My WebLink
|
Help
|
About
|
Sign Out
Home
2024-11-21 Written Testimony Pacific Rim Land Inc.
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2025
>
2025-02-24 Leeward Continuance of Special General Plan Meeting
>
2024-11-21 Leeward Special General Plan Meeting - Introduction & Overview
>
LPC Testimony 10/1- 11/21
>
2024-11-21 Written Testimony Pacific Rim Land Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2024 11:36:33 AM
Creation date
2/21/2025 11:10:16 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
11/19/2024
Description
Written testimony given at LPC 11-21-24 hearing from Pacific Rim Land Inc.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i 1 <br /> recycling of Portland cement concrete and asphalt concrete pavement on the Special <br /> Permit site on approximately 219.990 acres of land situate at Waikoloa, South Kohala, <br /> County and Island of Hawai`i, Tax Map Key No. (3) 6-8-001: 066 (formerly TMK No. <br /> (3) 6-8-001: 005) (the "Application"). <br /> 2. Applicant has operated a quarry at the 219.990 acre site ("Petition Area") since 1995 <br /> under a license agreement with the landowner,which is now WQJ2008 Investment,LLC, <br /> a Washington limited liability company(as to an undivided 85.714%interest), and <br /> Ukumehame Quarry Company Limited Partnership,a Hawai'i limited partnership (as to <br /> an undivided 14.286%interest), as tenants in common("Owner"). <br /> 3. The County of Hawai'i Planning Commission authorized SP 833 at its hearing on <br /> September 22, 1992, and the State of Hawaii Land Use Commission("LUC")issued its <br /> Findings of Fact, Conclusions of Law, and Decision and Order in LUC Docket No. SP92- <br /> 381 authorizing SP 833 on January 19, 1993 ("LUC D&O"). <br /> 4. SP 833 allows the Petition Area to be used for blasting, drilling,rock crushing and <br /> screening, concrete ready-mix batching,pre-casting,asphaltic concrete products <br /> manufacturing equipment and materials storage and repair, and other necessary uses and <br /> activities related to providing a source of rock aggregate and concrete and asphalt <br /> products. <br /> 5. Included with the current Application were 24 exhibits, as follows: (1)Map &Metes and <br /> Bounds Submitted to Planning Department, dated 10/2/92 and Planning Department <br /> Acceptance, dated 10/22/92; (2) Subdivision Map, Sub No. 07-000696; (3)Fee Owner's <br /> Authorization; (3A)Licensee's Authorization; (4)Annual Monitoring Report; (5) 1996 <br /> 4 <br /> SP92-3 81 Waikoloa Development Company <br /> Decision And Order on Motion to Amend <br />
The URL can be used to link to this page
Your browser does not support the video tag.