 2002 Class E soils <br /> Borders state highway <br /> 5yr time limit <br /> Building permits (final approval)for all structures <br /> obtained in 6 months <br /> Landscaping <br /> Hours of operation conditions <br />
The URL can be used to link to this page
Your browser does not support the video tag.